Verizon-LR 990525CONCRETE COMPRESSIVE STRENGTH TEST
8901 Carpenter Frwy., Suite #100
DaUas, Texas 75247
Date of Service: 04/19/1999 Report No.: 9910970 Report Date
05/25/1999
Client No.: 08644025 Project No.: 43-2333-98
Client: The Beck Group Project: GTE Shared Services
Attn: Gillett Berger Coppell Road & Corporate Drive
1700 Pacific Ave., Suite 3800
Dallas TX 75201-4619 Coppell, Texas
Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast
compressive strength samples.
PROJECT DATA
CONTRACTOR: BECK CONCRETE CLASS: 8205
CONCRETE SUPPLIER: TXI PLACEMENT DATE: 04/19/1999 BATCiITIME: 3:35am
PLANT: 41 TIME SAMPLED: 4:03am BY: Darrin Phillips
SPECil:iCATION REQUIREMENTS WEATHER CONDITIONS: Clear
STRENGTII: 4000 psi @ 28 Days TEMPERATURE (F). AIR 50 F CONCRETE: 55 F
st.uMP: 5.0" Max TRUCK NO: 454 TICKET NO: ! 291132
Am: 3-6% AIR CONTENT (%): 5.2 UNIT WEIGIIT (pcl'):. N/A
TEST METllOI): ASTM C- 143 PLACEMENT LOCATION:
Paving parking, south center of building
ASTM C- 172
ASTM C-39
SAMPLE LOCATION: See below
REPORT OF TESTS ACCL IIJLATIVE YARDS: 60
CYLINDER MEASURED ~tAXIMU3,1 COMPRESSIVE
bLARKED SLUMP DATE AGE LOAD STRENGTIt FRACTURE
SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE
I 1 5.50 04/26/1999 7 95730 3390
I 2 5.50 04/26/1999 7 93470 3310
Average 3350
I 3 5.50 05/17/1999 28 147550 5220
I 4 5.50 05/17/1999 28 147610 5220
Average 5220
Sample location:40 yards S & 60 yds. west from che southwest corner of building.
This report is exclusively for Ihe use of the client indicated above atld shall not be reproduced except in full without the written approval of H BC Engineering, lac.
OILL Page 1 of 5
l
· CONCRETE COMPRESSIVE STRENGTH TES'
8901 Carpenter Frwy., Suite #100
Dallas, Texas 75247
Date of Service: 04/19/1999 Report No.: 9910970 Report Date
05/2511999
Client No.: 08644025 Project No.: 43-2333-98
Client: The Beck Group Project: GTE Shared Services
Attn: Oillett Berger Coppell Road & Corporate Drive
1700 Pacific Ave., Suite 3800
Dallas TX 75201-4619 Coppell, Texas
Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast
compressive strength samples.
PROJECT DATA
CONTRACTOR: BECK CONCRETE CLASS: 8205
CONCRETE SUPPLIER: TXI PLACEMENT DATE: 0411911999 BATCit TIME: 5:03am
PLA~rr: 41 TIMESA,~tPLED: 5:42am BY: Dan'in Phillips
SPECIFICATION REQUIREMENTS WEATiIER CONDITIONS: Clear
STRENGTm 4000 psi @ 28 Days TEMPERATURE (F)- AIR 51 ~' CONCRETE: 59 F
SLtrMp: 5.0" Max TRUCK NO: 454 TICKET NO: 1291219
AIR: 3-6% AIR CONTENT (%): 4.9 UNIT WEIGHT (pc0: N/A
TEST METIIOD: ASTM C- 143 PLACEMENT LOCATION:
See page I
ASTM C- 172
ASTM C-39
SAMPLE LOCATION: See below
REPORT OF TESTS ACCUMVL TrVE YARDS: 160
CYLINDER MEASURED MAX~IUM COMPRESSIVE
MARKED SLUMP DATE AGE LOAD STRENGTH FRACTURE
SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE
2 I 5.75 04/26/1999 7 113740 4020
2 2 5.75 04126/1999 7 111900 3960
Average 3990
2 3 5.75 05/17/1999 28 129840 4590
2 4 5.75 05/17/1999 28 122690 4340
Average 4470
Sample location: 50 Yards south/ 50 yards west from the southwest corner of
building
This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc.
011.L Page 2 of 5
CONCRETE COMPRESSIVE STRENGTH TES3.
8901 Carpenter Frwy., Suite #100
Dntt~ Texas 7S247
Date of Service: 04/19/1999 Report No.: 9910970 Report Date
05/25/1999
Client No.: 08644025 Project No.: 43-2333-98
Client: The Beck Group Project: GTE Shared Services
Attn: Gillett Berger Coppell Road & Corporate Drive
1700 Pacific Ave., Suite 3800
Dallas TX 75201-4619 Coppell, Texas
Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast
compressive strength samples.
PROJECT DATA
CONTRACTOR: BECK CONCRETE CLASS: 8205
CONCRETE SUPPLIER: TXI PLACEMENT DATE: 04/19/1999 BATCII TIME: 6:54am
PLANT: 41 TIME SAMPLED: 7:19am BY: Darrin Phillips
SPECIFICATION REQUIREMENTS WEATHER CONDITIONS: Clear
ST~NGTm 4000 psi @ 28 Days TEMI'ERATURE (F). Am 51 F CONCRETE: 60 F
SLLrMP: 5.0" Max TRUCK NO: 470 TICKET NO: 1291383
AIR: 3-6% AIR CONTENT (%): 5.1 UNIT WEIGltT (pcf): N/A
TEST METIIOD: ASTM C- 143 PLACEMENT LOCATION:
See page I
ASTM C- 172
ASTM C-39
SAMPLE LOCATION: See below
REPORT OF TESTS ACCUMULATIVE YARDS: 260
CYLINDER MEASURED MAXIMUM COMPRF_~SIVE
MARKED SLUMP DATE AGE LOAD STRENGTH FRACTURE
SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE
3 I 5.50 04/26/1999 7 128010 4530
3 2 5.50 04/26/1999 7 130600 4620
Average 4580
3 3 5.50 05/17/1999 28 163610 5790
3 4 5.50 05/17/1999 28 173010 6120
Average 5960
Sample location: 70 yards south/ 10 yards west from the southwest corner of
building
This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc.
0iLL Page 3 of 5
CONCRETE COMPRESSIVE STRENGTH TES i
8901 Carpenter Frwy. Suite #100
Dallas, Texas 75247
Date of Service: 04/19/1999 Report No.: 9910970 Report Date
05/25/1999
Client No.: 08644025 Project No.: 43-2333-98
Client: The Beck Group Project: GTE Shared Services
Atto: Gillett Berger Coppell Road & Corporate Drive
1700 Pacific Ave., Suite 3800
Dallas TX 75201-4619 Coppell, Texas
Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast
compressive strength samples.
PROJECT DATA
CONTRACTOm BECK CONCRETW CLASS: 8205
CONCg~rE SUPPLmm TXI PLACEMENT DATE: 04/19/1999 ~ATClt TIMV.: 8:24am
PLANT: 41 TIME SAMPLED: 9:00am I~¥: Darrin Phillips
SPECIFICATION REQUIREMENTS WEATIIgR CO~q~iTIONS: Clear
STRENGTH: 4000 psi @ 28 Days TEMPERATURE (F) - AIR 61 F CONCRETE: 67 F
SL~IP: 5.0" Max TRUCK NO: 459 TICKg'r NO: 1291614
AIR: 3-6% AIR CONTENT (%): 5.0 UNIT WEIGtlT (pcl'): N/A
TEST METIIOD: ASTM C-143 PLACEMENT LOCATION:
See page I
ASTM C-172
ASTM C-39
SAMPLE LOCATION: See below
REPORT OF TESTS ACCU3,1ULATIVE YARDS: 360
CYLINDER MEASURED MAX~UGM COMPRESSIVE
bL~,RKED SLUMP DATE AGE LOAD STRENGTH FRACTURE
SET NO. (inches) T~TED (days) (lbs. force) (psi) TYPE
4 I 5.50 04/26/1999 7 115760 4090
4 2 5.50 04/26/1999 7 110470 3910
Average 4000
4 3 5.50 05/17/1999 28 147340 5210
4 4 5.50 05/17/1999 28 153780 5440
Average 5330
Sample location: 50 Yards south/35 yards west from ~he southeast of building
This report is exclusively for the use of the client indicated above and shall no~ be reprodu~d except in full without ~he wriuen approval of HBC Engineering, Inc.
OII.L Page 4 of 5
CONCRETE COMPRESSIVE STRENGTH TEST
8901 Carpent~ Frwy., Suite #100
Date of Service: 04119/1999 Report No.: 9910970 Report Date
05/25/1999
Client No.: 08644025 Project No.: 43-2333-98
Client: The Beck Group Project: GTE Shared Services
Attn: Gillett Berger Coppell Road & Corporate Drive
1700 Pacific Ave., Suite 3800 Coppell, Texas
Dallas TX 75201-4619
Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast
compressive strength samples.
PROJECT DATA
CONTRACTOR: BECK CONCRETE CLASS: 8205
CONCRETE SUPPLIER: TXI PLACEMENT DATE: 04/19/1999 BATCil TIME: 9:56am
PLANT: 41 TIME SAMPLED: 10:58am BY: Darrin Phillips
SPECIFICATION REQUIREMENTS WEATltERCONDITIONS: Clear
STRENGTII: 4000 psi @ 28 Days TEMPERATURE (F) - AIR 61 F CONCRETE: 65 F
SLUMP: 5.0" Max TRUCK NO: 457 TICKET NO: 1291796
AIR: 3-6% AIR CONTENT (%): 4.9 UNIT WEIGllT (pcf}: N/A
TEST METiIOD: ASTM C- 143 PLACEMENT LOCATION:
See page I
ASTM C-172
ASTM C-39
SAMPLE LOCATION: Sec below
REPORT OF TESTS ACCUMULATIVE YARDS: 460
CYLINDER MEASURED MAXIMUM COMPRESSIVE
MARKED SLUMP DATE AGE LOAD STRENGTH FRACTURE
SET NO. (inch.) TESTED (days) (lbs. force) (psi) TYPE
5 I 5.50 04/26/1999 7 104760 3700
5 2 5.50 04/26/1999 7 106370 3760
Average 3730
5 3 5.50 05/17/1999 28 140530 4970
5 4 5.50 05/17/1999 28 I a//.50 51 l0
Average 5040
Sample location: 60 Yards south/75 yards west from the southeast of building
Technidan: Darrin PhillipSReport Distribution:Started: 2:30am Finished: l:00pm I--l~ EnglneeM~~c~.~~_~
(1) The Beck Group ( I ) The Beck Group
(1) Gromau:ky Dupree & Assoc. (I) Dalcan, Inc. Euget.~CHarbour
(!) Brock~tte Davis Drake. Inc. (I) HBC Enginecring/Eugene Harbour Vice President
(I) The Beck Group
This report is exclusively for the use of thc client indicated above and shall not be reproduced except in full without thc written approval of HBC Engineering, Inc.
0ILL Page 5 of 5
8901 Carpenter Frwy., Suite #100
Dallas, Texas 75247
Date of Service: 03/24/1999 Report No.: 9908540 Report Date
05/25/1999
Client No,: 08644025 Project No,: 43-2333-98
Client: The Beck Group Project: GTE Shared Services
Attn: Gillett Berger Coppell Road & Corporate Drive
1700 Pacific Ave., Suite 3800
Dallas TX 75201-4619 Coppell, Texas
Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast
compressive strength samples.
PROJECT DATA
CONTRACTOR: BECK CONCRETE CLASS: 8208
CONCRETE SUPPLIER: TXI PLACEMENT DATE.: 03/24/1999 BATCll TIME: 3:22am
PLANT: 41 TIME SAMPLED: 4:05am BY: Mike Odom
SPECH"ICATION REQUIREMENTS WEATIIER CONDITIONS: Partly cloudy
STRENGTII: 5000 psi @ 28 Days TEMPERATURE (F)- AIR 50 F CONCRETE: 68 F
SLtrMP: 6" max. TRUCK NO: 669 TICKET NO: 1268830
AiR: N/A AIR CONTENT (%): N/A UNIT WEIGIIT (pcf)r N/A
TEST METIIOD: ASTM C- 143 PLACEMEN'F LOCATION:
Roof Slab. Area C. lines 13 to 18 and E to H
ASTM C-172
ASTM C-39
SAMPLE LOCATION: E. 5114
REPORT OF TESTS ACCUMULATIVE YARDS: 50
CYLINDER MEASURED MAXIMUM COMPRESSIVE
IVL.~ RKED SLUMP DATE AGE LOAD STRENGTIt FRACTURE
SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE
I I 6.00 03126/1999 2 80260 2840
I 2 6.00 03/31/1999 7 145970 5160
I 3 6.00 03/31/1999 7 136260 4820
Average 4990
I 4 6.00 04/21/1999 28 206730 7310
I 5 6.00 04/21/1999 28 205800 7280
Average 7300
I 6 6.00 05/19/1999 56 208690 7380
This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering. Inc.
01SS Page I of 9
Report No.: 9908540
Test Cylinder 1-1 at 7:30 a.m. on 03/26/99
This report is exclusively for the usc of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering. Inc.
(IISS Page 2 of 9
CONCRETE COMPRESSIVE STRENGTH TEST 2-'I C
8901 Carpenter Frwy., Suite #100
DaLlas, Texas 75247
Date of Service: 03/24/1999 Report No.: 9908540 Report Date
05/25/1999
Client No,: 08644025 Project No,: 43-2333-98
Client: The Beck Group Project: GTE Shared Services
Attn: Gillett Berger Coppell Road & Corporate Drive
1700 Pacific Ave., Suite 3800
Dallas TX 75201-4619 Coppell, Texas
Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast
compressive strength samples.
PROJECT DATA
CONTRACTOR: BECK coscm,:'rE CLASS: 8208
CONCRETE SUPPLIER: TXI PLACEMEN'r DATE: 03/24/1999 BATCHTIME: 4:45am
PLANT: 41 TIME SAMPLED: 5: 15am BY: Mike Odom
SPECIFICATION REQUIREMENTS WEATIIER CONDITIONS: Partly cloudy
STRENGTll: 5000 psi @ 28 Days TEMPEI~.TURE (F) - AIR 55 F CONCRETE: 68 F
SLUMP: 6" max. T~tUCK ~O: 835 TICKET NO: 1268917
AIR: N/A AIR CONTENT (%): 1.8 UNIT WEIGIIT (per): N/A
TEST METllOD: ASTM C- 143 PLACEMENT LOCATION:
See page I.
ASTM C- 172
ASTM C-39 Air confirmation test was performed on this set of cylinders.
SAMPLE LOCATION: Along line F. 5115.5
REPORT OF TESTS ACCUM'ULATIVE YARDS: 160
CYLINDER MEASURED MAXIMUm-! COMPRESSIVE
MARKED SLUMP DATE AGE LOAD STRENGTII FRACTURE
SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE
2 I 5.75 03/26/1999 2 79690 2820
2 2 5.75 03/31/1999 7 150450 5320
2 3 5.75 03/31/1999 7 141350 5000
Average 5160
2 4 5.75 04/21 / 1999 28 194740 6890
2 5 5.75 04/21/1999 28 188270 6660
Average 6780
2 6 5.75 05/19/1999 56 200010 7070
This report is exclusively for the usc of the client indicated above and shall no~ be reproduced except in full without thc wriuen approval of H BC Engineering. Inc.
01SS Page 3 of 9
Report No.: 9908540 a~
Test Cylinder 2-1 at 7:30 a.m. on 03/26/99
This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering. Inc.
OISS Page 4 of 9
'CONCRETE COMPRESSIVE STRENGTH TEST
8901 Carpenter Frwy., SuRe #100
Dallas, Texas 75247
Date of Service: 03/24/1999 Report No.: 9908540 Report Date
05/2511999
Client No.: 08644025 Project No.: 43-2333-98
Client: The Beck Group Project: GTE Shared Services
Attn: Gillett Berger Coppeil Road & Corporate Drive
1700 Pacific Ave., Suite 3800
Dallas TX 75201-4619 Coppell, Texas
Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast
compressive strength samples.
PROJECT DATA
CONTRACTOR: BECK CONCRETE CLASS: 8208
CONCRETE SUPPLIER: TXI PLACEMENT DATE: 03~24~ 1999 BATCll TIME: 6L 12am
PLANT: 41 TIME SAMPLED: 6:55am BY: Mike Odom
SPECIFICATION REQUIREMENTS WEATIlER CONDITIONS: Cloudy, no wind
STRENGTII: 5000 psi @ 28 Days TEMP~.RATUm*- ¢;)- AIR 67 V CONCRETE: 66 F
SLUMP: 6" max. TRUCK NO: 454 TICKET NO: 1269017
AIR: N/A AIR CO,Wmh~T (~): N/A UNIT WEIGHT (poD:. N/A
TEST METiiOD: ASTM C- 143 PLACEMENT LOCATION:
See page I.
ASTM C- 172
ASTM C-39
SAMPLE LOCATION: Lines E.5 to F along line 16
REPORT OF TESTS ACCUI fULATIVE YARDS: 270
CYLINDER MEASURED IVL~XIMUM COMPRESSIVE
b&4, RKED SLUMP DATE AGE LOAD STRENGTH FRACTURE
SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE
3 I 6.00 03/26/1999 2 83570 2960
3 2 6.00 03/31/1999 7 140470 4970
3 3 6.00 03/31/1999 7 148980 5270
Average 5120
3 4 6.00 00/21/1999 28 190680 6740
3 5 6.00 04/21/1999 28 183750 6500
Average 6620
3 6 6.00 05/19/1999 56 198830 7030
This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering. Inc.
01SS Page 5 of 9
Report No.: 9908540
Test Cylinder 3-1 at 12:00 p.m. on 03/26/99
This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc.
OISS Page 6 of 9
CONCRETE COMPRESSIVE STRENGTH TEST
8901 Carpenter Frwy., Suite #I00
DAli.s, Texas 75247
Date of Service: 03/24/1999 Report No.: 9908540 Report Date
05/25/1999
Client No.: 08644025 Project No.: 43-2333-98
Client: The Beck Group Project: GTE Shared Services
Attn: Gillett Berger Coppell Road & Corporate Drive
1700 Pacific Ave., Suite 3800
Dallas TX 7520 !-4619 Coppell, Texas
Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast
compressive strength samples.
PROJECT DATA
CONTRACTOR: BECK CONCRETE CLASS: 8208
CONCRETE SUPPLIER: TXI PLACEMENT DATE: 03/24/1999 BATCH TIME: 8:4 !am
PLANT: 41 TIME SAMPLED: 9:30am BY: Mike Odom
SPECIFICATION REQUIREMENTS WEATIIER CONOrrIONS: Cloudy
STRENGTII: 5000 psi @ 28 Days TEMPERATURE (F) - AIR 53 V CONCRETE: 68 F
SUt~lP: 6" max. TRUCKNO: 837 TICKETNO: 1269423
AIR: N/A AIR CONTENT (%): N/A uNrr WEIGHT (pcf).: N/A
TEST METllOD: A STM C-143 PLACEMENT LOCATION:
See page 1.
ASTM C-172
ASTM C-39
SAMPLE LOCATION: Line F at line 17
REPORT OF TESTS ACCUMULATIVE YARDS: 430
CYLINDER MEASURED MAXIMUM COMPRESSIVE
MARKED SLUMP DATE AGE LOAD STRENGTH FRACTURE
SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE
4 I 5.75 03/26/1999 2 80240 2840
4 2 5.75 03/31/1999 7 140690 4980
4 3 5.75 03/31/1999 7 144450 5110
Average 5050
4 4 5.75 04/21/1999 28 209100 7390
4 5 5.75 04/21/1999 28 199020 7040
Average 7220
4 6 5.75 05/19/1999 56 206780 7310
This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without ~hc written approval of HBC Engineering, Inc.
01SS Page 7 of 9
Report No.: 9908540
Test Cylinder 4-1 at 12:00 p.m. on 03/26/99
This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc.
01SS Page 8 of 9
CONCRETE COMPRESSIVE STRENGTH TEST:
8901 Carpenter Frwy., Suite #100
Dallas, Texas 75247
Date of Service: 03/24/1999 Report No.: 9908540 Report Date
05/25/1999
Client No.: 08644025 Project No.: 43-2333-98
Client: The Beck Group Project: GTE Shared Services
Attn: Gillett Berger Coppell Road & Corporate Drive
1700 Pacific Ave., Suite 3800
Dallas TX 75201-4619 Coppell, Texas
Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast
compressive strength samples.
PROJECT DATA
CONTRACTOR: BECK CONCRETE CLASS: 8208
CONCRETE SUPPLIER: TXI PLACEMr2~T OATE: 03/24/1999 BATCH TIME: I0:13am
PLANT: 41 TIME SAMPLED: 10:45am BY: Mike Odom
SPECIFICATION REQUIREMENTS WEATHER COt~rrIoNS: Partly cloudy
STRENGTII: 5000 psi @ 28 Days TEMPERATURE: (F). AIR 62 F CONCRETE: 70 F
SLt~,fP: 6" max. TRUCK NO: 450 TICKET NO: 1269657
AIR: N/A AIR CONTENT {%): N/A UNIT WEIGHT (pe~ N/A
TEST METIIOD: ASTM C-143 PLACEMENT LOCATION:
See page I
ASTM C- 172
ASTM C-39
SAMPLE LOCATION: Line G.5, lines 17.5 to 18
REPORT OF TESTS ACCUMULATIYE YARDS: 510
CYLINDER MEASURED MAXIMUM COMPRESSIVE
blARKED SLUMP DATE AGE LOAD STRENGTH FRACTURE
SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE
5 I 4.75 03/26/1999 2 90670 3210
5 2 4.75 03/31/1999 7 147420 5210
5 3 4.75 03/3111999 7 141350 5000
Average 5110
5 4 4.75 04/21/1999 28 200990 7110
5 5 4.75 04/21/1999 28 193080 6830
Average 6970
5 6 4.75 05/19/1999 56 201340 7120
Technician: Mike Odom Started: 2:00am Finished: l:00pm ~ Eroi~~Ing,
Inc.
Report Distribution:
( I ) Thc Beck Group ( I ) The Beck Group
(I) Gromatzky Dupree & Assoc. (I) Dalcan, Inc. ,,,_ Eugene Harbour
(i) Brockette Davis Drake, Inc. (I) H BC Engineering/Eugene Harbour ~
Vice
President
( I ) The Beck Group
This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc.
oISS Page 9 of 9
CONCRETE COMPRESSIVE STRENGTH TES3
8901 Carpenter Frwy., Suite #100
D~llas, Texas 75247
Date of Service: 04/2111999 Report No.: 9911208 Report Date
05/25/1999
Client No.: 08644025 Project No.: 43-2333-98
Client: The Beck Group Project: GTE Shared Services
Attn: Gillett Berger Coppell Road & Corporate Drive
1700 Pacific Ave., Suite 3800
Dallas TX 75201-4619 Coppell, Texas
Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast
compressive strength samples.
PROJECT DATA
CONTRACXOR: BECK COSCm~TE CLASS: 8205
CONCRETE SUPPLIER: TXI I'LACEMENT OATE: 04/21/1999 BATCH T~Sm: 3:02am
PLA~: 41 TIME SAMPLED: 3:50am ay: Dakin Phillips
SPECIFICATION ~;QUI~MEN~ WEATllER CONOmONS: Clear
ST~NGTI[: 4~ psi ~ 28 Days r~MP~mXTU~ (Fi. AIR 68 F CONC~E: 73 F
SLUMP: 5.0" Max TaUCK NO: 420 T~CK~ NO: 1294022
AIR: 3-6% AIR CONTE~ (%): 5.7 UNIT WEIGltT (pcfl: N/A
TEST METIIOD: ASTM C- 143 PI.ACF~ME~ LOCATION:
Paving Parking/~w~t comer of building
ASTM C- 172
ASTM C-39
SAMPLE LOCATION: See ~low
REPORT OF TESTS acc~,~v~ YA~S: 40
CYLI~ER MEASU~D W~X~mM COMP~SSIVE
b~D SL~P DATE AGE LOAD ST~NGTH F~C~
SET NO. (inch.) TESTED (days) (lbs. force) (psi) TYPE
I I 6.50 ~/28/1999 7 84020 2970
I 2 6.50 ~/28/1999 7 82810 2930
Avenge 2950
I 3 6.50 05/19/1999 28 120390 4260
I 4 6.50 05/19/1999 28 121950 4310
Average 4290
Sample ~oaa~on: 20 Yds. ~./8
This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering. Inc.
0l[.l. Page I of 5
CONCRETE COMPRESSIVE STRENGTH TEST
8901 Carpenter Frwy., Suite #100
Dallas, Texas 75247
Date of Service: 04/21/1999 Report No.: 9911208 Report Date
05/25/1999
Client No.: 08644025 Project No.: 43-2333-98
Client: The Beck Group Project: GTE Shared Services
Attn: Gillett Berger Coppell Road & Corporate Drive
1700 Pacific Ave., Suite 3800
Dallas TX 75201-4619 Coppell, Texas
Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast
compressive strength samples.
PROJECT DATA
CONTRACTOR: BECK CONC~'~rE CLASS: 8205
CONCRETE SUPPLIER: TXI PLACEMENT DATE: 0412111999 BATCHTIME: 4:36am
PLANT: 4! TIME SAMPLED: 5:20am BY: Dan'in Phillips
SI'ECli.'ICATION REQUIREMENTS WEATIIER CoNDrrIONS: Clear
STRENGTII: 4000 psi @ 28 Days TEMPERATURE (F) - AIR 68 F CONCRETE: 75 F
SLUMI': 5.0" Max TRUCK NO: 816 TICKL:r NO: 1294110
AIR: 3-6% AIR CONTEN~r (%): 5.8 UNIT WEIGIIT (pc/); N/A
T~ST MET~IOD: ASTM C- 143 PLACEMENT LOCATION:
See page I
ASTM C- 172
ASTM C-39
SAMPLE LOCATION: See below ' ' - -
REPORT OF TESTS ACCUMULATIVE YARDS: 140
CYLINDER MEASURED bLA X~IL~'! COblPRF_~SIVE
MARKED SLUMP DATE AGE LOAD STRENGTH FRACTURE
SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE
2 I 7.00 04/28/1999 7 87280 3090
2 2 7.00 0412811999 7 86900 3070
Average 3080
2 3 7.00 05/19/1999 28 128840 4560
2 4 7.00 05/19/1999 28 117760 4160
Average 4360
Sample location: 10 Yards west/ 20 yards north form the northwest corner of
building
This repor~ is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of H BC Engineering, Inc.
OILL Page 2 of 5
iBC
CONCRETE COMPRESSIVE STRENGTH TES'!
8901 Carpenter Frwy., Suite #100
Dall~, Texas 75247
Date of Service: 04/21/1999 Report No.: 9911208 Report Date
05/25/1999
Client No.: 08644025 Project No.: 43-2333-98
Client: The Beck Group Project: GTE Shared Services
Attn: Gillett Berger Coppell Road & Corporate Drive
1700 Pacific Ave., Suite 3800
Dallas TX 75201-4619 Coppell, Texas
Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast
compressive strength samples.
PROJECT DATA
CotcrRACXOR: BECK CONCRETE CLASS: 8205
CONCRETE SUPPLIER: TXI PLACEMENT DATE: 04/21/1999 BATCti TIME: 6:14am
PLANT: 41 TIME SAMPLED: 7:10am BY: Darrin Phillips
SPECIFICATION REQUIREbiENTS WEATIIER CONOrrIONS: Clear
STRENGTH: 4000 psi @ 28 Days TEMPERATURE (lq - AIR 68 F CONCRETE: 77
SLUMP: 5.0" Max TRUCK NO: 431 TICKET NO: 129422
AIR: 3-6% AIR CONTENT (%): 5.7 UNIT WEIGHT (pcf)-. N/A
TEST ME'nIOO: ASTM C- 143 PLACE,XlENT LOCATION:
See page I
ASTM C- 172
ASTM C-39
SAMPLE LOCATION: See below
REPORT OF TESTS ACCUMULATIVE YARDS: 240
CYLINDER blEASURED MAXI~UtYM COMPRESSIVE
MARKED SLUMP DATE AGE LOAD STRENGTH FRACTURE
SET NO. (inch.) TESTED (days) (lbs. force) (psi) TYPE
3 I 6.50 04/28/1999 7 93550 33 I0
3 2 6.50 04/28/1999 7 87590 3100
Average 3210
3 3 6.50 05/19/1999 28 120570 4260
3 4 6.50 05/19/1999 28 122120 4320
Average 4290
Sample location: 40 Yards west/15 yards north from the northwest corner of
building.
This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc.
0ILL Page 3 of 5
I
CONCRETE COMPRESSIVE STRENGTH TES'I'
ENGIHEERIN~, INC.
8901 Carpenter grwy., Suite #100
Dallas, Te~s 7S247
Date of Service: 04/21/1999 Report No.: 9911208 Report Date
05/25/1999
Client No.: 08644025 Project No.: 43-2333-98
Client: The Beck Group Project: GTE Shared Services
Attn: Gillett Berger Coppell Road & Corporate Drive
1700 Pacific Ave., Suite 3800
Dallas TX 75201-4619 Coppell, Texas
Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast
compressive strength samples.
PROJECT DATA
cowrRACTOR: BECK CONCRETW CLASS: 8205
CONCRETE SUPPLIER: TXI PLACEMENT DATE: 04/21/1999 BATCH TIME: 7:32am
Pl.nwr: 41 TIME SAMPLED: 8:35am BY: Darrin Phillips
SPECIFICATION REQUIREMENTS WEATHER CONDITIONS: Clear
ST~NGTH: 4000 psi @ 28 Days TEMPERATURE (~3- AIR 71 F CONCRETE: 75 F
SLUMP: 5.0" Max TRUCK NO: 814 TIcKrr NO: 1294374
AIR: 3-6% AIR CONTENT (%): 5.9 UNIT WEIGtIT (pef):- N/A
TEST M~rliOD: ASTM C- 143 P~C~ENT LOCATION:
See page I
ASTM C- 172
ASTM C-39
SAMPLE LOCATION: See below
REPORT OF TESTS ACCUMULATIVE YARDS: 340
CYLINDER MEASURED MAXFbIUM COMPRESSIVE
MARKED SLUMP DATE AGE LOAD STRENGTH FRACTURE
SET NO. (inehes) TESTED (days) (lbs. force) (psi) TYPE
4 I 6.00 04/28/1999 7 85690 3030
4 2 6.00 04/28/1999 7 83710 2960
Average 3000
4 3 6.00 05/19/1999 28 119860 4240
4 4 6.00 05/19/1999 28 128910 4560
Average 4400
Sample location: 30 yards south/70 yards east from the southwest corner of
building
This reDon is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc.
OILL Page 4 of 5
i
CONCRETE COMPRESSIVE STRENGTH TES't'
ENGINEERIN3, INC.
8901 Carpenter Frwy., Suite #100
Dnll~s, Texas 75247
Date of Service: 04/21/1999 Report No.: 99! 1208 Report Date
05/25/1999
Client No.: 08644025 Project No.: 43-2333-98
Client: The Beck Group Project: GTE Shared Services
^ttn: Gillett Berger Coppell Road & Corporate Drive
1700 Pacific Ave., Suite 3800
Dallas TX 7520!-46!9 Coppell, Texas
Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast
compressive strength samples.
PROJECT DATA
CONTRACTOR: BECK CONCRETE CLASS: 8205
CONCRLrrE SUPPLIER: TXI PLACEMENT DAT~: 04/21/1999 BATCH TIME: 10:18am
PLANT: 41 TIME SAMPLED: I l:40am t~Y: Darrin Phillips
SPECIFICATION REQUIREMENTS WEATllER CONDrrioNs: Cloudy
STRENGTII: 4000 psi @ 28 Days TEMPERATURE (F) - AIR 71 F CONCRETV-: 75 g
SLUMP: 5.0" Max TRUCK NO: 365 TICKET NO: 1294746
AIR: 3-6% AIR CONTENT (%): 5.8 UNIT w~lGtrr (~c0~ N/A
TEST METIlOD: ASTM C- 143 PLACEMENT LOCATION:
See page I
ASTM C-172
ASTM C-39
SAMPLE LOCATION: See below
REPORT OF TESTS ACCUMUt. A'nVE YARDS: 440
CVLemER Mv-ASUREZ) MAX n:M COm'RESSlVE
MARKED SLUMP DATE AGE LOAD STRENGTH FRACTURE
SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE
5 I 6.00 04/28/1999 7 91150 3220
5 2 6.00 04/28/1999 7 " 82940 2930
Average 3080
5 3 6.00 05/19/1999 28 l 11660 3950
5 4 6.00 05/19/1999 28 103460 3660
Average 3810
Sample location: 10 yards south/ 5 yards east from the southwest corner of
building.
Technician: Dan'in Phillips Started: 2:30am Finished: l:30pm ~ ~e
Report Distribution: ering, Inc.
( I ) The Beck Group ( 1 ) The Beck Group
( I ) Gromatzky Dupree & Assoc. ( I ) Dalcan, inc. Eugene Harbour
(i) Brockette Davis Drake. Inc. (I) H BC Engineering/Eugene Harbour ~ Vice President
( I ) The Beck Group
-j
This report is exclusively for the use of Iht client indicated above and shall not be reproduced except in full without thc written approval of HBC Engineering, Inc.
0ILL Page 5 of 5