Loading...
Villages C P1-LR 910812FILE No. 683 04/08 '95 11:01 ID:TIPTON ENGINEERING 214 226 1946 PAGE 3 reed engineering.' GEOTEC~ICAL August 12, 1991 Project No. 755 Grand/Lakes of Coppell III c/o Don A. Tipton, Inc. 6330 Beltline Road, Suite C " Garland, Texas 75043 ATTN: Mr. Pat Atkins, P.E. Re: ?9G Letter Fill Observation and Testing Lakes of Coppell, Phase III Coppell, Texas Gentlemen: Our firm was retaine~ by Grand/Lakes of coppell III to'observe and test the earth fill placed at the referenced ~ite.. This work wa~ accomplished using the'specifications attached to our geot~chnioal report dated JUly, 1991. To the best of our knowledge, t_he fill was placed and compaCted by the contractor in accordance with these specifications. Ail site'filling has now been completed. If any questions arise, do not hesitate to call. /- / ~"-~'/ !/'/ ~,i.,~.,~ ..... ~'.~ .... ~?o~'~ *,~- ~ ~ ~ ~ copies submitted= (2) Don A. Tipton, Inc. (~) ~rand/Lake~ of Coppell III Attn: Mr. Ed Toole ~424 STUTZ DRIVE · -SUITE 400 · DALLAS, TEXAS 75235 · 214/350-5600 · (FAX) 214t350-0019 FILE No. 683 04/08 '95 11:02 ID:TIPTON ENGINEERING 214 226 1946 PAGE 6 reed engineering GEOTIECHNICAL ~ ON-~U LTA N TS September 30, 1992 Project No. 755.1 Report No. 13 Don A. Tipton, Inc. 6330 Beltline Road, Suite C Garland, Texas 75043 ATTN: Mr. Pat Atkins, P.E. Re: Construction Materials Testing Residential Building Pads Villages of Coppell, Phase IIIB Coppell, Texas Gentlemen: Submitted here are the results of testing and observation of construction materials at the referenoed projeot. This report addresses the fill placement, in the residential building pads from Segtember 14 through 30, 1992. During %he above period, 20 field density tests were taken on the fill placed in the residential building pads in Blocks A and B of Phase iIIB. Test results are shown on Plate 1. Where tested, the fill was found %o comply with the project specifications. Additional reports will be submitted as the work progresses. Sincerely, RFR/wde copies submitted: ~) Don A. Tipton, Inc./Mr. Pat Atkins, P.E. (3) Grand/Lakes of Coppell III/Mr. Ed Toole (1)City of Coppell/~.ngineering Department/ Mr. Larry Davim 2424 STUTZ DRIVE · SUITE400 · DALLAS, TEXAS75235 · 214.t350-5600 · (FAX) 214/350-0019 .FILE No. 683 04/08 '95 11:02 ID:TIPTON ENGINEERING 214 226 1946 PAGE 7 reed engineering VILLAGES OF COPPELL~ PHASE IIIB COPPELL~, TEXAS REPORT NO. 13 FSeld Density. Tests on Residq~ia! Bqildinq Pads Depth Com- Below Unit puc- Final Dry Mois=ure tion Test Block Lot S. G, Weight content curve Level Date No, No, No, (feet) fDcf.~ (%] No, [%) 09-15-92 359 A 39 2.0 111.9 15,7 11 97.3 360 A 37 2,0 109,2 17.0 11 95,0 09-16-92 361 A 36 0.0 112.2 12.8 11 97.5 362 A 38 2,0 110,2 12,5 11 95.8 363 A 41 1,5 113,0 11,8 11 98.3 364 A 41 1.0 109.1 13.2 11 95.0 09-17-92 365 A 34 0.0 112.4 12.9 11 9'7,7 366 A 32 0.0 112.4 14.1 11 97.7 367 A 30 0.0 113.4 12.9 11 98.6 09-18-92 368 A 28 0.0 113.1 13.5 11 98.3 369 A 26 0.0 111.9 14.6 11 97.3 09-28-92 370 A 24 0.0 108.7 15.9 11 95.1 371 A 22 0.0 110.0 15.1 11 95.6 372 A 20 0.0 109.2 15,8 11 95.0 09-29-92 373 A 39 0,0 109,9 15.5 11 95,6 374 B 10 0,O 109,4 15.0 11 95,1 09-30-92 37§ A 41 0,O 110,2 13.4 11 95.8 376 A 37 0.0 110.3 14.1 11 95.9 377 B 12 0.0 113.2 14.0 11 98.a 378 B 14 O.0 110.0 14.4 11 95. G~:OT ECI-INICAL CONSULTANTS Pl ate 1 FILE Ho. 683 04/08 '95 11:00 ID:TIPTON ENGINEERING 214 226 ~946 PAGE 2 reed engineering GEE)TECHNICAL CO NSU LTANT~ November 11, 1992 Project No. 755.1 Lakes of Coppell, Phase III General Partnership c/o Don A. Tipton, Inc. 6330 Beltline Road, Suite C Garland, Texas 75043 ATTN: Mr. Pat Atkins, P.E. Re: 79G Letter Field Density Testing Lakes of Coppell, Phase IIIB Coppell, Texas Gentlemen: Our fi~m was retained by Lakes of Coppell, Phase III General Partnership to perform field density tests on the fill placed at the refer~gced.site. This work was accomplished using the earthwork specifications attached to our geotechnical report dated July, 1991. To the best of our knowledge, the fill was placed and compacted by the contractor in accordance with the specifications. Ail sate filling has now been completed. If any questions arise, do not hesitate to call. Sincerely, Ronald F. Reed, P.E. RFR/wde copies submitted: (1) 2424 sTU'I"Z DRIVE · SUITE400 · DALLAS, TEXAS75235 a 21~3§~5600 · (FAX)214/35~0019