Loading...
Verizon-LR 990413CONCRETE COMPRESSIVE STRENGTH TES i 8901 Carpenter Frwy~ Suite #100 Dallas, Texas 75247 Date of Service: 03/09/1999 Report No.: 9907123 Report Date 04/13/1999 Client No.: 08644025 Project No.: 43-2333-98 Client: The Beck Group Project: GTE Shared Services Attn: Gillett Berger Coppell Road & Corporate Drive 1700 Pacific Ave., Suite 3800 Dallas TX 75201-4619 Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. PROJECT DATA CONTRAC'rOR: BECK coNcagrg ct~ss: 8208 CONCRETE SUPPLmR: TXI PLACV. M~rr DATE: 03/09/1999 aATCH TIM~: 12:27pm PLANT: 4 ! . TIME SAMPLED: l:05pm aX,: Mike Odom SPECIFICATION REQUIREMENTS WF. ATI~RCOt~mmoNs: Fair STRE~;'m: 5000 psi @ 28 Days TEMPERATURE (F} - AIR 62 F CONCRETE: 67 SLt~M~': 6.0" Max ~tJCKNO: 459 Ticr~'r No: 1259513 AIR: N/A Am CONTENT (~): 1.2 unrr W'I~IGHT (p~: N/A TEST SlE~iOO: ASTM C-143 PLaCeMENT LOCATION: (20) Columns Area C Level V, E-H, 14-18 ASTM C- 172 ASTM C-39 SAMPLE LOCATION: E-18 & F-IS REPORT OF TESTS ACCUMULATIVE YARD : CYLINDER MEASURED MAXIMUM COMPRF,~IVE MARKED SLUMP DATE AGE LOAD STRENGTH FRACTURE SET NO. (inci~s) TESTED (days) (lbs. force) (psi) TYPE I I 5.75 03/16/1999 7 118640 4200 I 2 5.75 03/16/1999 7 17.3070 4350 Average 4280 I 3 5.75 04/06/1999 28 146920 5200 I 4 5.75 04/06/1999 28 152030 5380 Average 5290 I 5 5.75 05/04/1999 56 Ten (10} gel. lores of water added. Technician: Mike Odom Started: h00pm Finished: 4:00pm H~ Report Distribution: (I) The Beck Group (I) The Beck Group (I) Gromatzky Dupree & Assoc. (I) Dalcan. Inc. Eugene Harbour (I) Brockette Davis Drake. Inc. (I) H BC Engineering/Eugene Harbour Vice President ( I ) The Beck Group This repo~ is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. 0ILL Page 1 of I CONCRETE COMPRESSIVE STRENGTH TEST 89~1 Cm'wnt~ Frw~., Suit~ #10O Dallm, Texas 75247 Date of Service: 02/12/1999 Report No.: 9904867 Report Date 04/13/1999 Client No.: 08644025 Project No.: 43-2333-98 Client: The Beck Group Project: GTE Shared Services Attn: Giilett Berger Coppell Road & Corporate Drive 1700 Pacific Ave., Suite 3800 Dallas TX 75201-4619 Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. PROJECT DATA CO~.aCTO~: BECK coNc~ET~ class: 8208 CONCRETE SU~I'LmR: TXI Pr~,c~rr DATE: 02/12/1999 BATCH Tn~: l:34pm Pl~l~rr: 41 TIME SAMPLED: 2:15pm BY: Mike Odom SPECIFICATION REQUIREMENTS WEATHER cobromoNs: Fair STmmaT~: 5000 psi @ 28 Days TEMP~-RATORE (V). AIR 61 SLO'M~: 6.0" Max TRUCK~O: 806 TICKZ'r ~O: 1239092 An~ N/A AIR CONTF. NT (~): N/A uNrr W~IOHT (~t):. N/A TEST METHOD: ASTM C- 143 ~'LACE~.20' LOCATION: Roof- pentbosue sum wall & (4) roof l~nthosue columns R$-9.2, RA-RS. R4.7-9.4m, ASTM C- 172 R4.3-9.4, ASTM C-39 SAMPLE LOCATION: Stcmwall along Line RB REPORT OF TESTS ACCU rOrsxr,, -YARDS: 16 CYLINDER MEASURED MAXIMUM COMPRESSIVE MARKED SLUMP DATE AGE LOAD STRENGTH FRACTIJRE SET NO. (inches) TESTED (days) (lbs. for~e) (psi) TYPE I I 5.25 02/19/1999 7 102340 3620 I 2 5.25 02/19/1999 7 106840 3780 Average 3700 I 3 5.25 03/12/1999 28 153640 5430 I 4 5.25 03/12/1999 28 159080 5630 Average 5530 I 5 5.25 04/0911999 56 168940 5970 F£ve (5) gal. lons of war:er added. Teehnleian: Mike Odom Started: 2:00pm Finished: 4:00pm Report Distribution: (I) Tbe Beck Group (!) Tbe Beck Group (i) Groma~y Dapme & Assoc. (I) Oatcaa, loc. Eugene Harbour (I) Brocketm Davis Drake, loc. (I) H BC Engineering/Eugene Harboat Vice President (i) Tbe Beck Group This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. 0ILL Page I of I CONCRETE COMPRESSIVE STRENGTH TESq- ENGINEERING. INC. 8901 Carpenter Frwy., Suite #100 ~ Texas 7~247 Report Date Date of Service: 02/10/1999 Report No.: 9904621 04/13/1999 Client No.: 08644025 Project No.: 43-2333-98 Client: The B~k Group Project: GTE Shared Services A~tn: Gill~u Berber Coppell Road & Corporate Driwe 1700 ?a¢ifi¢ Awe., Suit~ 3800 Coppell, Texas Dallas TX 75201-4619 Services: Obtain samples og fresh concrete a~ the placemem locations, p~rform required field ~es~ and cas~ ¢ompr~s~i¥~ ~rength samples. PROJECT DATA co~rrRACTOR: BECK CONCRETE CLASS: 8208 CONCRETE SUPPLIER: TXI PLACk~,lF. err DATE: 02/1011999 BATCH TIME: 2:40am PLANT: 3 ! TIME SAMPLED: 3:30am BY: Mike Odom SPECIFICATION REQUIREMENTS WEATIi~R cotforrioNs: Cloudy STREN(;Tm 5000 psi @ 28 Days TEMPERATURE(F)-AIR 58 g CONCRETE: 79 g SLUMP: 6.0" Max TRUCK NO: 484 T~CKET NO: 1235838 AiR: N/A Am COtO'ENT (~): N/A tr~rr WEIGHT (pcB: N/A TEST METIIOD: ASTM C- ! 43 PLAC~ENT LOCATION: Roof slab Area B 5.7.13 ASTM C- I72 Note: Five (5) gallons of water added. ASTM C-39 SAMPLE LOCATION: Beam along Line 6 @ C Line REPORT OF TESTS ACCUMULATIVE YARDS: 550 C~,~ER M~suREo ~xe~ COMPRESSlV~- MARKED SLUMP DATE AGE LOAD STRENGTH FRACTURE SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE I I 5.25 02/12/1999 2 98460 3480 I 2 5.25 02/17/1999 7 146580 5180 I 3 5.25 02/1711999 7 130320 4610 Average 4900 I 4 5.25 03110/1999 28 177160 6270 I 5 5.25 03/10/1999 28 179230 6340 Average 6310 ! 6 5.25 0410711999 56 193740 6850 This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. 0ILL Page I of 5 CONCRETE COMPRESSIVE STRENGTH TES'i 8901 Carpenter Frwy., Suite #100 ~ T~x~s 75247 Report Date Date of Service: 02/10/1999 Report No.: 9904621 04/13/1999 Client No.: 0864402~ .Project No.: 43-2333-98 Client: The Beck Group Project: OTE Shared Services Attn: Gillett Berger Coppell Road & Corporate Drive 1700 Pacific Ave., Suite 3800 Dallas TX 75201-4619 Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. PROJECT DATA Co~rrRACTOR: BECK CONCP. ETE CLASS: 8208 CONCRErE SUPPLIER: TXI PLACEM~¢r DATE: 02/10/1999 BATCH TIME: 4: 17am VL~rr: 31 TIME SAMPLED: 5:00am BY: Mike Odom SPV. X~WlCATION REQUmEM~NTS w~R cot~moNs: Cloudy S'm~2qGTH: 5000 psi @ 28 Days TEMPEgAXmU~ O~ - AIR 60 SLC~tP: 6.0" Max TaUCK~qO: 541 TiCg~'r NO: 1235918 Am: N/A Am cotvrw.~rr (,~): N/A u~rrr w~iowr (pc0: N/A TF, ST MWrHOD: AST~[ C- 143 pt.AC~-lXtEzfr LOCATION: See page I ASTM C-172 Note: Fifteen (15) gallons of water added. ASTM C-39 SAMPLE LOCATION: Along Line N @ 9.3 REPORT OF TESTS ACCUMULATIVE YARDS: 550 CYLINDER MEASURED MAXIMUM COMPRESSIVE MARKED SLUMP DATE AGE LOAD STRENGTH FRACTURE SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE 2 I 5.75 02/12/1999 2 116000 4100 2 2 5.75 02/1711999 7 156020 5520 2 3 5.75 02/1711999 7 152650 5400 Average 5460 2 4 5.75 03/10/1999 28 199670 7060 2 5 5.75 03/10/1999 28 204670 7240 Average 7150 2 6 5.75 04/07/1999 56 216880 7670 This repcax is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. OILL Page 2 of 5 CONCRETE COMPRESSIVE STRENGTH TEST 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Date of Service: 02/10/1999 Report No.: 9904621 Report Date 04/13/1999 Client No,: 08644025 Project No.: 43-2333-98 Client: The Beck Group Project: GTE Shared Services Attn: Gillett Berger Coppell Road & Corporate Drive 1700 Pacific Ave., Suite 3800 Dallas TX 75201-4619 Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. PROJECT DATA CONTRACTOR: BECK CONCRETE CLASS: 8208 CONCRETE SUPPLIER: TXI PLACEMENT OATE: 02/10/1999 hATCH TIME: 4:17am PLANT: 31 TIME SAMPLED: 6:15am nY: Mike Odom SPECIFICATION REQUIREMENT~ WEATHER CO~OmO~'s: Cloudy s~?.~;'m: 5000psi @ 28 Days TEM~ERA~ at).Alg 62 r CONCRE'r~: 77 r SLtrt~: 6.0" Max TgUCX~NO: 738 TICt~"r NO: 1236006 AIR: N/A AIR CONTENT (~): N/A Unit wEIG~rr (peag:. N/A TEST METiIOD: ASTM C-143 PLACEMENT LO4~ATION: See page I ASTM C- 172 note: Ten { I 0) gallons of water added. ASTM C-39 SAMPLE LOCATION: Along C.5-D @ 7 REPORT OF TESTS ACCUMULATIVE YARDS: 550 CYLINDER MEASURED MAXIMUM COMPRESSIVE MARKED SLUMP DATE AGE LOAD STRENGTH FRACTURE SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE 3 1 5.50 02/12/1999 2 112550 3980 3 2 5.50 02/17/1999 7 156680 5540 3 3 5.50 02/17/1999 7 143320 5070 Average 5310 3 4 5.50 03/10/1999 28 173750 6140 3 5 5.50 03/10/1999 28 167000 5910 Average 6030 3 6 5.50 04/07/1999 56 189460 6700 This report is exclusively for the use of the'client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. 01LL Page 3 of 5 CONCRETE COMPREbSIVE STRENGTH TES'I 8901 Carpenter grwy., Suite #100 Dallas, Texas 75247 Report Date Date of Service: 02/1011999 Report No.: 9904621 04/13/1999 Client No.: 08644025 Project No.: 43-2333-98 Client: The Beck Group Project: GTE Shared Services Attn: Gillett Berger Coppell Road & Corporate Drive 1700 Pacific Ave., Suite 3800 Dallas TX 75201-4619 Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. PROJECT DATA cot,rr~,croR: BECK CONCm~T~ CLASS: 8208 CONCRETE SUPPLIER: TXI PLAC~Z~rT OATZ: 02/10/1999 SATCH T~: 6:56am P~: 31 Tree SAILED: 8:~am BY: Mike Odom SPECfflCA~ON ~UI~M~ ~R co~mo~s: Pauly cloudy ~Na~: 5~psi O 28Days ~~{~-Am ~ r CONCh: 75 F SL~: 6.~ Max T~C~ NO: 480 XiC~ NO: 1236170 Am: N/A Am CO~ (~): N/A V~ ~ (~0~ N/A ~T M~OD: ASTM C-143 P~C~E~ ~ATION: S~ page ! ASTM C- 172 N~: Ten (I 0) ~11~ of wat~ add~, AS~ C-39 SABLE ~CATION: Along M.5 ~ 9.7 PORT OF TESTS YA S: 550 MUS D ~D SL~P DA~ AGE ~AD S~G~ ~~ S~ NO. (~) T~D (d~ys) (1~ f~ce) (~) TYPE 4 I 5.75 0~1~1999 2 83460 2950 4 2 5.75 0~17/1999 7 120620 4270 4 3 5.75 0~17/l~9 7 l 18740 42~ Avenge 4240 4 4 5.75 03/10/1999 28 180130 6370 4 5 5.75 03/10/1999 28 182620 ~60 Avenge ~20 4 6 5.75 ~/07/t999 56 t987~ 7030 This repo~ is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering. Inc. 0ILL Page 4 of 5 CONCRETE COMPREbSIVE STRENGTH TES i 8901 Carpenter gr~., Suite #100 Dallas, T~as 75247 Report Date Date of Service: 02/1011999 Report No.: 9904621 04/13/1999 Client No.: 08644025 Project No.: 43-2333-98 Client: The Beck Group Project: GTE Shared Services Attn: Gillett Berger Coppell Road & Corporate Drive 1700 Pacific Ave., Suite 3800 Dallas TX 75201-4619 Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. PROJECT DATA CONTaA~R: BECK CONCa~'T~ CLASS: 8208 CONCa~r~ SUPPLIng: TXI PLAC~nV.r~ DAT~: 0~10/1999 BATCH T~: 8:39am P~: 31 T~ SA~O: N/A aY: Mike Odom SPEC~CA~ON ~QUI~b~ ~R CO~lO~: Cloudy S~G~: 5~psi ~ 28Days ~E~(~-Am 70 V COSC~: 75 F SL~: 6.~ M~ TaUC~SO: 428 ~c~ ~o: 123~5 Am: N/A Am co~ (~): N/A u~ ~to~ (~ N/A T~ M~OD: AS~ C-143 ~c~ ~A~OS: ~c paso 1 ASTM C- 172 N~: Ten (I0) ~i1~ of wa~ add~. ASTM C-39 SABLE ~CA~ON: Along 12, Lien E.5-F REPORT OF STS YA : 530 M SV O ~D SL~P DA~ AGE LOAD S~G~ F~~ S~ NO. (~h~) ~ED (days) (!~ fore) (~i) ~PE 5 1 5.50 0~1~1999 2 92~0 3280 5 2 5.50 0~17/1999 7 127750 4520 5 3 5.50 0~17/19~ 7 121840 4310 Average ~20 5 4 5.50 03110/.19~ 28 172710 6110 5 5 5.50 03/10/1999 28 18~0 6390 Avenge 6250 5 6 5.50 ~/07/1999 56 1954~ 69 I0 Technician: Mike Odom Started: 2:00am Finished: 12:00pm ~ Engln~ru~. Report Distribution: (I) The Beck Group (I) The Beck Group (1) Gromatzky Dup~ee & Assoc. (I) Dalcan, Inc. Eugene Harbour (I) Brockeue Davis Drake, Inc. (1) H BC Engineering/Eugene Harbour Vice President (I) The Beck Group This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. 0ILL Page 5 of $