Villages C P1-LR 920714 reed engineering
GEOTECHNICAL CONSULTANT ~
July 14, 1992
Project No. 755.1
Report No. 8
Don A. Tipton, Inc.
6330 Beltline Road, suite C
Garland, Texas 75043
ATTN: Mr. Pat Atkins, P.E.
Re: Construction Materials Testing
Villages of Coppell, Phase IIIB
Cheshire Drive
Coppell, Texas
Gentlemen:
Submitted here are the results of testing and observation of
construction materials at the referenced project. This report
addresses the activities for the period of July 2 through 13, 1992.
During the above period a total of 43 field density tests were
performed on the fill placed within the residential building pads in
Blocks A, B, and C. In addition, four tests were performed on the
fill placed within Parker and Beau Drives. Test results are
summarized on Plates 1 through 3.
A large portion of these tests were taken on fill that was
previously placed by the excavation contractor in Blocks C and B.
While excavating test pits in these areas, a high PI (42) fill
material was encountered. This material was located in Block C,
Lots 4 through 9 and Block B, Lots 6 ~through 9. The thickness of
this material ranged from two to three feet. The contractor is
presently in the process of removing this material from the pad
areas and replacing it with an approved material. Compaction tests
will be performed on this fill as the material is placed.
2424 STUTZ DRIVE · SUITE400 · DALLAS, TEXAS75235 · 214/350-5600 · (FAX) 214/350-001~
Don A. Tipton, Inc.
Project No. 755.1/Report No. 8
July 14, 1992
Page 2
Additional reports will be submitted as the work progresses. If you
have any questions, do not hesitate to call.
Sincerely,
Ronald F. Reed, P.E.
BES/RFR/wde
copies submitted: (1) Don A. Tipton, Inc./Mr. Pat Atkins, P.E.
(3) Grand/Lakes of Coppell III/Mr. Ed Toole
~1) city of Coppell/Engineering Department/
Mr. Larry Davis
reed eng.ineering
VILLAGES OF COPPELL, PHASE IIIB
COPPELL, TEXAS
REPORT NO. 8
Field Density Tests
Residential Buildinq Pads
Depth Com-
Below Unit pac-
Final Dry Moisture tion
Test Block No./ S.G. Weight Content Curve Level
No. Lot No. (feet) (DCf) (%) No. (%)
204 C/9 0.0 107.7 18.9 3/8 98.7
205 C/8 0.0 106.4 18.4 3/8 98.0
206 C/7 0.0 108.2 18.8 3/8 99.2
207 C/6 0.0 108.6 19.2 3/8 99.5
208 C/5 0.0 107.6 18.3 3/9 99.1
209 C/9 1.0 93.6 25.8 6 95.3
210 C/8 1.0 95.8 25.1 6 97.6
211 C/7 1.0 95.7 25.3 ...... *
212 C/6 1.0 93.4 26.2 ...... *
213 C/5 1.0 95.0 25.9 ...... *
214 B/9 0.6 109.7 16.0 9 97.9
215 B/7 0.6 113.7 14.6 5/9 98.4
216 B/5 0.6 104.2 20.7 3 99.0
217 B/3 0.6 117.8 13.2 2/3 100.0
218 B/1 1.0 110.0 17.8 3/5 98.1
219 B/9 3.5 96.7 26.3 6 98.5
220 B/9 1.8 83.2 36.2 ......
221 B/5 3.2 97.2 22.7 6 99.0
222 B/5 1.5 103.2 20.4 6/8 97.7
223 B/20 0.6 110.2 15.4 9 98.4
224 B/18 0.6 111.2 14.0 9 99.3
225 B/16 0.6 109.2 15.0 9 97.5
226 B/14 '0.6 114.6 14.2 1/9 97.0
227 B/12 0.6 98.7 18.3 3 93.8
228 A/29 1.9 99.2 23.4 3 95.0
229 A/31 3.1 99.9 23.6 3 95.0
230 A/33 3.4 101.1 22.0 3 96.0
231 A/35 2.5 101.6 22.9 3 96.6
232 B/10 0.8 102.2 21.6 3 97.1
233 B/ll 0.8 102.7 21.5 3 97.6
234 B/21 0.6 109.2 15.2 9 97.5
235 A/35 2.5 110.9 12.5 9 99.0
236 A/33 4.2 110.6 13.8 9 98.8
237 A/31 3.8 111.2 14,3 9 99.3
238 A/29 3.8 110.0 14.4 9 98.2
GEOTECHNICAL CONSULTANTS
Plate 1
reed engineering
VILLAGES OF COPPELL,PHASE IIIB
COPPELLv TEXAS
REPORT NO. 8
(Continued)
Field Density Tests
Residential Buildlng Pads
Depth Com-
Below Unit pac-
Final Dry Moisture tion
Test Block No./ S.G. Weight Content Curve Level
Date No. Lot No. (feet) (DCf) (%) No. (%)
07-13-92 239 A/19 6.0 103.7 18.9 3 98.6
240 A/17 0.6 107.2 14.1 9 95.7
241 A/20 0.6 109.8 16.0 9 98.0
242 A/22 0.6 106.5 17.0 9 95.1
243 B/23 0.0 114.2 12.8 5 96.0
244 B/6 1.4 103.5 20.7 3 98.4
245 B/7 2.2 101.0 22.6 3 96.0
246 B/8 2.0 103.7 19.8 3 98.6
* No proctor curve obtained for this material, PI was 42.
Material not approved for use on project.
GEOTECHNICALCONSULTANTS--
Plate 2
reed engineering
VILLAGES OF COPPELL, PHASE IIIB
COPPELL, TEXAS
REPORT NO. 8
Field Density Tests
Street Fills
Depth Com-
Below Unit pac-
Final Dry Moisture tion
Test S.G. Weight Content Curve Level
Date No. Street STA (feet) (Dcf) (%) No. (%)
07-13-92 247 Parker 9+90 1.2 107.2 16.9 9 95.7 248 Parker 11+50 1.0 108.4 15.6 9 96.8
249 Beau 1+00 0.0 100.8 22.8 3 95.8
250 Beau 2+00 0.0 103.1 22.6 3 98.0