Loading...
Verizon-LR 990518CONCRETE COMPRESSIVE STRENGTH TEST 8901 Carpente~ Frwy., Suite #100 Dnlln% Texas 75247 Date of Service: 03/19/1999 Report No.: 9908127 Report Date 05/18/1999 Client No.: 08644025 Project No.: 43-2333-98 Client: The Beck Group Project: GTE Shared Services Attn: Gillett Berger Coppell Road & Corporate Drive 1700 Pacific Ave., Suite 3800 Dallas TX 75201-4619 Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. PROJECT DATA cowrRACXOR: BECK CONCh-rY. CLASS: 9508 CONCRE'rE SUPPLIER: TXI PLACEblENTDATE: 03/19/1999 BATCHTIME: 10:09am PLANT: 41 TIME SAMPLED: 10:45am BY: Mike Odom SPECIFICATION REQUIREMENTS WEATIIER CONDrrlONS: Cloudy STRENGTIi: 4000 psi @ 28 Days TEMPERATURE (F)- AIR 56 ~' CONCRETE: 69 F SCtmtP: 6.0" max TRUCK NO: 389 TICKET NO: 1265771 AIR: N/A AIR CONTENT (%): N/A UNIT WEIGItT (pcf):, N/A 'rEST METIIOD: ASTM C- 143 PLACEMENT LOCATION: Level I. Area ~ dock ramp walls ASTM C- 172 ASTM C-39 SAMPLE LOCATION: North wall, second lift REPORT OF TESTS ACCUMULATIVE YARDS: 20 CYLINDER MEASURED MAXIMUM COMPRESSIVE MARKED SLUMP DATE AGE LOAD STRENGTII FRACTURE SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE I I 5.00 03/26/1999 7 120770 4270 I 2 5.00 03/26/1999 7 128620 4550 Average 4410 I 3 5.00 04/16/1999 28 185270 6550 I 4 5.00 04/16/1999 28 182050 6440 Average 6500 I 5 5.00 05/14/1999 56 196430 6950 Ten (10) gallons of water added. Technician: Mike Odom Started: 9:00am Finished: 1 l:30am ~-~C Fa~ineel~, Inc. Report Distribution: I I ) The Beck Group (I) The Beck Group ' (I) Gromatzky Dupree & Assoc. (I) Dalcan, Inc. t~,.~.O~p ~_ Eu~'fie,~__~_Harbour ti) Brockett~ Davis Drake, Inc. (I) H BC Engineering/Eugene Harbour ---~ President ( I ) The Beck Group This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. 011.L Page 1 of 1