Loading...
Verizon-LR 990514 8901 Carpenter Frwy., Suite #100 Dallas, Tex~s ?$24? Date of Service: 03/17/1999 Report No.: 9907914 Report Date 05/14/1999 Client No.: 08644025 Project No.: 43-2333-98 Client: The Beck Group Project: GTE Shared Services Attn: Gillett Berger Coppell Road & Corporate Drive 1700 Pacific Ave., Suite 3800 Dallas TX 75201-4619 Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. PROJECT DATA CONTRACTOR: BECK CONCRETE CLASS: 8273 CONCRETE SUPPLIER: TXI PLACEMENT DATE: 03/17/1999 BATCIITIME: l:15pm PLANT: 4 1 TIME SAMPLED: 2:00pm BY: Mike Odom SPECIFICATION REQUIREMENTS WEATIIER CONDITIONS: Cloudy STRENGTH: 3500 psi @ 28 Days TEMPERATURE (F)- AIR 74 F CONCRETE: 76 F SLUMP: 6.0" Max TRUCK NO: 472 TICKET NO: 1264982 AIR: 3-6% AIR CONTENT (%): 4. ! UNIT WEIGltT (pcf): N/A TI'-ST MI.'-TIIOI): ASTM C- 143 PLACEMENT LOCATION: Level I. Area A dock slab-on-grade ASTM C-172 ASTM C-39 Twcmy (20) gallons of water added SAMPLE LOCATION: See below REPORT OF TESTS ACCUMULATIVE YARDS: 160 CYLINDER MEASURE. MAX'MUM COMi'R~SlVE MARKED SLUMP DATE AGE LOAD STRENGTh Fi~%CTURE SET NO. (inchcs) TESTED (days) (lbs. force) (psi) TYPE I I 4.25 03/24/1999 7 77430 2740 I 2 4.25 03/24/1999 7 81410 2880 Average 2810 I 3 4.25 04/14/1999 28 124340 4400 I 4 4.25 04/14/1999 28 122120 4320 Average 4360 I 5 4.25 05/12/1999 56 136520 4830 Sample location: Upper (inside) dock slab @ cen~erpoint area. Technician: Mike Odom Started: l:00pm Finished: 5:30pm H~C Enff'ua~n~i Inc. Report Distribution: ( 1 ) The Beck Group ( I ) Thc Beck Group ( I ) Gromatzky I)upr¢¢ & Assoc. ( I ) {)alcan. [,~c. Eugene Harbour ( i ) Br~x:kcttc Davis Drake. Inc. ( I ) H BC Enginccrin~Eugcn¢ I-larlx~ur Vice President ~ I ) Thc Beck Group This report is exclusively I'~,r thc usc ol'lh¢ clicn! indicated above and shall not loc reproduced except ~n full withou! thc written approval of HBC Engineering. Inc. ~111.1. l'agc I of i CONCRETE COMPRESSIVE STRENGTH TES I' 8901 Carpenter Frwy., Suite #100 DslI~, T~_* 75247 Date of Service: 03/1711999 Report No.: 9907915 Report Date 0511411999 Client No.: 0864402:5 Project No.: 43-2333-98 Client: The Beck Group Project: GTE Shared Services Attn: GilleR Berger Copp¢ll Road-& Corporate Drive - 1700 Pacific Ave., Suite 3800 Dallas TX 75201-4619 Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. PROJECT DATA cowr~roR: BECK CONCRETE CLASS: 8208 CONCRETE SUPPLIER: TXI PLACEMENT DATE: 03/17/1999 BATCll TIME: 3:13pm PLANT: 41 TIME SAMPLED: 3:50pm BY: Mike Odom SPECIFICATION REQUIREMENTS WEATllER CONDmONS: Cloudy STREN(;Xm 5000 psi @ 28 Days TEMPERATURE(~-AIR 72 F CONCRETE: 76 F SLtn~IP: 6.0" Max TRUCK NO: 802 TICKET NO: 1265234 AIR: N/A AIR CONTENT {%): N/A UNIT WEIGItT (per): N/A 'rEST METIIOD: ASTM C- 143 PLACEMENT LOCATION: Level V roof columns Area C. between Lines E-H & 14-18 ASTM C- 172 ASTM C-39 SAMi'LE LOCATION: F.. @ 16 REPORT OF TESTS ACCUMULATIVE YAm)S: 47 CYLINDER MEASURED MAXI.MUM COMPRESSIVE NIARKED SLUMP DATE AGE LOAD STRENGTII FRACTURE SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE I I 5.50 03/2411999 7 151960 5370 I 2 5.50 03/24/1999 7 149260 5280 Average 5330 I 3 5.50 04/14/1999 28 220680 7800 I 4 5.50 04/14/1999 28 226160 8000 Average 7900 I 5 5.50 05/12/1999 56 238000 8420 Technician: Mike Odom Started: 2:00pm Finished: 5:30pm ~ En I~,'~in~, c. Report Distribution: (I) The Beck Group ( I ) The Beck Group ( I } Gromatzky Dupree & Assoc. ( I ) Dalcan, Inc. Eugene Harbour ~ I ) Brockette Davis DFake. Inc. ( I } tIBC Engineering/Eugene Harbour Vice President ( I ) The Beck Group This report is exclusively for thc usc of thc client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. o11.1. Page I of !