Loading...
Verizon-LR 990414CONCRF. TE COMPRESSIVE STRENGTH TES'r ENGINEERII~, INC. 89~1 Carpenter Frwy., Suit~ #1~0 Dallas, Te:ma 75247 Date of Service: 03/16/1999 Report No.: 9907797 Report Date 04/14/1999 Client No.: 08644025 Project No.: 43-2333-98 Client: The Beck Group Project: GTE Shared Services Attn: Gillett Berger Coppell Road & Corporate Drive 1700 Pacific Ave., Suite 3800 Dallas TX 75201-4619 Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. PROJECT DATA co~rrRAc'roR: BECK CONCRETE Ct~SS: 8208 CONCRETE SUPPLIER: TXI PLACEMENT DATE: 03/16/1999 BATCH TnV~: 2:51am PLANT: 41 TIME SAMPLED: 3:30am BY: Mike Odom SPECIFICATION REQUIRE;MEN'rS WEATHER COmmONS: Fair STREN(;T~: 5000 psi @ 28 Days TEMPERATURe- (F) - AIR 48 F CONCRETE: 60 F SLUM~: 6.0" Max TRUCKNO: 461 TICKET NO: 1262303 AIR: N/A Am CONTENT (%): N/A vNrr WEia~r (pc0.: N/A T~_~T ~mTHOD: ASTM C- 143 PLAC~VlZ~T LOCATION: Building slab, Area C Level V ASTM C- 172 ASTM C-39 SAMPLE LOCATION: E.5 @ 13.5 REPORT OF TESTS ACCt - LAT,VE YAWS: 500 CYLINDER MEASURED MAXIblUM COMPRESSIVE MARKED SLUMP DATE AGE LOAD STRENGTH FRACTURE SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE 1 I 6.00 03/18/1999 2 66810 2360 I 2 6.00 03/23/1999 7 131450 4650 I 3 6.00 03/23/1999 7 121840 4310 Average 4480 I 4 6.00 04/13/1999 28 199280 7050 I 5 6.00 04/13/1999 28 198450 7020 Average 7040 I 6 6.00 '05/11/1999 56 This repo~ is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering. Inc. 0ILL Page I of 7 Report No.: 9907797 Five (5) ~allons of water added. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. 0ILL Page 2 of 7 CONCRETE COMPRESSIVE STRENGTH TESrl' ENGINEERING, INC. 8901 Carpenter Frwy., Suite #100 Dallas, Texas 7S247 Date of Service: 03116/1999 Report No.: 9907797 Report Date 0411411999 Client No.: 08644025 Project No.: 43-2333-98 Client: The Beck Group Project: GTE Shared Services Attn: Gillett Ber§er Coppell Road & Corporate Drive 1700 Pacific Ave., Suite 3800 Dallas TX 75201-4619 Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. PROJECT DATA CONTEACTOR: BECK CONCRETE CLASS: 8208 CONCRETE SUPPLIER: TXI PLACEMENT DATE: 03/16/1999 BATCH TIME: 4:14am PLANT: 41 TIME SAMPLED: 4:40am BY: Mike Odom SPECIFICATION REQUIREMENTS WEATI~R CONDITIONS: Fair STRENGTH: 5000 psi @ 28 Days TEMPEEATURE (~3- AIR 47 F CONCRET£: 61 F SLUMP: 6.0" Max TRUCK NO: 641 TICKET NO: 1262368 AXR: N/A AIR COt~tTENT (,~): 1.4 uNrr WEIGHT (pcf); N/A TEST METHOD: ASTM C- 143 PLACEMENT LOCATION: See page I ASTM C- 172 ASTM C-39 SAMPLE LOCATION: F @ 15 REPORT OF TESTS ACC LA VE YARDS: 500 CYLINDER MEASURED MAXIMUM COMPRESSIVE MARKED SLUMP DATE AGE LOAD STRENGTH FRACTURE SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE 2 1 5.75 0311811999 2 72970 2580 2 2 5.75 03/23/1999 7 133620 4730 2 3 5.75 03/23/1999 7 127210 4500 Average 4620 2 4 5.75 04/13/1999 28 204790 7240 2 5 5.75 04/13/1999 28 208650 7380 Average 7310 2 6 5.75 05/11/1999 56 This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. 0ILL Page 3 of 7 Report No.: 9907797 Ten (10) gallons of water added. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. OILL Page 4 of 7 CONCRETE COMPRESSIVE STRENGTH TES I 8~01 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Date of Service: 03/16/1999 Report No.: 9907797 Report Date 04/14/1999 Client No.: 08644025 Project No.: 43-2333-98 Client: The Beck Group Project: GTE Shared Services Attn: Gillett Berger Coppell Road & Corporate Drive 1700 Pacific Ave., Suite 3800 Dallas TX 75201-4619 Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. PROJECT DATA COt~nO, CTOR: BECK CONCRk-n~ CLASS: 8208 CONCRETE SUPPLIER: TXI PLACEMENT DATE: 03/16/1999 BATCH Tra~: 5:44am PLnbrr: 41 TIME SAMPLED: 6:25am BY: Mike Odom SPECIFICATION REQUIREMENTS WEATItERCONDrrIoNS: Fair Sa~.~NGTH: 5000 psi @ 28 Days T~M~V. EATUm~ (~3- AIR 46 F CONCRETV.: 62 l~ SL~P: 6.0" Max TRUCK NO: 641 TIcKer NO: 1262475 AI~ N/A Am cowr~t~r ¢~): N/A uNrr w~iG~rr (pm.'. N/A X~ZT M~mOD: ASTM C- 143 PLACgZ, mto~ LOCATION: See page ! ^STM C-172 ASTM C-39 SAMPLE LOCATION: G @ 16 REPORT OF TESTS ACCUMm W-YARDS: 500 CYLINDER MEASURED MAXIMUM COMPRESSIVE MARKED SLUMP DATE AGE LOAD STRENGTH FRACTURE SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE 3 I 6.00 03/18/1999 2 87520 3090 3 2 6.00 03/23/1999 7 144670 5120 3 3 6.00 03/23/1999 7 147280 5210 Average 5170 3 4 6.00 04/13/1999 28 206590 7310 3 5 6.00 04/13/1999 28 204390 7230 Average 7270 3 6 6.00 05/11/1999 56 This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering. Inc. OILL Page S of 7 CONCRETE COMPRE ,SIVE STRENGTH TESx' 8901 Carpent~' Frwy., Suite #100 Dallas, Texas 75247 Report Date Date of Service: 03/16/1999 Report No.: 9907797 04/14/1999 Client No.: 08644025 Project No.: 43-2333-98 Client: The Beck Group Project: GTE Shared Services Attn: Gillett Berger Coppell Road & Corporate Drive 1700 Pacific Ave., Suite 3800 Dallas TX 75201-4619 Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. PROJECT DATA CONTRACTOR: BECK CONCaETE CLASS: 8208 CONCRETE SUPPLIER: TXI PLACEMENT DAT~: 03/16/1999 BATCH TIME: 7:17am PLnNT: 4 ! TIME SAMPLED: 8:00am BY: Mike Odom SPECIFICATION REQUIREMENTS WEATHER CONOmONS: Fair STRENGTH: 5000 psi @ 28 Days TEMPERATURE {F} - AIR 51 F CONCRETE: 63 V SLUM~: 6.0" Max TRUCK ~O: 643 Ticr,~-'r NO: 1262664 AIR: N/A AIR COt~'rENT (%): N/A UNIT WEIGHT (pcf): N/A ~ MET~IOO: ASTM C- 143 PLACEMENT LOCATION: See page I ASTM C- 172 ASTM C-39 SAMPLE LOCATION: G.5 @ 17 REPORT OF TESTS ACCUMULATIVE YARDS: 500 CYLINDER MEASURED MAXIMUM COMPRESSIVE MARKED SLUMP DATE AGE LOAD STRENGTH FRACTURE SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE 4 I 5.75 03/18/1999 2 76480 2700 4 2 5.75 03/23/1999 7 122060 4320 4 3 5.75 03/23~ 1999 7 113080 4000 Average 4160 4 4 5.75 04/13/1999 28 185900 6570 4 5 5.75 04/13/1999 28 171310 6060 Average 6320 4 6 5.75 05/11/1999 56 This repor~ is exclusively for the use of the client indicawd above and shall not be reproduced except in full without the written approval of HBC Engineering. Inc. 0ILL Page 6 of 7 CONCRETE COMPRESSIVE STRENGTH TES'x- 8901 Carpenter Frwy., Suite #100 Dallm, Texas 75247 Date of Service: 03/16/1999 Report No.: 9907797 Report Date 04/14/1999 Client No,: 08644025 Project No,: 43-2333-98 Client: The Beck Group Project: GTE Shared Services Attn: Gillett Berger Coppell Road & Corporate Drive 1700 Pacific Ave., Suite 3800 Dallas TX 75201-4619 Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. PROJECT DATA CONXr, ACTOR: BECK CONCRE~ Ct.~SS: 8208 CONCRETE SUPPLIER: TXI PLACEMENTDAXZ: 03/16/1999 BATCH TIME: 8:22am PLANT: 41 TIME SAMPLED: 9:05am BY: Mike Odom SPECIFICATION REQUIRE~F_,NTS WE, ATI~R Cot~mONS: Partly cloudy STRENO'm: 5000 psi @ 28 Days TEMPERATORg fi)- Am 54 V CONCRETE: 64 F SLUMP: 6.0" Max TaUC£ NO: 461 TICKET NO: 1262791 AIR: N/A Am co~brr (~,): N/A UNIT WEIGHT (per).: N/A TEST ME'mOU: ASTM C- 143 PLnC~t~rr LOCATION: See page 1 ASTM C-172 ASTM C-39 SAMPLE LOCATION: F @ 17.5 REPORT OF TESTS ACCU347JLATIVE YARDS: 500 CVL roEa MRASURED MAX COMPRESSlV MARKED SLUMP DATE AGE LOAD STRENGTH FRACTURE SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE 5 I 6.00 03/18/1999 2 68340 2420 5 2 6.00 03/23/1999 7 138950 4910 5 3 6.00 03/23/1999 7 142480 5040 Average 4980 5 4 6.00 04/13/1999 28 193610 6850 5 5 6.00 04/13/1999 28 190530 6740 Average 6800 5 6 6.00 05/11/1999 56 Technician: Mike Odom Started: 2:00am Finished: 10:30am H~ En~~~''~-- Report Distribution: (1) The Beck Group ( I ) The Beck Group ( I ) Gromatzky Dupree & Assoc. ( i ) Dalcan, Inc. Eugene Harbour (1) Brockette Davis Drake, Inc. (I) H BC Engineering/Eugene Harbour Vice President ( I ) Ti~ Beck Group This report is exclusively for thc use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. 0iLL Page 7 of 7 CONCRETE COMPRESSIVE STRENGTH TEKI 8901 Carl)mm' Fnvy. Suite #100 Dallas, Texas 75247 Report Date Date of Service: 02/15/1999 Report No.: 9905054 04/14/1999 Client No.: 08044025 Project No.: 43-2333-98 Client: The Beck Group Project: GTE Shared Services Attn: Gillett Berger Coppell Road & Corporate Drive 1700 Pacific Ave., Suite 3800 Dallas TX 75201-4619 Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. PROJECT DATA CO~n~,C'XOR: BECK CONCm~ CLASS: 8208 CONCRETE SUPPLIER: TXI I't,ACEMV..wr OAT~: 02/15/1999 EATCtt TaYto: 2:37pm Pt,nwr: 4 ! TIME SAMPLED: 3:05pm BY: Mike Odom SPECn~CAT~ON REOv0nu~vty.2q'rs V,~.~Ttma Cot~moNs: Partly Cloudy STRE~Gx~: 5000 psi @ 28 Days X~vn'ERATUt~ (~3- Am 68 F CONCREX~: 76 F SLUM~: 6" Max xauc~ NO: 454 xxcg~r NO: 1240569 Am~ N/A Am CONX~wr (%): N/A crNrr W~X~;nT (pc~:. N/A ~ M~'nioo: ASTM C- 143 PLAC~Vt~ LOCA~ON: Roof columns (4) Area B RA-R.3, J.i-9.2, R4.7-9.7, R4.3-9.7 ASTM C-172 ASTM C-39 SAMPLE LOCATION: J.1-9.2 REPORT OF TESTS ACC LA VE YARDS: 5.50 CYLINDER MEASURED MAXIblUM COMPRESSIVE MARKED SLUMP DATE AGE LOAD STRENGTH FRACTURE SET NO. (inches) T~TED (days) (lbs. force) (psi) TYPE I 1 5.50 02/22/1999 7 163530 5780 I 2 5.50 02/22/1999 7 173860 6150 Average 5970 1 3 5.50 03/15/1999 28 197890 7000 I 4 5.50 03/15/1999 28 210550 7450 Average 7230 I 5 5.50 04/12/1999 56 219630 7770 Ten gallons of water added. ~ Technician: Mike Odom Started: 2:00pm Finished: 4:00pm H~ En ' Report Distribution: (!) The Beck Group (1) The Beck Group (I) Gromatzky Dupre~ a Assoc. (i) Dalcan, inc. Eugene Harbour (I) Brockette Davis Drake, Inc. (I) HBC Engineering/Eugene Harbour Vice President (I) The Beck Groop This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. 01TM Page 1 of I CONCRETE COMPRESSIVE STRENGTH TES% 8901 Carpenter Frwy. Suite #100 ....... Dallas, Texas 752A7 Date of Service: 02/16/1999 Report No.: 9905190 Report Date 04/14/1999 Client No.: 08644025 Project No.: 43-2333-98 Client: The Beck Group Project: GTE Shared Services Attn: Gillett Berger Coppell Road & Corporate Drive 1700 Pacific Ave., Suite 3800 · Dallas TX 75201-4619 Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. PROJECT DATA CONTRACrOR: BECK CONC~'r~ CLASS: 8208 CONCRETE SUPPLIER: TXI PLACEMENT DATE: 02/16/1999 BATCHTIME: ll:24am PLnwr: 41 TIME SAMPLED: 12:00pm sY: Mike Odom SPECIFICATION REQUIREMENTS WEATI~R CON~rrIons: Fair STRENGTH: 5000 psi @ 28 Days TEMPERATURE(t~-Am 66 r CONCRETV.: 75 r SLUMP: 6.0" Max TaUC~C NO: 807 TICK~-'r NO: 1241557 AIR: N/A Am cowr~rr (%): N/A unrr WEIGHT (pc0: N/A TEST METtIOD: ASTM C-143 PLACEMENT LOCATION: (5) Roof colunms, Area B ~ R-2.9 ~ 9.7. R2.9 ~ 9,4. J @ 9.8, RA ~ R2, RS @ RE and ASTM C- 172 roof elev. slab ASTM C-39 SAMPLE LOCATION: See below REPORT OF TESTS ACCV LATn'E YARDS: 580 cvu eu msvReo co Re, ssrve MARKED SLUMP DATE AGE LOAD STRENGTH FRACTURE SET NO. (inches) ~D (days) (11~ force) (pM) TYPE I I 6.00 02/2311999 7 147520 5220 I 2 6.00 02/23/1999 7 136820 4840 Average 5030 1 3 6.00 03/16/1999 28 173650 6140 I 4 6.00 03/1611999 28 183750 6500 Average 6320 1 5 6.00 0411311999 56 196470 6950 Sample location: R2.9 ~ 9.4, (25) approx, yards placed on top Technician time: See Report #9905191 Five (5) Gallons of water added ReportTechnician:Distribution:Mike Odom Started: Finished: ~ Enginee~~. (!) The Beck Group (I) The Beck Group (I) Gromatzky Dupree & Assoc. (I) Dalcan, Inc. Eugene'Harbour (I) Brockette Davis Drake, Inc. (I) HBC Engineering/Eugene Harbour Vice President (I) The Beck Groap This report is exclusively for the u~ of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, lac. 0ILL Page I of I CONCRETE COMPRESSIVE STRENGTH TESq_ 8901 Carpente~ Frwy., Suite #100 DalLus, Terns 7~247 Date of Service: 02/16/1999 Report No.: 9905191 Report Date 04/14/1999 Client No.: 08644025 Project No.: 43-2333-98 Client: The Beck Group Project: GTE Shared Services Attn: Gillett Berger Coppell Road & Corporate Drive 1700 Pacific Ave., Suite 3800 Dallas TX 75201-4619 Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. PROJECT DATA COtO'~,c'roR: BECK CONCRE'r~ CLASS: 8208 CONCRETE SUPPLIER:. TXI vLAc~avtg2rr DATE: 02/16/1999 BATCH TIME: 9:39am PLAto': 41 TIME SAMPLED: 10:05am BY: Mike Odom SPECIFICATION REQUIREMENTS WEATHERCOtVOmONS: Fair s'r~aTtt: 5000 psi @ 28 Days ~M~v-ax'rtn~ O')-AIR 62 F CONCRETE: 74 SLt~P: 6.0" Max TRUCKNO: 715 TlCKETNO: 1241394 AIR: N/A AIR COtrt~nT ('~): N/A uNrr w~iaxrr (~0:. N/A TEST METltOD: ASTM C- 143 PLAC~t, rr LOCATION: Dock/patio Level I, 20' screen wall area A, building ! ASTM C- 172 ASTM C-39 SAMPLE LOCATION: First lift, south end REPORT OF TESTS ACCUMULATIVE YARDS: n0 CYLINDER MEASURED MAXrbiUM COMPRESSIVE MARKED SLUMP DATE AGE LOAD STRENGTH FRACTURE SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE I I 5.50 02/2311999 7 155280 5490 I 2 5.50 02/23/1999 7 160570 5680 Average 5590 I 3 5.50 03/16/1999 28 200790 7100 I 4 5.50 03/16/1999 28 206370 7300 Average 7200 I 5 5.50 04/13/1999 56 223660 7910 ReportTechnician:Distribution:Mike Odom Started: 9:00am Finished: 3:00pm ~ En~Inc. ( I ) Thc Beck Group (I) The Beck Group ( I ) Gromatzky Dupree & Assoc. (1) Dalcan, Inc. Eugene Harbour (I) Brockette Davis Drake, Inc. (I) H BC Engineering/Eugene Harbour Vice President (I) The Beck Group This report is exclusively for thc use of the client indicated above and shall not be reproduced except in full without thc written approval of HBC Engineering, inc. 0ILL Page 1 of I CONCRETE COMPRESSIVE STRENGTH TES'i 8901 Carpente~ Frwy., Suite #100 ~ Texas 7~247 Date of Service: 02/16/1999 Report No.: 9905145 Report Date 04/14/1999 Client No.: 08644025 Project No.: 43-2333-98 Client: The Beck Group Project: GTE Shared Services Attn: Gillett Berger Coppell Road & Corporate Drive 1700 Pacific Ave., Suite 3800 Dallas TX 75201-4619 Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. PROJECT DATA CO~CTOR: BECK CONCRETE CLASS: 8208 CONCR~I'E SUPPLIER: TXI PLACEMENT DATE: 02/16/1999 RATC~ TIME: 3: 18pm PLANT: 41 TIME SAMPLED: 3:45pm BY: Mike Odom SPECIFICATION REQUIREMENTS WEATHER com)rrlons: Fair STRENGTH: 5000 psi @ 28 Days TEMPERATURE (F) - AIR 62 r CONCRETE: 73 r SLUMe: 6.0" Max TRUCK NO: 805 Ticr~r NO: 1248759 AIR: N/A AIR Co,trENT (,~): N/A uNrr W~IGHT (p~).~ N/A TEST METIIOD: ASTM C- 143 PLACEMENT LOCATION: Building slab, level II Area C between 13-18, E-H ASTM C-172 ASTM C-39 SAMPLE LOCATION: 17.5 @ F REPORT OF TESTS ACCt tULaT VE YAm S: 510 CYLINDER MEASURED MAXlblUM COMPRESSIVE MARKED SLUMP DATE AGE LOAD STRENGTH FRACTURE SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE I 1 5.50 02/18/1999 2 1 04360 3690 I 2 5.50 02/23/1999 7 135970 4810 I 3 5.50 02/2311999 7 145870 5160 Average 4990 I 4 5.50 03/16/1999 28 219510 7760 I 5 5.50 03/16/1999 28 220210 7790 Average 7780 I 6 5.50 04/13/1999 56 231580 8190 This report is exclusively for ~he use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering. Inc. 0ILL Page 1 of 8 Rel~.rt No.: 9905145 Twenty five (25) Gallons of water added. This report is exclusively for me use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering. Inc. OILL Page 2 of 8 CONCRETE COMPRESSIVE STRENGTH TEST 8901 Carpenter Frwy., Suite #100 Dail~, T~ms 75247 Date of Service: 02/16/1999 Report No.: 9905145 Report Date 04/14/1999 Client No.: 08644025 Project No.: 43-2333-98 Client: The Beck Group Project: GTE Shared Services ARm Gillett Berger Coppell Road & Corporate Drive 1700 Pacific Ave., Suite 3800 Dallas TX 75201-4619 Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. PROJECT DATA CO~a, CTOR: BECK CONCRETE CLASS: 8208 CONCRETE SUPPLIER: TXI PLACEMENT DATE: 02/16/1999 BATCHTIME: 4:31am PLANT: 41 TIME SAMPLED: 4:55am BY: Mike Odom SPECIFICATION REQUIREMENTS WEATHER CONDITIONS: Fair STRENGTH: 5000 psi @ 28 Days TEMPERATURE (g). AIR 59 r CONCRETE: 71 r SLUMP: 6.0" Max TRUCKNO: 716 TICKETNO: 1240831 AIR: N/A AIR co~rr~NT (~): N/A vNrr WEIGHT (pcf): N/A T~T M~IOO: ASTM Co ! 43 PLACEMENT LOCATION: See page 1 ASTM C- 172 ASTM C-39 SAMPLE LOCATION: Along E.5 @ 16.5 REPORT OF TESTS ACCUMULATIVE YARDS: 510 CYL 'a ER M ASUg D COMP SSlW- MARKED SLUMP DATE AGE LOAD STRENGTH FRACTURE SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE 2 I 6.00 02/1811999 2 85900 3040 2 2 6.00 02/23/1999 7 162400 5740 2 3 6.00 02/23/1999 7 147850 5230 Average 5490 2 4 6.00 03/16/1999 28 187320 6620 2 5 6.00 03116/1999 28 188800 6680 Average 6650 2 6 6.00 04/13/1999 56 202570 7160 This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. OILL Page 3 of 8 CONCRETE COMPRESSIVE STRENGTH TES'I 8901 Carpenter Frw~., Suite #100 Dallas, Texas 75247 Date of Service: 02/16/1999 Report No.: 9905145 Report Date 04/14/1999 Client No.: 08644025 Project No.: 43-2333-98 Client: The Beck Group Project: GTE Shared Services Attn: Gillett Berger Coppell Road & Corporate Drive 1700 Pacific Ave., Suite 3800 Dallas TX 75201-4619 Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. PROJECT DATA cotcrRAcxoa: BECK CONCRETE CLASS: 8208 CONCRETE SUPPLIER: TXI PLACEMENT DATE: 02/16/1999 BATCH TIME: 5:49am ~.ANT: 41 TIME SAMPLED: 6:10am BY: Mike Odom SPECIFICATION REQUIREMENTS WEATHER CONDITIONS: Partly cloudy STRENGTH: 5000 psi @ 28 Days TEMPERATURE (F} - AIR 58 F CONCRETE: 71 S~.UM~: 6.0" Max TaUCKNO: 802 TIC~CE'r NO: 12440916 AIR: N/A Am CONTENT (~): N/A uNrr WEIGHT (p~.~ N/A TEST METHOD: ASTM C- 143 PLACEMENT LOCATION: See page 1 ASTM C-172 ASTM C-39 SAMPLE LOCATION: Along (3.5 @ 15.5 REPORT OF TESTS ACCUMULATIVE YARDS: 5 l0 CYLINDER MEASURED MAXlblUM COMPRESSIVE MARKED SLUMP DATE AGE LOAD STRENGTtl FRACTURE SET NO. (inclms) TESTED (days) (lin. force) (psi) TYPE 3 1 5.75 02/18/1999 2 106440 3760 3 2 5.75 02/23/1999 7 165390 5850 3 3 5.75 02/23/1999 7 158310 5600 Average 5730 3 4 5.75 03/16/1999 28 228560 8080 3 5 5.75 03/16/1999 28 239400 8470 Average 8280 3 6 5.75 04/13/1999 56 249640 8830 This repot't is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. 0ILL Page 4 of 8 Report No.: 9905145 Ten (10) gallons of water added. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. OILL Page 5 of 8 CONCRETE COMPRESSIVE STRENGTH TES' . 8901 Carpenter Frwy., Suite #100 DalLes, Tp.r~_* 7S247 Date of Service: 02/16/1999 Report No.: 9905145 Report Date 04/14/1999 Client No.: 08644025 Project No.: 43-2333-98 Client: The Beck Group Project: GTE Shared Services Attn: Gillett Berger Coppell Road & Corporate Drive 1700 Pacific Ave., Suite 3800 Dallas TX 752014619 Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. PROJECT DATA co~rrRACTOR: BECK CONCRETE CLASS: 8208 CONCRETE SUPPLIER: TXI ~'LACF_.M~ DATE: 02/1611999 BATCH TIME: 6:139am Pt, at, r: 41 TIME SAMPLED: 7:05am BY: Mike Odom SPECIFICATION REQUIREMENTS W~ATHER CONDmO~S: Partly cloudy ST~NGTH: 5000 psi @ 28 Days TEMPERATURE (F). AIR 59 g CONCRETE: 73 g SLUMP: 6.0" Max TRUCKNO: 802 TICKETNO: 1241005 AIR: N/A AIR CONTEbrr (~): N/A uNrr w~lo~rr (pc0: N/A TEST METIIOD: ASTM C-143 PLACEMENT LOCATION: See page I ASTM C-172 ASTM C-39 SAMPLE LOCATION: Along G.5 @ 14 REPORT OF TESTS AccUM ^TIW- YA S: 510 CYLINDER MEASURED MAXiblUM COMPRESSIVE MARKED SLUMP DATE AGE LOAD STRENGTH FRACTURE SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE 4 I 5.75 02/18/1999 2 100980 3570 4 2 5.75 02/23/1999 7 165030 5840 4 3 5.75 02/2311999 7 148980 5270 Average 5560 4 4 5.75 03/16/1999 28 210960 7460 4 5 5.75 03/1611999 28 208910 7390 Average 7430 4 6 5.75 04/13/1999 56 223550 7910 This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. 0ILL Page 6 of 8 RePort No.: 9905145 Ten (10) gallons of water added. This report is exclusively for the usc of thc client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. 0iLl. Page 7 of 8 CONCRETE COMPRESSIVE STRENGTH TES', 8901 Carpento- Frwy., Suit~ #100 Dallas, Texas 75247 Date of Service: 02/16/1999 Report No.: 9905145 Report Date 04/14/1999 Client No.: 08644025 Project No.: 43-2333-98 Client: The Beck Group Project: GTE Shared Services Attn: Gillett Berger Coppell Road & Corporate Drive 1700 Pacific Ave., Suite 3800 Dallas TX 75201-4619 Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. PROJECT DATA COnTanCTOR: BECK CONC~ Ct~,SS: 8208 CONCRETE SUPPLIER: TXI P~CEM~rr DATE: 0~16/1999 BATCH T~E: 7:28am P~: 4t T~ESA~LED: 8:05am BY: Mike Odom SPZCWlCA~ON ~UI~ W~RCO~mONS: Fair s~G~: 5~ psi ~ 28 Days ~z~ ~ - AIR 59 V CONC~TE: 74 V SL~: 6.0" Max ~UCKNO: 802 T~C~ NO: 1241117 Am: N/A Am CO~ (~): N/A u~ ~tG~ (~ N/A T~ M~OD: AS~ C-143 ~c~z~ ~AT~ON: S~ pa~e I AS~ C- 172 Ten ~ll~s of wa,~ a~. ASTM C-39 SAMPLE LOCATION: Along ~.5 ~ 13.5 PORT OF TESTS ACC CAX,VZ VA : CO S,VZ ~D SL~P DA~ AGE LOAD ST~NG~ F~~ 8~ NO. (Mc~) ~D (da~) (1~. force) (~i) ~PE 5 1 6.~ 0~1~19~ 2 112960 3990 5 2 6.~ 0~23/1999 7 173340 6130 5 3 6.~ 0~3/1~9 7 185160 6550 Avenge 6340 5 4 6.~ 03/1~1999 28 221140 7820 5 5 6.~ 03/16/1999 28 218~ 7730 Avenge 7780 5 6 6.~ ~/13/1999 56 234~0 8280 T~hni~an: Mike ~om S~: 2:~am H~h~: 9:~am ~ En~ Re~ D~tfibution: (I) ~ ~k Grip (I) ~ Beck Group (I) Gro~ky ~p~ & As~. (l) Dal~n, Inc. Eug~H~ Harbour (I) Br~ket~ Davis Drake, Inc. (I) HBC Engineedn~Eugene Hater Vice ~esident ( I ) ~ B~k G~p ~ia ~p~ is exclusively for ~e use of~e client indicated a~ve ~d shall n~ ~ repr~uced ex.pt in full without ~e wfiuen approval of HBC Engin~fing, Inc, 0ILL Page 8 of 8