August 12, 1991
Project No. 755
Grand/Lakes of Coppell III
c/o Don A. Tipton, Inc.
6330 Beltline Road, Suite C "
Garland, Texas 75043
ATTN: Mr. Pat Atkins, P.E.
Re: ?9G Letter
Fill Observation and Testing
Lakes of Coppell, Phase III
Coppell, Texas
Gentlemen:
Our firm was retaine~ by Grand/Lakes of coppell III to'observe and
test the earth fill placed at the referenced ~ite.. This work wa~
accomplished using the'specifications attached to our geot~chnioal
report dated JUly, 1991. To the best of our knowledge, t_he fill
was placed and compaCted by the contractor in accordance with these
specifications. Ail site'filling has now been completed.
If any questions arise, do not hesitate to call.
/- / ~"-~'/ !/'/ ~,i.,~.,~ ..... ~'.~
.... ~?o~'~ *,~- ~ ~ ~ ~
copies submitted= (2) Don A. Tipton, Inc.
(~) ~rand/Lake~ of Coppell III
Attn: Mr. Ed Toole
~424 STUTZ DRIVE · -SUITE 400 · DALLAS, TEXAS 75235 · 214/350-5600 · (FAX) 214t350-0019
FILE No. 683 04/08 '95 11:02 ID:TIPTON ENGINEERING 214 226 1946 PAGE 6
reed engineering
GEOTIECHNICAL ~ ON-~U LTA N TS
September 30, 1992
Project No. 755.1
Report No. 13
Don A. Tipton, Inc.
6330 Beltline Road, Suite C
Garland, Texas 75043
ATTN: Mr. Pat Atkins, P.E.
Re: Construction Materials Testing
Residential Building Pads
Villages of Coppell, Phase IIIB
Coppell, Texas
Gentlemen:
Submitted here are the results of testing and observation of
construction materials at the referenoed projeot. This report
addresses the fill placement, in the residential building pads from
Segtember 14 through 30, 1992.
During %he above period, 20 field density tests were taken on the
fill placed in the residential building pads in Blocks A and B of
Phase iIIB. Test results are shown on Plate 1. Where tested, the
fill was found %o comply with the project specifications.
Additional reports will be submitted as the work progresses.
Sincerely,
RFR/wde
copies submitted: ~) Don A. Tipton, Inc./Mr. Pat Atkins, P.E.
(3) Grand/Lakes of Coppell III/Mr. Ed Toole
(1)City of Coppell/~.ngineering Department/
Mr. Larry Davim
2424 STUTZ DRIVE · SUITE400 · DALLAS, TEXAS75235 · 214.t350-5600 · (FAX) 214/350-0019
.FILE No. 683 04/08 '95 11:02 ID:TIPTON ENGINEERING 214 226 1946 PAGE 7
reed engineering
VILLAGES OF COPPELL~ PHASE IIIB
COPPELL~, TEXAS
REPORT NO. 13
FSeld Density. Tests
on Residq~ia! Bqildinq Pads
Depth Com-
Below Unit puc-
Final Dry Mois=ure tion
Test Block Lot S. G, Weight content curve Level
Date No, No, No, (feet) fDcf.~ (%] No, [%)
09-15-92 359 A 39 2.0 111.9 15,7 11 97.3
360 A 37 2,0 109,2 17.0 11 95,0
09-16-92 361 A 36 0.0 112.2 12.8 11 97.5
362 A 38 2,0 110,2 12,5 11 95.8
363 A 41 1,5 113,0 11,8 11 98.3
364 A 41 1.0 109.1 13.2 11 95.0
09-17-92 365 A 34 0.0 112.4 12.9 11 9'7,7
366 A 32 0.0 112.4 14.1 11 97.7
367 A 30 0.0 113.4 12.9 11 98.6
09-18-92 368 A 28 0.0 113.1 13.5 11 98.3
369 A 26 0.0 111.9 14.6 11 97.3
09-28-92 370 A 24 0.0 108.7 15.9 11 95.1
371 A 22 0.0 110.0 15.1 11 95.6
372 A 20 0.0 109.2 15,8 11 95.0
09-29-92 373 A 39 0,0 109,9 15.5 11 95,6
374 B 10 0,O 109,4 15.0 11 95,1
09-30-92 37§ A 41 0,O 110,2 13.4 11 95.8
376 A 37 0.0 110.3 14.1 11 95.9
377 B 12 0.0 113.2 14.0 11 98.a
378 B 14 O.0 110.0 14.4 11 95.
G~:OT ECI-INICAL CONSULTANTS
Pl ate 1
FILE Ho. 683 04/08 '95 11:00 ID:TIPTON ENGINEERING 214 226 ~946 PAGE 2
reed engineering
GEE)TECHNICAL CO NSU LTANT~
November 11, 1992
Project No. 755.1
Lakes of Coppell, Phase III General Partnership
c/o Don A. Tipton, Inc.
6330 Beltline Road, Suite C
Garland, Texas 75043
ATTN: Mr. Pat Atkins, P.E.
Re: 79G Letter
Field Density Testing
Lakes of Coppell, Phase IIIB
Coppell, Texas
Gentlemen:
Our fi~m was retained by Lakes of Coppell, Phase III General
Partnership to perform field density tests on the fill placed at the
refer~gced.site. This work was accomplished using the earthwork
specifications attached to our geotechnical report dated July, 1991.
To the best of our knowledge, the fill was placed and compacted by
the contractor in accordance with the specifications. Ail sate
filling has now been completed.
If any questions arise, do not hesitate to call.
Sincerely,
Ronald F. Reed, P.E.
RFR/wde