Loading...
Verizon-LR 990527CONCRETE COMPREgSIVE STRENGTH TEST 8901 Carpenter Frwy., Suite #100 Dallas, T~ss 75247 Date of Service: 04/28/1999 Report No.: 9911909 Report Date 05/2711999 Client No.: 08644025 Project No.: 43-2333-98 Client: The Beck Group Project: GTE Shared Services Attn: Gillett Berger Coppell Road & Corporate Drive 1700 Pacific Ave., Suite 3800 Dallas TX 75201-4619 Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. PROJECT DATA CONTRACTOR: BECK CONCmgTE CLASS: 8205 CONCRETE SUPPLIgR: TXI PLACEMENT DATE: 0412811999 BATCH TIME: 3:30pm PLm~rr: 41 TIME SAMPLED: 4:45pm BY: Shane Stephens SPECIFICATION REQUIREMENTS WEATHER cosorrloNs: Warm, sunny, calm STm~NGTIt: 4000 psi @ 28 Days TEMPERATURE (F) - AIR 85 F CONCRETE: 78 F SLUMP: 4-6" TRUCK NO: 461 TICKET NO: 1300755 AIR: 3-6% AIR co~rrg~rr (~): 4.1 UNIT WEIGHT (pef)L N/A TEST M~IOD: ASTM C- 143 -- PLACEMENT LOCATION: Paving at northwest entrance ASTM C-172 ASTM C-39 SAMPLE LOCATION: See below REPORT OF TESTS ACCUMULATIVE YARDS: 70 CYLINDER MEASURED MAXIblUM COMPRESSIVE MARKED SLUMP DATE AGE LOAD STRENGTH FRACTURE SET NO. (in~he~) TESTED (days) (1~. force) (psi) TYPE I I 6.00 05~05~ 1999 7 102700 3630 I 2 6.00 05/26/1999 28 148420 5250 I 3 6.00 05/26/1999 28 143620 5080 Average 5170 Sample location: 40' North x 45' east of northwest corner of building on east side of colored arch concrete center. Technician: Shane Spinks Started: 12:00pm Finished: 5:00pm ~ E_~ Report Distribution: ( I ) The Beck Group (I) The Beck Group ( I ) Gromatzky Dupree & Assoc. (I) Dalcan, Inc. Euge~C'gtar~ur (I) Brockette Davis Drake. Inc. (I) HBC Engineering/Eugene Harbour Vice President ( I ) The Beck Group This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. OILL Page 1 of 1 I