Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Villages C P1-LR 940331
GEO- .... CONS~TING ENGINEERS IN: TECHNIQUE ! ironmenta[ Assessments Z~ soils & Foundations Construction Materiats Testing ~E~cei[er~ce by Expe~;ence'~ Commercial & Industrial inspection PO 8ox 9254S · SouthLske, Texas 76092 · (817) 329-0281 FIELD COMPACTION REPORT ~ PROJECT: Villages of Coppell IV-B LOCATION: Coppell JOB #: 93-959 DATE: 03-31-94 DAY: Thursday TIME: 12 noon CLIENT: Grand Homes, Inc CONTRACTOR: Boykin Construction WATER DRY PER- PROCTOR CONT. DEN CENT NO. LOCATION AND LIFT NUMBER (%) (PCF) COMP 802 Chesire: 1. @ front left corner FG 4 14.1 113.4 97.4 2~ @ front right corner FG 4 13.9 115.0 98.7 REI~J%RKS: All tests passed. Minimum Compaction Required: 95% Minimum of 4 tests Der trip. FG = Final Grade PROCTORS: 4. Reddish Brown Clayey Sand 116.4 PCF @ 12.2% MOISTURE Jeff Holden Technician