Loading...
Verizon-LR 990506CONCRETE COMPRESSIVE STRENGTH TEST 8901 Carpente~ Fr~., Suite #100 Dallas, Texas 75247 Date of Service: 04/21/1999 Report No.: 9911208 Report Date 05/06/1999 Client No.: 08644025 Project No.: 43-2333-98 Client: The Beck Group Project: GTE Shared Services Attn: Gillett Berger Coppell Road & Corporate Drive 1700 Pacific Ave., Suite 3800 Dallas TX 75201-4619 Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. PROJECT DATA CONTRACTOR: BECK CONCRETE CLASS: 8205 CONCRETE SUPPLIER: TXI PLACEMENT DATE: 04/21/1999 BATCH TIME: 3:02am PLANT: 41 TIME SAMPLED: 3:50am BY: Darrin Phillips SPECIFICATION REQUIREMENTS WEATHER CONDITIONS: Clear STRENGTIt: 4000 psi @ 28 Days TF. MPERATURE (F) - AIR 68 g CONCRETE: 73 ]* SLCTMp: 5.0" Max TRUCK NO: 420 TICKET NO: 1294022 AIR: 3-6% AIR CONTENT (%): 5.7 UNIT WEIGHT (pc. Dr N/A 'rEST METI~OD: ASTM C- 143 PLACEMENT LOCATION: Paving Parking southwest comer of building ASTM C-172 ASTM C-39 SAMPLE LOCATION: See below REPORT OF TESTS ACCtn a. ATIVE YARDS: 40 CYLINDER MEASURED MAXIMUM COMPRESSIVE MARKED SLUMP DATE AGE LOAD STRENGTH FRACTURE SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE I I 6.50 04/28/1999 7 84020 2970 I 2 6.50 04/28/1999 7 82810 2930 Average 2950 I 3 6.50 05/19/1999 28 I 4 6.50 05/19/1999 28 Sample location: 20 Yds. W./8 yds. N. from southwest of building This rcpor~ is exclusively for the usc of thc client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering. Inc. OILL Page I of 5 CONCRETE COMPRESSIVE STRENGTH TEST 8901 Carpent~ grwy., Suite #100 Dallas, Texas 75247 Date of' Service: 04/21/1999 Report No.: 9911208 Report Date Client No,: 08~A025 Project No.: 43-2333-98 Client: The Beck Group Project: GTE Shared Services Attn: Gillett Berger Coppell Road & Corporate Drive 1700 Pacific Ave., Suite 3800 Dallas TX 75201-4619 Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. PROJECT DATA CONTP. ACTOR: BECK CONCRE~rE CLASS: 8205 CONCRETE SUPPLIER: TXI PLACEMENT DATE: 04/21! 1999 BATCH T~m: 4:36am PLANT: 41 TIME SAMPLED: 5:20am ST: Darrin Phillips SPECIFICATION REQUIREMENTS WEATIIER CONDITIONS: Clear STRENGTH: 4000 psi @ 28 Days TEMPV. RATURE (F)- AIR 68 r CONCRETE: 75 r St,t~nP: 5.0" Max TRUCK NO: 816 TICKET NO: 12941 l0 AIR: 3-6% AIR CONTENT (%): 5.8 UNIT WEIGHT (l~:f).-- N/A TEST METHOD: ' ASTM C- 143 PLACEMENT LOCATION: See page I ASTM C- !72 ASTM C-39 SAMPLE LOCATION: See below REPORT OF TESTS ACCUMULATIVE YARDS: 140 CYLINDER MEASURED MAXFbIUM COMPRESSIVE MARKED SLUMP DATE AGE LOAD STRENGTH FRACTURE SET NO. (inch.) TESTED (days) (lbs. force) (psi) TYPE 2 I 7.00 04/2811999 7 87280 3090 2 2 7.00 04/2811999 7 86900 3070 Average 3080 2 3 7.00 05/19/1999 28 2 4 7.00 05/19/1999 28 Sample location: 10 Yards west/ 20 yards north form the northwest corner of building This report is exclusively for thc usc of thc client indicated above and shall not bc rcprmluccd except m lull without thc written approval of HBC Engineering. Inc. IIl[.I. Page 2 of 5 CONCRETE COMPRESSIVE STRENGTH TEST 8901 Carpenter Fr~., Suite #100 Dallas, T~xas 75247 Date of Service: 04/21/1999 Report No,: 9911208 Report Date 05/06/1999 Client No.: 08644025 Project No,: 43-2333-98 Client: The Beck Group Project: GTE Shared Services Attn: Gillett Berger Coppell Road & Corporate Drive 1700 Pacific Ave., Suite 3800 Dallas TX 75201-4619 Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. PROJECT DATA Cot~rrRACTOR: BECK CONCRETE CLASS: 8205 CONCRETE SUPPLIER: TXI PLACEMENT DATE: 04/2 1/1999 BATCH TIME: 6:14am PLANT: 4 1 TIME SAMPLED: 7:10am BY: Darrin Phillips SPECIFICATION REQUIREMENTS WEATHER CONOrrIONS: Clear STR~aTH: 4000 psi @ 28 Days TEMPEaATtr~ C/3- AIR 68 r CONCRETE: 77 r SLUM?: 5.0" Max T~UC~: NO: 431 TIClC~r NO: 1294221 AIR: 3-6% Am co~rrEwr (%): 5.7 vNrr W~IOHT (~0.- N/A TEST METHOD: ASTM C- 143 PLACEMENT LOCATION: See page 1 ASTM C-172 ASTM C-39 SAMPLE LOCATION: See below REPORT OF TESTS ACCUMULATIVE YARDS: 240 CYLINDER MEASURED blAXIMUM COMPRESSIVE blARKED SLUMP DATE AGE LOAD STRENGTH FRACTURE SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE 3 1 6.50 04/28/1999 7 93550 3310 3 2 6.50 04/28/1999 7 87590 3100 Average 3210 3 3 6.50 05/19/1999 28 3 4 6.50 05/19/1999 28 Sample location: 40 Yards west/15 yards north from the northwest corner of building. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without thc written approval of HBC Engineering, Inc. 011.l. Page 3 of 5 iBC CONCRETE COMPRESSIVE STRENGTH TEST ENGINEERING, INC. 8901 Carpenter Frwy., Suit~ #100 ~ T,'~ 75247 Date of Service: 04/21/1999 Report No.: 9911208 Report Date 05/0~/1999 Client No.: 08644025 Project No.: 43-2333-98 Client: The Beck Group Project: GTE Shared Services Atto: Gillett Berger Coppell Road & Corporate Drive 1700 Pacific Ave., Suite 3800 Dallas TX 75201-4619 Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. PROJECT DATA CONTRACTOR: BECK CONCRETE CLASS: 8205 CONCRETE SUPPLIER: TXI PLACEMENT DA'~: 04/21/1999 BATCH Tn~E: 7:32am PLANT: 41 TIME SAMPLED: 8:35am BY: Darrin Phillips SPECIFICATION REQUIREMENTS WEATHER CoNorrIONS: Clear S~U~NaT~: 4000 psi @ 28 Days TEMPERATURE (~-AIR 71 F CONCRETe: 75 F SLUMP: 5.0" Max TRUCK NO: 814 TICKET NO: 1294374 AIR: 3-6% Am CONTENT (%): 5.9 UNIT WEIGHT (poD= N/A TEST METHOD: ASTM C-143 PLACEMENT LOCATION: See page I ASTM C- 172 ASTM C-39 SAMPLE LOCATION: See below REPORT OF TESTS ACCUma,SX~E YARDS: 340 CYLINDER MEASURED MAX~fUM COMPRESSIVE blARKED SLUMP DATE AGE LOAD STRENGTH FRACTURE SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE 4 I 6.00 04/28/1999 7 85690 3030 4 2 6.00 04/28/1999 7 83710 2960 Average 3000 4 3 6.00 05/19/1999 28 4 4 6.00 05/19/1999 28 Sample location: 30 yards south/70 yards east from the southwest corner of building This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering. Inc. OILI. Page4 of 5 CONCRETE COMPRESSIVE STRENGTH TEST 8901 Carpenter grwy., Suite #100 Dallas, Texas 75247 Date of Service: 04/21/1999 Report No.: 9911208 Report Date 05/06/1999 Client No.: 08644025 Project No.: 43-2333-98 Client: The Beck Group Project: GTE Shared Services Attn: Gillett Berger 1700 Pacific Ave., Suite 3800 Coppell Road & Corporate Drive Dallas TX 75201-4619 Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. PROJECT DATA cowrancroa: BECK CONCRETE CLASS: 8205 CONCRETE SUPPLIER: TXI PLACE~Et~ DATE: 04/21/1999 BATCH TIME: 10:18am PLAwr: 41 TIME SAMPLED: lh40am BY: Darrin Phillips SPECIFICATION REQUIREMENTS WEATHER con~rr~oNs: Cloudy SYRENG'm: 4000 psi @ 28 Days TEMPERATURE (~. AlS 71 F CONCRETE: 75 F SLUMP: 5.0" Max WaVCKNO: 365 TIcKwr NO: 1294746 AiR: 3-6% AIR coNaxtcr (%): 5.8 uNrr WEiGn"r (oc0: N/A TEST METHOD: ASTM C-143 PLACEMENT LOCATION: ASTM C- 172 See page I ASTM C-39 SAMPLE LOCATION: See tm:low REPORT OF TESTS ACCVM LAXIVE YAMS: CYLINDER MEASURED MAXIMUM COMPRESSIVE MARKED SLUMP DATE AGE LOAD STRENGTH FRACTURE SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE 5 I 6.00 04/28/1999 7 9 ! 150 3220 5 2 6.00 04/28/1999 7 82940 2930 Average 3080 5 3 6.00 05/19/1999 28 5 4 6.00 05/19/1999 28 Sample location: 10 yards south/ 5 yards east from the southwest corner of building. Technician: Dan'in Phillips Started: 2:30am Finished: [:30pm ~ ngi~/n Report Distribution: E g, Inc. ( I ) The Beck Group { I ) The Beck Group ( I ) Gromatzky Duple & Assoc. ( I ) Dalcan, Inc. Eugene Harbour (I) Breckettc Davis Drake, Inc. (I) HBC Engineerin~Eugcnc Harbour Vice President ( I ) The Beck Group This report is exclusively for thc use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. OI LI. Page 5 of 5