Loading...
Verizon-LR 990426CONCRETE COMPRESSIVE STRENGTH TEST 8901 Carpenter Frwy., Suite Dallas, Texas 75247 Date of Service: 02/26/1999 Report No.: 9906172 Report Date 04/26/1999 Client No.: 08644025 Project No.: 43-2333-98 Client: The Beck Group Project: GTE Shared Services Attn: Gillett Berger Coppell Road & Corporate Drive 1700 Pacific Ave., Suite 3800 Dallas TX 75201-4619 Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. PROJECT DATA CONTRACTOR: BECK CONCRETE CLASS: 8208 CONCRETE SUPPLIER: TXI PLACEMF~Cr DATE: 02/26/1999 BATCll TIME: 2:59am PLANT: 41 TriFlE SAMPLED: 3:25am SV: Mike Odom SPECIFICATION REQUIREMENTS WEATHER CONDFHONS: Partly cloudy STRENGTII: 5000 psi @ 28 Days TEMPERATURE (v). AIR 66 V CONCRETE: 74 F SLt~IP: 6.0" Max TRUCK NO: 458 TICKET NO: 1251129 AIR: N/A AIR CONTENT (%}: N/A UNIT WEIGHT (pcf): N/A TEST METHOD: ASTM C- 143 PLACEMENT LOCATION: Building slab. Level II! Area C, E-H. 13-18 ASTM C- 172 Note: Ten (10) gallons of water added. ASTM C-39 SAMPLE LOCATION: E.5 @ 13.5 REPORT OF TESTS ACCUblULATIVE YARDS: 550 CYLINDER blEASURED MAXIblUM COMPRESSIVE MARKED SLUblP DATE AGE LOAD STRENGTtl FRACTURE SET NO. (inch.) TESTED (days) (lbs. force) (psi) TYPE I I 6.00 03/01/1999 3 109950 3890 I 2 6.00 03/05/1999 7 144360 5110 I 3 6.00 03/05/1999 7 141350 5000 Average 5060 I 4 6.00 03/26/1999 28 184710 6530 I 5 6.00 03/26/1999 28 178940 6330 Average 6430 I 6 6.00 04/23/1999 56 193270 6840 This report is cxclusivel? for thc usc of the client indicalcd alx~vc and shall not bc reproduced except in full without the written approval of HBC Engineering, Inc. OILI. I'age ! of $ CONCRETE COMPRESSIVE STRENGTH TEST 8901 Carpenter Fr~ Suite #100 Dallas, Texas 75247 Date of Service: 02/2~/1999 Report No.: 990~172 Report Date 04/2611999 Client No.: 08644025 Project No.: 43-2333-98 Client: The Beck Group Project: GTE Shared Services Attn: Gillett Bcrger Coppell Road & Corporate Drive 1700 Pacific Ave., Suite 3800 Dallas TX 75201-4619 Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. PROJECT DATA co~rrRnC'TOR: BECK COnC~rE CLASS: 8208 CONCRETE SUPPLIER: TXI PLACEMENT DATE: 02~26/1999 BATCH TIME: 4: 10am Pt,ANT: 41 TIME SAMPLED: 4:35am BY: Mike Odom SPECIFICATION REQUIREMENTS WEATHER conorrions: Parity cloudy STRENGTH: 5000 psi @ 28 Days TEMPERATURE (I:)-AIR 66 F CONCRETE: 74 F SLUMP: 6.0" Max TRUCK NO: 805 TICKET NO: 1251173 AIR: N]A AIR CONTENT (%): N/A UNIT WEIGHT (pcD: N/A TEST METHOD: ASTM C- 143 PLACEMENT LOCATION: See page I ASTM C- 172 Note: Ten ( I 0) gallons of water added. ASTM C-39 SAMPLE LOCATION: Along E @ 15 REPORT OF TESTS ACCUI KILATIVE YARDS: 550 CYLINDER MEASURED blAXIMUM COMPRESSIVE MARKED SLUMP DATE AGE LOAD STRENGTtl FRACTURE SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE 2 I 5.75 03/01/1999 3 110540 3910 2 2 5.75 03/05/1999 7 153390 5420 2 3 5.75 03/05/1999 7 153880 5440 Average 5430 2 4 5.75 03/26/1999 28 ! 85900 6570 2 5 5.75 03/26/1999 28 187050 6620 Average 6600 2 6 5.75 04/23/1999 56 198020 7000 This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of H BC Engineering. Inc. {)ILL Page 2 of 5 CONCRETE COMPRESSIVE STRENGTH TEST 8901 Carpenter Frwy., Suite #I00 Dallas, Texas 75247 Date of Service: 02/26/1999 Report No.: 9906172 Report Date 04/26/1999 Client No.: 08644025 Project No.: 43-2333-98 Client: The Beck Group Project: GTE Shared Services Attn: Gillett Berger Coppell Road & Corporate Drive 1700 Pacific Ave., Suite 3800 Dallas TX 75201-4619 Coppeli, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. PROJECT DATA CONTRACTOR: BECK CONCRETE CLASS: 8208 CONCRETE SUPPLIER: TXI PLACEMENT OAT~: 02/26/1999 BATCtI TIME: 5:35am PLANT: 41 TIME SAMPLED: 6:00am BY: Mike Odom SPECIFICATION REQUIREMENTS WEATHER co~romoNs: Cloudy STRENGTII: 5000 psi @ 28 Days TVMPE~rORE (I~-AIR 66 F CONCRETV-: 73 F SLUMP: 6.0" Max TRUCK NO: 455 TICKET NO: 1251253 AIR: N/A AIR CONTENT (~): N/A UNIT WEIGiiT (pcf): N/A TEST METIIOD: ASTM C-143 PLACEMENT LOCATION: See page I ASTM C- 172 Note: Fifteen (15) gallons of water added. ASTM C-39 SAMPLE LOCATION: F @ 15.5 REPORT OF TESTS ACCUMULATIVE YARDS: 550 CYLINDER MEASURED I~LS, XI~IUM COMPRESSIVE MARKED SLUMP DATE AGE LOAD STRENGTI! FRACTURE SET NO. (inche~) TESTED (days) (lb~. force) (psi) TYPE 3 I 5.50 03/01 / 1999 3 113450 4010 3 2 5.50 03/05/1999 7 154950 5480 3 3 5.50 03/05/1999 7 163920 5800 Average 5640 3 4 5.50 03/26/1999 28 180450 6380 3 5 5.50 03/26/1999 28 172720 6110 Average 6250 3 6 5.50 04/23/1999 56 188940 6680 This report is exclusively for thc usc of thc clicn! indicated above and shall no! be reproduced except in full without thc written approval of HBC Engineering. htc. 011.I. Page 3 of 5 CONCRETE COMPRESSIVE STRENGTH TEST 8901 Carpenter Frwy., Suite #100 Dallas, Texas 7S247 Date of Service: 02/26/1999 Report No.: 9906172 Report Date 04/26/1999 Client No.: 08644025 Project No,: 43-2333-98 Client: The Beck Group Project: GTE Shared Services Attn: Gillett Berger 1700 Pacific Ave., Suite 3800 Coppell Road & Corporate Drive Dallas TX 75201-4619 Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. PROJECT DATA CoNTRAcrroR: BECK CONCRETE CLASS: 8208 CONCRETE SUPPLIER: TXI PLACF~lENT DATE: 02/26/1999 BATCH TIME: 7:02am PLANT: 41 TIME SAMPLED: 7:25am BY: Mike Odom SPECIFICATION RKQUIREMENTS WEATIIER CONDITIONS: Cloudy STRENGTII: 5000 psi @ 28 Days TEMPERATURE (F) - AIR 66 F CONCRETE: 74 F SLUMP: 6.0" Max TRUCK NO: 455 TICKET NO: 1251424 AIR: N/A AIR CONTENT (%): N/A UNIT WEIGHT (pcb: N/A TF_3T MgTHOD: ASTM C- 143 PLACEMENT LOCATION: See page I ASTM C-172 Note: Five (5) gallons of water added. ASTM C-39 SAMPLE LOCATION: G @ 17 REPORT OF TESTS ACCUMULATIVE YARDS: 550 CYLINDER MEASURED blAXD, IUM COMPRESSIVE MARKED SLUMP DATE AGE LOAD STRENGTH FRACTURE SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE 4 I 6.00 03/01/1999 3 106670 3770 4 2 6.00 03/05/1999 7 149520 5290 4 3 6.00 03/05/1999 7 1413 ! 0 5000 Average 5150 4 4 6.00 03/26/1999 28 198810 7030 4 5 6.00 03/26/! 999 28 204670 7240 Average 7140 4 6 6.00 04/23/1999 56 211670 7490 This report is exclusively for the usc of the client indicated above and shall not be reproduced except in full without the written approval of H BC Engineering, Inc. OII.L Page 4 of 5 CONCRETE COMPRESSIVE STRENGTH TEST 8901 Carpenter Fray., Suite #I00 I)all~, Texas 75247 Date of Service: 02/26/1999 Report No.: 9906172 Report Date 04/26/1999 Client No.: 08644025 Project No.: 43-2333-98 Client: The Beck Group Project: GTE Shared Services Attn: Gillett Berger Coppell Road & Corporate Drive 1700 Pacific Ave., Suite 3800 Dallas TX 75201-4619 Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. PROJECT DATA CO.reaCTOR: BECK CONCRETE CLASS: 8208 CONCRETE SUPPLIER: TXI PLACEMEWr DATE: 02/26/1999 BATCH T~ME: 8:30am PLANT: 41 TIME SAMPLED: 9:00am BY: Mike Odom SPECIFICATION REQUIREMENTS WEATI-~R CONDITIONS: Cloudy STR~GTH: 5000 psi @ 28 Days TEMPERATURE (F). AIR 69 v CONCRETE: 73 F SLtnVIP: 6.0" Max TRUCK NO: 472 TICKET NO: 1251631 AIR: N/A AIR CONTENT (%): N/A UNIT WEIGHT (pc0: N/A TEST MmnlOD: ASTM C- 143 PLACEMENT LOCATION: ASTM C- 172 see page I · ASTM C-39 SAMPLE LOCATION: G.5 @ 17.5 REPORT OF TESTS ACCUMULATIVE YARDS: 560 CYLINDER MEASURED blAXIMUM COMPRESSIVE blARKED SLUMP DATE AGE LOAD STRENGTH FRACTURE SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE 5 I 5.00 03/01/1999 3 104460 3690 5 2 5.00 03/05/1999 7 145960 5160 5 3 5.00 03/05/1999 7 140850 4980 Average 5070 5 4 5.00 03/26/1999 28 176240 6230 6 5 5.00 03/26/1999 28 185160 6550 Average 6390 6 6 5.00 04/23/1999 56 193220 6830 Technician: Mike Odom Started: 2:00am Finished: 10:00am ~ _ ~,"L. Engin~~, g, Inc. Report Distribution: ( I ) Th~ Beck Group ( I ) Thc Beck Group ( I ) Gromatzky Dupree & Assoc. ( I ) Dalcan. Inc. Eugen ( I ) Brockette Davis Drake. Inc. ( l ) HBC Engineerin~Eugcne Harbour Vice President ( I ) The Beck Group This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering. Inc. Page 5 of 5