Loading...
Villages C P1-LR 860620Concrete Cylinder Test Report Report Date 06/20/86 Sample Date 05/23/86 Standard 6"x 12" Area 28.27 Square inches To R.S. Ross Concrete, Inc. Project Villages of Coppell, Phase I - Coppell, Texas Contractor R. S. Ross Concrete, Inc. Concrete Supplier and Ptant Western Ready Mix Concrete, Inc., Plant #1 M~xNo. 5 Location of Placement Pav_c~ent, Ashford Dr., 5 ' south of station 1+70 Materials Sou,ce, SSD Batch Wts. Description (Lbs./Cu./Yd.) Other Data Cement Time Batched: 6: 43 a.m· Fly Ash Time Sampled: 7 Coarse Aggregate Ticket No.: 13~90 Intermediate Aggregate Temperature: Ambient 73° Concrete 08° Fine Aggregate Weather Conditions: Over'cast with south wind Admixtures: 1. 2. Added Water 0 ~.].1013.S Entrained Air Content 3.0 % Specimen Age Slump Total Load Compressive Strength Strength Required Number (Days) Date Tested In. Lbs. P.S.I. P.S. L/days VOC 94 7 05/30/86 3 84300 2982 3000/28 95 28 06/20/86 114600 4054 96 28 06/20/86 115000 4068 Curing ASTM C-31 Test Method Fracture: Regular (UNO) Cylinbers Made By: ASTM C-39 C~ Remarks and/or Distribution TS/p 411254 R. S. Ross Concrete, Inc. -Randy Ross Dimension Brooks - Mark Kurtz Nathan D. Maier Consulting Engineers, Inc. - Janet Vick City of Coppell - Ed Powell Maxim Enqineers, Inc. Reviewed by: /~. Concrete Cylinder Test Report Report Date 06/20/86 Sample Date 05/23/86 Standard 6"x 12" Area 28.27 Square inches To R.S. Ross Concrete, Inc. Project Villages of Coppell, Phase I - Coppell, Texas Contractor R. S. Ross Concrete, Inc. Concrete Supplier and Plant Western Ready Mix Concrete, Inc., Plant #1 Mix No. 35 Location of Placement A1].~:~¢ E, station 6+00 Materials Sou,ce/ SSD Batch Wts. Desc,,p,,on Other Data Cement Time Batched: 10: 56 a.m. Fly Ash Time Sampled: 11:10 a.m. Coarse Aggregate Ticket No.: 523 Intermediate Aggregate Temperature: Ambient 76° Concrete 70° Fine Aggregate Weather Conditions: Partly cloudy with south wind Admixtures: 1. 2. Added Water Entrained Air Content % 0 Gallons 2.0 Specimen Age Slump Total Load Compressive Strength Strength Required Number (Days) Date Tested In. Lbs. P.S.I. P.SJ,/ciays VOC 97 7 05/30/86 3 127000 4492 3600/28 98 28 06/20/86 152000 5377 99 28 06/20/86 155000 5483 Curing ASTM C-31 Test Method Fracture: Regular (UNO) Cylinders Made By: ASTM C-39 ~ Remarks and/or Distribution TS/p 411254 R. S. Ross Concrete, Inc. - Randy Ross Dimension Brooks - Mark Kurtz Nathan D. Maier Consulting Engineers, Inc. - Janet Vick GL, m, Inc. - gandy ~eming City of Coppell - Ed Powell - Maxim Enqineers, Inc. Reviewed by: ~ Concrete Cylinder Test Report Repo. Date 06/20/86 Sample Date 05/23/86 Standard 8"x ~Z' Area 28.27 Square inches To ~. S. RDss Concrete, Inc. Project Villages of Coppell, Phase I - Coppell, Texas Contractor R.S. Ross Concrete, Inc. Concrete Supplier and Plant Western Ready Mb{: Concrete, Inc., Plant #1 MixNo. 35 Location of Placement Alley D-1 ~ station 2-Jo00 Materials Source/ SSD Batch Wts. Description (Lbs./Cu./Yd. OtherData Cement Time Batched: 1: 34 a.m. Fly Ash Time Sampled: 2: 45 a.m. Coarse Aggregate Ticket No.: Intermediate Aggregate Temperature: Ambient Concrete 84° 72° Fine Aggregate Weather Conditions: Admixtures: Partly cloudy with south wind 1. 2. Added Water Entrained Air Content 0 Gallons 3.0 Specimen Age Slump Total Load Compressive Strength Strength Required Number (Days) Date Tested In. Lbs. P.S.I. P.S.I./days VOC 100 7 05/30/86 1 1/2 110700 3916 3600/28 101 28 06/20/86 148200 5242 102 28 06/20/86 150300 5317 Curing ASTM C-31 Test Method Fracture: Regular (UNO) Cylinders Made By: ASTM C-39 i C3 Remarks and/or Distribution TS/p 411254 R. S. RDss Concrete, Inc. - Randy Ross Dimension Brooks - Mark Kurtz Nathan D. Maier Consulting Engineers, Inc. - Janet Vick City of Coppell - Ed Powell Maxim Enqineers, Inc. Reviewed by: /~