Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Villages C P1-LR 931216
GeO-~ CONS~Ar,TING ENGINEERS IN: TECHNIQUE [ ~ronmenta[ Assessments ~. Soils & Fou~ations Construction Hate~ia[s Testing "Excet[ence b'/ E~rience" C~ercia[ & l~ustria[ Inspection PO aox 9~48 * ~u~hl~:~, ~exa~; 76092 · (817) ~29-0281 FIELD COMPACTION REPORT PROJECT: Villages of Coppell IV-B LOCATION: Coppell JOB #: 93-959 DATE: 12-16-93 DAY: Thursday TIME: 4:00pm CLIENT: Grand Homes, Inc CONTRACTOR: Grand Homes, Inc WATER DRY ~R- ~EST PROCTOR CONT. DEN CENT NO. LOCATION AND LIFT NUMBER (%) (PCF) COMP 1. 826 Cheshire FG 1 25.8 90.8 95.0 REMARKS: Ail tests passed. Minimum Compaction Required: 95% Minimum of 4 tests per trip. FG = Final Grade PROCTORS: 1. Dark Brown & Brown Sandy Clay 95.7 PCF @ 26.1% MOISTURE Shane Robinson Technician