Loading...
Verizon-LR 990510CONCRETE COMPRESSIVE STRENGTH TESt! ' 8901 Carpenter Frwy. Suite #100 Dallas, Texas 75247 Date of Service: 04/28/1999 Report No.: 9911909 Report Date 05/10/1999 Client No.: 08644025 Project No.: 43-2333-98 Client: The Beck Group Project: GTE Shared Services Attn: Gillett Berger Coppell Road & Corporate Drive 1700 Pacific Ave., Suite 3800 Coppell, Texas Dallas TX 75201-4619 Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. PROJECT DATA CONTRACTOR: BECK coNcag'rg CgASS: 8205 CONCRETE SUPPLIER: TXI PLACEMENT DA'm: 04/28/1999 BATCtI TIME: 3:30pm PLANT: 4! TIME SAMPLED: 4:45pm BY: Shane Stephens SPECIFICATION REQUIREMENTS WEATI~R CONDITIONS: Warm, sunny, calm STRENGTh: 40~)0 psi @ 28 Days TEMPERATURE (F) - AIR 85 F CONCRETE: 78 F SLUMP: 4-6" - TRUCK NO: 461 TlCKm' NO: 1300755 AIR: 3-6% AIR CONTENT (%): 4. l UNIT WEIGIIT (pct'):. N/A TEST METHOD: ASTM C- 143 PLACEMENT LOCATION: Paving at northwest entrance ASTM C-172 ASTM C-39 SAMPLE LOCATION: See below REPORT OF TESTS ACCUMULATIVE YARDS: 70 CYLINDER MEASURED bLAXIMUM COMPRESSIVE blARKED SLUMP DATE AGE LOAD STRENGTII FRACTURE SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE I I 6.00 05/05/1999 7 102700 3630 I 2 6.00 05/26/1999 28 I 3 6.00 05/26/1999 28 Sample location: 40' North x 45' east of northwest corner of building on east side of colored arch concrete center. Technician: Shane Spinks Started: 12:00pm Finished: 5:00pm Report Distribution: ( I ) The Beck Group ( I ) The Beck Group { I ) Gromatzky Dupree & Assoc. ( I ) Dalcan. Inc. Eugene Harbour (I) Brockette Davis Drake. Inc. (I} HBC Engineering/Eugene Harbour Vice President ( I ) Thc Beck Group This report is exclusively for thc use of the client indicated alT)vt and shall not bc reproduced except in full without the written approval of HBC Engineering, Inc. tlll.I. Page I of 1