Villages C P1-LR 920714 reed engineering GEOTECHNICAL CONSULTANT ~ July 14, 1992 Project No. 755.1 Report No. 8 Don A. Tipton, Inc. 6330 Beltline Road, suite C Garland, Texas 75043 ATTN: Mr. Pat Atkins, P.E. Re: Construction Materials Testing Villages of Coppell, Phase IIIB Cheshire Drive Coppell, Texas Gentlemen: Submitted here are the results of testing and observation of construction materials at the referenced project. This report addresses the activities for the period of July 2 through 13, 1992. During the above period a total of 43 field density tests were performed on the fill placed within the residential building pads in Blocks A, B, and C. In addition, four tests were performed on the fill placed within Parker and Beau Drives. Test results are summarized on Plates 1 through 3. A large portion of these tests were taken on fill that was previously placed by the excavation contractor in Blocks C and B. While excavating test pits in these areas, a high PI (42) fill material was encountered. This material was located in Block C, Lots 4 through 9 and Block B, Lots 6 ~through 9. The thickness of this material ranged from two to three feet. The contractor is presently in the process of removing this material from the pad areas and replacing it with an approved material. Compaction tests will be performed on this fill as the material is placed. 2424 STUTZ DRIVE · SUITE400 · DALLAS, TEXAS75235 · 214/350-5600 · (FAX) 214/350-001~ Don A. Tipton, Inc. Project No. 755.1/Report No. 8 July 14, 1992 Page 2 Additional reports will be submitted as the work progresses. If you have any questions, do not hesitate to call. Sincerely, Ronald F. Reed, P.E. BES/RFR/wde copies submitted: (1) Don A. Tipton, Inc./Mr. Pat Atkins, P.E. (3) Grand/Lakes of Coppell III/Mr. Ed Toole ~1) city of Coppell/Engineering Department/ Mr. Larry Davis reed eng.ineering VILLAGES OF COPPELL, PHASE IIIB COPPELL, TEXAS REPORT NO. 8 Field Density Tests Residential Buildinq Pads Depth Com- Below Unit pac- Final Dry Moisture tion Test Block No./ S.G. Weight Content Curve Level No. Lot No. (feet) (DCf) (%) No. (%) 204 C/9 0.0 107.7 18.9 3/8 98.7 205 C/8 0.0 106.4 18.4 3/8 98.0 206 C/7 0.0 108.2 18.8 3/8 99.2 207 C/6 0.0 108.6 19.2 3/8 99.5 208 C/5 0.0 107.6 18.3 3/9 99.1 209 C/9 1.0 93.6 25.8 6 95.3 210 C/8 1.0 95.8 25.1 6 97.6 211 C/7 1.0 95.7 25.3 ...... * 212 C/6 1.0 93.4 26.2 ...... * 213 C/5 1.0 95.0 25.9 ...... * 214 B/9 0.6 109.7 16.0 9 97.9 215 B/7 0.6 113.7 14.6 5/9 98.4 216 B/5 0.6 104.2 20.7 3 99.0 217 B/3 0.6 117.8 13.2 2/3 100.0 218 B/1 1.0 110.0 17.8 3/5 98.1 219 B/9 3.5 96.7 26.3 6 98.5 220 B/9 1.8 83.2 36.2 ...... 221 B/5 3.2 97.2 22.7 6 99.0 222 B/5 1.5 103.2 20.4 6/8 97.7 223 B/20 0.6 110.2 15.4 9 98.4 224 B/18 0.6 111.2 14.0 9 99.3 225 B/16 0.6 109.2 15.0 9 97.5 226 B/14 '0.6 114.6 14.2 1/9 97.0 227 B/12 0.6 98.7 18.3 3 93.8 228 A/29 1.9 99.2 23.4 3 95.0 229 A/31 3.1 99.9 23.6 3 95.0 230 A/33 3.4 101.1 22.0 3 96.0 231 A/35 2.5 101.6 22.9 3 96.6 232 B/10 0.8 102.2 21.6 3 97.1 233 B/ll 0.8 102.7 21.5 3 97.6 234 B/21 0.6 109.2 15.2 9 97.5 235 A/35 2.5 110.9 12.5 9 99.0 236 A/33 4.2 110.6 13.8 9 98.8 237 A/31 3.8 111.2 14,3 9 99.3 238 A/29 3.8 110.0 14.4 9 98.2 GEOTECHNICAL CONSULTANTS Plate 1 reed engineering VILLAGES OF COPPELL,PHASE IIIB COPPELLv TEXAS REPORT NO. 8 (Continued) Field Density Tests Residential Buildlng Pads Depth Com- Below Unit pac- Final Dry Moisture tion Test Block No./ S.G. Weight Content Curve Level Date No. Lot No. (feet) (DCf) (%) No. (%) 07-13-92 239 A/19 6.0 103.7 18.9 3 98.6 240 A/17 0.6 107.2 14.1 9 95.7 241 A/20 0.6 109.8 16.0 9 98.0 242 A/22 0.6 106.5 17.0 9 95.1 243 B/23 0.0 114.2 12.8 5 96.0 244 B/6 1.4 103.5 20.7 3 98.4 245 B/7 2.2 101.0 22.6 3 96.0 246 B/8 2.0 103.7 19.8 3 98.6 * No proctor curve obtained for this material, PI was 42. Material not approved for use on project. GEOTECHNICALCONSULTANTS-- Plate 2 reed engineering VILLAGES OF COPPELL, PHASE IIIB COPPELL, TEXAS REPORT NO. 8 Field Density Tests Street Fills Depth Com- Below Unit pac- Final Dry Moisture tion Test S.G. Weight Content Curve Level Date No. Street STA (feet) (Dcf) (%) No. (%) 07-13-92 247 Parker 9+90 1.2 107.2 16.9 9 95.7 248 Parker 11+50 1.0 108.4 15.6 9 96.8 249 Beau 1+00 0.0 100.8 22.8 3 95.8 250 Beau 2+00 0.0 103.1 22.6 3 98.0 GEOTECHNICAL CONSULTANTS -- ate 3