Loading...
Verizon-LR 990505CONCRETE COMPRESSIVE STRENGTH TES'I ' 8901 Carpenter Frwy. Suite #100 Dallas, Tex~ 7~;247 Date of Service: 03/09/1999 Report No.: 9907123 Report Date 05/05/1999 Client No.: 08644025 Project No.: 43-2333-98 Client: The Beck Group Project: GTE Shared Services Attn: Gillett Berger Coppell Road & Corporate Drive 1700 Pacific Ave., Suite 3800 Dallas TX 75201-4619 Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. PROJECT DATA CONTRACTOR: BECK CONCRETE CLASS: 8208 CONCRETE SUPPLIER: TXI PLACEMENT DATE: 03/09/1999 BATCHT[ME: 12:27pm PLANT: 41 TIME SAMPLED: l:05pm BY: Mike Odom SPECIFICATION REQUIREMENTS WEATHER CONDrrIoNS: Fair STRENGTH: 5000 psi @ 28 Days TEMPERATURE (F) - AIR 62 F CONCRETV-: 67 F SLUbiP: 6.0" Max TRUCK NO: 459 TICKET NO: !259513 AIR: N/A AIR CONTENT (%): 1.2 UNIT WEIGHT {pef): N/A TEST METROD: ASTM C- 143 PLACEMENT LOCATION: (20) Columns Area C Level V, E-H. 14-18 ASTM C-172 ASTM C-39 SAMPLE LOCATION: E-18 & F-18 REPORT OF TESTS ACCUMULATIVE YARDS: 44- CYLINDER MEASURED MAXIMUM CObl~RESSIVE MARKED SLUMP DATE AGE LOAD STRENGTtl FRACTURE SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE I I 5.75 03/16/1999 7 I 18640 4200 I 2 5.75 03/16/1999 7 123070 4350 Average 4280 I 3 5.75 04/06/1999 28 146920 5200 I 4 5.75 04/06/1999 28 152030 5380 Average 5290 I 5 5.75 05/04/1999 56 162110 5730 Ten (10) gallons of water added. Technician: Mike Odom Started: l:00pm Finished: 4:00pm Report Distribution: (I) The Beck Group (1) The Beck Group ¢ I ) Gromatzky I)upree & Assoc. ( I ) Dalcan. Inc. Eugene'Harbour II ) Brockette Davis Drake. Inc. (I) HBC Engineerin~Eugenc Harbovr Vice President ( I ) The Beck Grtmp This report is exclusively for thc use of thc client indicated above and shall not bc reproduced except in full without the writteq approval of HBC Engineering. Inc. 011.1. Page I of i