Verizon-LR 990504CONCRETE COMPRESSIVE STRENGTH TESI' '
8901 Carpenter Frwy., Suite #100
Dallas, Texas 75247
Report Date
Date of Service: 03/08/1999 Report No.: 9906983
05/04/1999
Client No.: 08644025 Project No.: 43-2333-98
Client: The Beck Group Project: GTE Shared Services
Attn: Gillett Bergcr Coppell Road & Corporate Drive
1700 Pacific Ave., Suite 3800
Dallas TX 752014619 Coppell, Texas
Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast
compressive strength samples.
PROJECT DATA
COSTRACTOR: BECK CONCRETE CLASS: 8208
CONCRETE SUPPLIER: TXI PLACEMENT DATE: 03/08/1999 BATCH TIME: 3:08am
PLANT: 31 TIME SAMPLED: 3:55am BY: Mike Odom
SPECIFICATION REQUIREMENTS WEATHER CON'orrIoNS: Cloudy, drizzle
STRENGTH: 5000 psi @ 28 Days TEMPERATURE (F)- AIR 49 F CONCRETE: 68 F
SLUMP: 6" Max TRUCK NO: 479 TICKET NO: 1208732
AIR: N/A AIR CONTENT (%): N/A UNIT WEIGHT (pet): N/A
'rEST MZ'mOO: ASTM C-143 PLACEMENT LOCATION:
Building Slab. Level IV, Area C. line E to H and 13 to 18
ASTM C- 172
ASTM C-39
SAMPLE LOCATION: E. I and 13. I
REPORT OF TESTS ACCtr .ATn'E YARDS: 500
CYLI ER MEASURED M xImrM COMPRESSIVE
MARKED SLUMP DATE AGE LOAD STRENGTIt FRACTURE
SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE
I I 5.25 03/l 0/1999 2 106190 3760
I 2 5.25 03/15/1999 7 146180 5170
I 3 5.25 03/15/1999 7 156050 5520
Average 5350
I 4 5.25 04/05/1999 28 183760 6500
! 5 5.25 04/05/1999 28 180350 6380
Average 6440
I 6 5.25 05/03/1999 56 197350 6980
This report ~s exclusively for Ihe use of Ihe cliem indicated above and shall not be reproduced except in full v,,ithout the written approval of HBC Engineering. Inc.
01TM Page I of 6
· R. eport No.: 9906983
Ten (10) Gallons of water added.
This report ,s exclusively for thc usc of thc ellen! indicated above and shall not bc reproduced except in full x~ ithout thc written approval of HBC Engineering. Inc.
01T3,1 Page 2 of 6
CONCRETE COMPRESSIVE STRENGTH TEST
8901 Carpenter Frwy., Suite #100
Dallas, Texas 75247
Report Date
Date of Service: 03/08/1999 Report No.: 9906983
05/04/1999
Client No.: 08644025 Project No.: 43-2333-98
Client: The Beck Group Project: GTE Shared Services
Attn: Gillett Berger Coppell Road & Corporate Drive
1700 Pacific Ave., Suite 3800
Dallas TX 75201-4619 Coppell, Texas
Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast
compressive strength samples.
PROJECT DATA
CONT~,CTOR: BECK CONCRE't~ CLASS: 8208
CONCRetE St~PPLIV-R: TXI Pt,ACEM~rr DAT~: 03/08/1999 BATCH TIME: 4:57am
PLANT: 31 TIME SAMPLED: 5:45am BY: Mike Odom
SPECIFICATION RF. QUIREMENTS WEATHER CONDITIONS: Cloudy, No Drizzle
STRENGTti: 5000 psi @ 28 Days TEMPERATURE (F} - AIR 52 F CONCRETE: 68 F
SLtrMP: 6" Max TRUCK NO: 738 TICr~-'r NO: 1258745
AIR: N/A AIR CONTENT (%): N/A UNIT WEIGHT (peg):. N/A
TEST METIIOD: ASTM C- 143 PLACEMENT LOCATION:
Same as Set I
ASTM C- 172
ASTM C-39
SAMPLE LOCATION: E.3 at 15.3
REPORT OF TESTS ACCUMULATIVE YARDS: 500
CYLINDER MEASURED blAXIMUM COMPRESSIVE
bls, RKED SLUMP DATE AG E LOAD STRENGTtI FRACTURE
SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE
2 I 5.50 03/10/1999 2 107120 3790
2 2 5.50 03/15/1999 7 152300 5390
2 3 5.50 03/15/1999 7 158590 5610
Average 5500
2 4 5.50 04/05/1999 28 180350 6380
2 5 5.50 04/05/1999 28 179790 6360
Average 6370
2 6 5.50 05/03/1999 56 192110 6790
This report is exclusively for the use of Ibc client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering. Inc.
OITM Page 3 of 6
. Report No.: 9906983
NOTE: 15 Gallons of water added to concrete.
This report is exclusively for the use of thc clicn( indicated above and shall not be reproduced except in full without the written approval of HBC Engineering. Inc.
o IT.M Page 4 of 6
CONCRETE COMPRESSIVE STRENGTH TEST
8901 Carpenter Frwy. Suite #100
~ Texas 75247
Date of Service: 03/08/1999 Report No.: 9906983 Report Date
05/04/1999
Client No.: 08644025 Project No.: 43-2333-98
Client: The Beck Group Project: GTE Shared Services
Attn: Gillett Berger Coppell Road & Corporate Drive
1700 Pacific Ave., Suite 3800
Dallas TX 75201-4619 Coppel l, Texas
Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast
compressive strength samples.
PROJECT DATA
Co~rrRACTOR: BECK CONCRETE CLASS: 8208
CONCRETE SUPPLIER: TXI PLACEMENT DATE: 03/08/1999 BATCH TIME: 5:50am
PLANT: 31 TIME SAMPLED: 6:55am BY: Mike Odom
SPECIFICATION REQUIREMENTS WEATHER CONDfflONS: Cloudy, Dry
STRENGTlt: 5000 psi @ 28 Days TEMPERATURE (F). AIR 54 F CONCRETE: 68 F
SLUMP: 6" Max TRUCK NO: 722 TICKET NO: 1258758
AIR: N/A AIR CONTENT (%): N/A UNIT WEIGIIT (pct,: N/A
TEST ME, lDO: ASTM C- 143 PLACEMENT LOCATION:
Same as Set I
ASTM C-172
ASTM C-39
SAMPLE LOCATION: F.5 at 16
REPORT OF TESTS ACCUMULATIVE YARDS: 500
CYLINDER MEASURED MAXI3, IUM COMPRESSIVE
I~L~RKED SLUMP DATE AGE LOAD STRENGTH FRACTURE
SET NO. (inchez) TESTED (days) (lbs. force) (psi) TYPE
3 I 5.25 03/10/1999 2 119740 4230
3 2 5.25 03/15/1999 7 153450 5430
3 3 5.25 03/15/1999 7 147280 5210
Average 5320
3 4 5.25 04/05/1999 28 190120 6720
3 5 5.25 04/05/1999 28 189450 6700
Average 6710
3 6 5.25 05/03/1999 56 2023 l0 7150
This report is exclusively for the use of the client indicated above add shall not be reproduced except in tull without the written approval of HBC Engineering, Inc.
oi'I'M Page 5 of 6
CONCRETE COMPRESSIVE STRENGTH TEST
8901 Carpenter Fray., Suite #100
Dann,% Ta~s 75247
Date of Service: 03/08/1999 Report No.: 9906983 Report Date
O5/O411999
Client No.: 08644025 Project No.: 43-2333-98
Client: The Beck Group Project: GTE Shared Services
Attn: Gillett Berger Coppell Road & Corporate Drive
1700 Pacific Ave., Suite 3800
Dallas TX 75201-4619 Coppell, Texas
Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast
compressive strength samples.
PROJECT DATA
cot, mo. croR: BECK co~cRETE ct,Ass: 8208
CONCRETE SUPPLIER: TXI PLACEMENT DATE: 03/08/1999 BATCHTIME: 6:45am
PL~t~rr: 31 TIME SAMPLED: 7:55am BY: Mike Odom
SPECWlCATION aZQtaREM~ Wv. ATm~R co~omoNs: Cloudy
STm~NGTH: 5000 psi @ 28 Days TEMPZRATURE (P}- AIR 54 F CONCRETE: 70 F
SLUMP: 6" Max TRUCK NO: 648 TICKET NO: 1258774
nI~: N/A AIR COn'T~h"r (%): N/A uNrr wv. mtrr (p~0:. N/A
~ M~rnoo: ASTM C- 143 PLACV-t~mtwr LOCnTION:
Same as Set I
ASTM C- 172
ASTM C-39
SAMPLE LOCATION: G.5 at 17
REPORT OF TESTS ACCUMULATIVE YARDS: 400
CYLINDER MEASURED MAXIMUM COMPRESSIVE
MARKED SLUMP DATE AGE LOAD STRENGTH FRAC'I~RE
SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE
4 ! 5.50 03/10/1999 2 104770 3700
4 2 5.50 03/15/1999 7 141460 5000
4 3 5.50 03/15/1999 7 ! 39950 4950
Average 4980
4 4 5.50 04/05/1999 28 189450 6700
4 5 5.50 04/05/1999 28 183750 6500
Average 6600
4 6 5.50 05/03/1999 56 1978 l0 7000
Technician: Mike Odom Started: 2:00am Finished: 10:00am I--l~ E ngine,,,.~,~[',~ .~
Report Distribution:
(I) Thc Beck Group f, I ) Thc Beck Group
( I ) Gromatzky Dupree & Assoc. ( I ) Dalcan, Inc. Eugene Harbour
(I) Brockettc Davis Drake, Inc. (I) HBC Engineering/Eugene Harbour Vice President
( l ) Thc Beck Group
This report is exclusively for thc usc of thc client indicated above and shall not bc rcproduccd except in full without thc written approval of HBC Enginccrin§, Inc.
OlTM Page 6 of 6