Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Villages C P1-LR 940125
GEO CON~'~ TING ENGINEERS IN: TECHNIQUE Env~ ronmenta[ Assessments ~ Sci ts & Foundations Construction Materials Testing "E~.cu[ Lence by Exper"~ence" Cr~ercia[ [ Irdustria[ Inspection PO ~ox 925L8 · ~c:u:h[ake, rexa:~ 76092 · (817) 329-02[.~1 FIELD COMPACTION REPORT PROJECT: Villages of Coppeil IV-B LOCATION: Coppell JOB #: 93-959 DATE: 01-25-94 DAY: Tuesday TIME: 2:00pm CLieNT: Grand Homes, Inc CO~~ ~nd T-!~e~, rnc~ WATER DRY PER- TEST PROCTOR CONT. DEN CENT NO. LOCATION AND LIFT NUMBER (%) (PCF) COMP 1. 814 Chesire FG 4 14.5 114.6 98.4 REMARKS: All tests passed. Minimum Compaction Required: 95% MJnimtll:,~ of 4 tests per i::~'ip. FG = Final Grade PROCTORS: 4. Reddish Brown Clayey Sand 116.4 PCF @ 12.2% MOISTURE Jeff Holden Technician