Loading...
Verizon-LR 990420CONCRETE COMPRESSIVE STRENGTH TEST' 8901 Ctrpenter FFWy., Suite #100 Dslbi$, Te3m$ 7S247 Date of Service: 02/19/1999 Report No.: 9905560 Report Date 04/20/1999 Client No.: 08644025 Project No.: 43-2333-98 Client: The Beck Group Project: GTE Shared Services Attn: Gillett Berger Coppell Road & Corporate Drive 1700 Pacific Ave., Suite 3800 Dallas TX 75201-4619 Coppell, Texa~ Services: Obtain samples of fresh concrete at the placement locations, perform required field test' and cast compressive strength samples. PROJECT DATA CONTRACTOR: BECK CONCRETE CLASS: 8208 CONCRETE SUPPLIER: TXI PLACEMENT OAT~: 02/19/1999 BATCH TrME: 12:24pm PLA~rr: 41 TrME SAMPLED: h20pm BY: Mike Odom SPECIFICATION REQUIREMENTS WEATHER CONDITIONS: Fair STRENGTH: 5000 psi @ 28 Days TEMPERATURE (~-AIR 63 v CONCRETE: 76 sLtnvm: 6" Max TRUCK NO: 805 TICK~-'r NO: 12457555 Am: N/A AIR CONTEWr ('~): N/A UNIT WEIGHT (per): N/A TEST METiIOD: ASTM C- 143 PLACEMENT LOCATION: See note below ASTM C- 172 ASTM C-39 SAMPLE LOCATION: R5-9.7 REPORT OF TESTS ACCUMULATIVE YARDS: 50 CYLINDER blEASURED MAXIMUM COMPRESSfVE bIARKED SLUMP DATE AGE LOAD STRENGTtl FRACTURE SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE I I 6.00 02/26/1999 7 103860 3670 I 2 6.00 02/26/1999 7 96400 3410 Average 3540 I 3 6.00 03/19/1999 28 143540 5080 I 4 6.00 03/19/1999 28 148350 5250 Average 5170 I 5 6.00 04/16/1999 56 160270 5670 NOTE: Roof Columns, Area B, RC-R1, RE-Ri, RA-R1, R5-9.7; Columns, Level 2 to 3, Area A, lines 14, 15, 16, 17, & 18 through Lines E,F,G,H. Technician: Mike Odom Started: 12:00pm Finkshed: 5:30pm H~ Engi Relmrt l)istribution: I I ) Thc I}cck Group ( I ) Thc Beck Group ( I ) Gronlatzky Duprcc & Assoc. (I) Dalcan, Inc. Eugene Harbour (I) IJrockett~: Davis Drake. Inc. (I) H IIC Enginecring/Eu§cnc Harbour Vice President ( I ) Thc Beck Group This report is exclusively for the usc ol'lhe client indicated above and shall no! be reproduced except in full without the written approval of HBC Engineering. oITM Page ! of I CONCRETE COMPRESSIVE STRENGTH TEST 8901 Carpent~ Frwy., Suite #100 Dallas, Texas 75247 Date of Service: 03/19/1999 Report No.: 9908127 Report Date 04/20/1999 Client No.: 08644025 Project No.: 43-2333-98 Client: The Beck Group Project: GTE Shared Services Attn: Gillett Berger Coppell Road & Corporate Drive 1700 Pacific Ave., Suite 3800 . Dallas TX 75201-4619 Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. PROJECT DATA CONTRACTOR: BECK CONCR~r~ Ct~SS: 9508 CONCRETE SUPPLIER: TXI PLACEMEWr OATE: 03/19/1999 BATCH TIME: 10:09am Pt~,wr: 41 TIME SAMPLED: 10:45am BY: Mike Odom SPECIFICATION REQUIREMENTS WEATHER co~rorrloNs: Cloudy s'r~.NGTH: 4000 psi @ 28 Days TEMPERATURE(~-AIR 56 V CONCRETE: 69 SLUMP: 6.0" max T~UC~:NO: 389 TICKler NO: 126577 AIR: N/A AIR COt~rrgNT (%): N/A uNrr WEIGHT (pc~ N/A TEST Mg'mOO: ASTM C-143 PLACEMENT LOCATION: Level I, Ama ~ dock ramp walls ASTM C-172 ASTM C-39 SAMPLE LOCATION: North wall, second lift REPORT OF TESTS ACCUMULATIVE YARDS: 20 'CYLINDER MEASURED MAXIMUM COMPRESSIVE MARKED SLUMP DATE AGE LOAD STRENGTI'! FRACI~RE SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE 1 I 5.00 03/26/1999 7 120770 4270 I 2 5.00 03/26/1999 7 128620 4550 Average 4410 I 3 5.00 04/! 6/1999 28 185270 6550 I 4 5.00 04/16/1999 28 182050 6440 Average 6500 I 5 5.00 05/14/1999 56 Ten (10) gallons of water added. Technician: Mike Odom Started: 9:00am Finished: l l:30am ~ Eng--. Report Distribution: ~ -. ( I ) Thc Beck Group ( I ) The Beck Group ( I ) Gromatzky Duprce & Assoc. ( I ) Dalcan, Inc. Eugene Harbour (I) Brockettc Davis Drake, Inc. (I) HBC Engineering/Eugene Harbour Vice President (I) The Beck Group This repor~ is exclusively for the use of thc clienl indicalcd above and shall not bc reproduced except in full will]out the wriucn approval of HBC Engineering, Inc. III1,1. Page I of I