Loading...
Verizon-LR 990416CONCRETE COMPREo IVE STRENGTH TES, 8901 Carpenter Fr~., Suite #I00 Dallas, Texas ?S247 Date of Service: 03/17/1999 Report No.: 9907914 Report Date 04/16/1999 Client No.: 086~.~025 Project No.: 43-2333-98 Client: The Beck Group Project: GTE Shared Services Attn: Gillett Berger Coppell Road & Corporate Drive 1700 Pacific Ave., Suite 3800 Dallas TX 75201-4619 Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. PROJECT DATA CONT]O, CTOR: BECK CONCB~rE CLASS: 8273 CONCRETE SUPPLIER: TXI PLACEMENT DATEi 0311711999 BATCIt TnVIE: 1:15pm Iq.ANT: 4 i TIME SAMPLED: 2:00pm BY: Mike adam SPECIFICATION REQUIREMENTS WEATHERCONOrrioNs: Cloudy STRENGTli: 3500 psi @ 28 Days TEMPERATURE (r)- AIR 74 F CONCRETE: 76 r SLUMP: 6.0" Max TRUCK NO: 472 TICKET NO: !264982 AIR: 3-6% AIR CO~ (%): 4. ! UNIT WEIGHT (pti'}: N/A TEST METIIOD: ASTM C- 143 PLACC~n~_2~'r LOCATION: Level 1. Area A dock slab-on-grade ASTM C- 172 ASTM C-39 Twenty (20} gallons of water added SAMPLE LOCATION: See below REPORT OF TESTS ACCUMULATIVE YARDS: 160 CYLINDER MEASURED NIAXIMUM COMPRESSIVE MARKED SLUMP DATE AGE LOAD STRENGTIi FRAC173RE SET NO. (inches} TF~TEi) (days} (lbs. force) (psi) TYPE I I 4.25 03/24/1999 7 77430 2740 I 2 4.25 03/24/1999 7 814 I0 2880 Average 2810 I 3 4.25 04/14/1999 28 124340 4400 I 4 4.25 04/14/1999 28 122120 4320 Average 4360 I 5 4.25 05/1~1999 56 Sample location: Upper (inside) dock slab @ cenEerpoin~ area. Tc~hnici'-,n: Mike Odom Started: ~:OOp,n I ) Thc llcck (;roup ( I ! Thc Ilcck ~r~..atzk.v Duprcc & As~x.'. ( I ~ IkH¢;m. I.¢ Etl~Ofl~ H~rbour ) ( I ! Thc II¢ck This rCl)~rt in cxclusivch' h, thc llnc ,,1' thc thrill imhc;itcd al~vc :llid ~,11;1ll Ilar bc rcl)r~luccd cxccpI iii full without thc wi'ht¢ll al)l)iOv:d of tllJ(? EllglllC¢l'iilg. lite. I111.1. I':lgc I of I CONCRETE COMPRESoIVE STRENGTH TES' 8901 Carpenter Frw~., Suite #100 Dallas, Texas 75247 Date of Service: 03/17/1999 Report No.: 9907915 Report Date 04/16/1999 Client No.: 08644025 Project No.: 43-2333-98 Client: The Beck Group Project: GTE Shared Services Attn: Giilett Berger Coppell Road & Corporate Drive 1700 Pacific Ave., Suite 3800 Dallas TX 752014619 Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. PROJECT DATA CONTRACTOR: BECK CONCRm'E CLASS: 8208 CONCRL~FESUPPLIER: TXI PLACEMENT DATE: 03/17/1999 BATCIITIME: 3:13pm PLANT: 41 TIME SAMPLED: 3:50pm aY: Mike Odom SPECIFICATION REQUIREMENTS WEATHER CONDITIONS: Cloudy STRENGTll: 5000 psi @ 28 Days TEMPERATURE (F) - AIR 72 r CONCRETE: 76 SLUMP: 6.0" Max TRUC~C NO: 802 TICKET NO: 1265234 AIR: N/A AIR coN'r~t~r (%): N/A UNIT WEIGItT (pcf): N/A TEST METIIOD: ASTM C- 143 PLACEMENT LOCATION: Level V roof columns Area C, between Lines E-H & 14-18 ASTM C-172 ASTM C-39 SAMPLE LOCATION: E ~ 16 REPORT OF TESTS ACCUMULATIVE YARDS: 47 CYLINDER MEASURED MAXIMUM COMPRESSIVE MARKED SLUMP DATE AGE LOAD STRENGTH FRACTURE SET NO. (inch~s) TESTED (days) (lbs. force) (psi) TYPE I I 5.50 03/24/1999 7 151960 5370 I 2 5.50 03/24/1999 7 149260 5280 Average 5330 I 3 5.50 04/14/1999 28 220680 7800 I 4 5.50 04/14/1999 28 226160 8000 Average 7900 I 5 5.50 05/12/1999 56 Technician: Mike Odom Started: '>:{){)pill Finished: 5:30pm m~ r, ll~ Rel)ort Distril)ution: ot~ ~' ( I ) TIK Beck Group ( I ) Thc Beck (;mup ( I ) (;romalzky Duprcc & Asst.. ( I ) I)alcan. Inc. Eu.~ Harbour ~ I1 Ilrt~kcttc Davis I)rakc. Inc. (11 liB(' Ih~gmccrmg/l~ugcnc Ilarlxmr Vice President i l ) '['hc Ileck (';roup This repel1 is exclusively for the use of Ibc client imhcalcd ,iho~.¢ ami shall not bc rcpr(Muccd except m full ~ ilhou! thc wrlllen alqm)val of HB(' Engineering, Inc. 011.1. I'age I of I