Loading...
Verizon-LR 990421CONCRETE COMPRESSIVE STRENGTH TESI' 8901 Carpenter Frwy., Suite #100 Dallas, Texas 7S247 Date of Service: 02/22/1999 Report No.: 9905743 Report Date 04/21/1999 Client No.: 08644025 Project No.: 43-2333-98 Client: The Beck Group Project: GTE Shared Services At!n: Gillett Berger Coppell Road & Corporate Drive 1700 Pacific Ave., Suite 3800 Dallas TX 75201-4619 Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field tes~ and cast compressive strength samples. PROJECT DATA CONTRACTOR: BECK CONCRETE CLASS: 8208 CONCRETE SUPPLIER: TXI PLACEMENT OAT~: 02/22/1999 aATCff TIME: t:48pm PLANT: 4! TIME SAblPLED: 2:20pm aY: Mike Odom SPECIFICATION REQUIREMENTS WEATHER Co~DrrIONS: Partly cloudy STRENGTH: 5000 psi @ 28 Days TEMPERATURE (F). AIR 62 F CONCRETE: 72 F SLUMP: 6.0" Max TRUCK NO: 804 TICKET NO: 1247099 AIR: N/A AIR CONTENT (%): N/A uNrr WEIGIIT (pc0.'. N/A TEST METHOD: ASTM C-143 PLACEMENT LOCATION: Dock/patio screen wall, Area A. Level I north end placement ASTM C-172 ASTM C-39 SAMPLE LOCATION: Center area third lift REPORT OF TESTS ACCUMULATIVE YAm~S: 27 CYLINDER MEASURED MAX~IUM COMPRESSIVE MARKED SLUMP DATE AGE LOAD STRENGTH FRACTURE SET NO. (inche~) TESTED (days) (lbs. force) (psi) TYPE I I 5.75 03/01/1999 7 157350 5560 I 2 5.75 03/01/1999 7 168260 5950 Average 5760 I 3 5.75 03/22/1999 28 200490 7090 I 4 5.75 03/22/1999 28 21 ! ! 70 7470 Average 7280 I 5 5.75 0411911999 56 215400 7620 Technician: Mike Odom Started: 10:00am Finished: 3:30pm ~ Engine~~nc. Report Distribution: (1) The Beck Group ( I ) Thc Beck Group (I) Gromatzky Dupree & Assoc. (I) Dalcan. Inc. Eugene Harbour {I) Brockettc Davis Drake. Inc. (I) HBC Engineering/Eugene Harbour Vice President (I) The Beck Group This report is exclusively for the usc oflhe client indicated above and shall not bc reproduced except in full without the written approval of HBC Engineering, Inc. I)11.1. Page I t)f I