Loading...
Verizon-LR 990406CONCRETE "TM COMPREo IVE STRENGTH TES,' 8901 Carpenter Frwy., Suite #I00 Dallas, T~.as 75247 Date of Service: 03/08/1999 Report No.: 9906983 Report Date 04/06/1999 Client No.: 08644025 Project No.: 43-2333-98 Client: The Beck Group Project: GTE Shared Services Attn: Gillett Berger Coppell Road & Corporate Drive 1700 Pacific Ave., Suite 3800 Dallas TX 75201-4619 Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. PROJECT DATA CONTRACTOR: BECK CONCRETE CLASS: 8208 CONCRET~ SUPPLIER: TXI PLACEMENT DATE: 03/08/1999 BATCH TIME: 3:08am PLANT: 31 TIME SAMPLED: 3:55am BY: Mike Odom SPECIFICATION REQUIREMENTS WEATHER cor~rrioNs: Cloudy, drizzle s'rar~o~: 5000 psi @ 28 Days TEMPERATURE (~3- AIR 49 r CONCRETE: 68 F SLUMP: 6" Max TRUCK NO: 479 TICKET NO: 1208732 AIR: N/A AIR Co~rr~NT (~): N/A uNrr WEiatrr (~: N/A ~ MEX~IOD: ASTM C- 143 PLACEMENT LOCATION: Building Slab, Level IV, Area C. line E to H and 13 to 18 ASTM C-172 ASTM C-39 SAMPLE LOCATION: E.I and 13.1 REPORT OF TESTS ACCUMULATIVE YARDS: 500 CYLINDER MEASURED MAXI~MUM COMPRESSIVE MARKED SLUMP DATE AGE LOAD STRF, NGTll FRACTURE S~F NO. (inches) TESTED (days) (lbs. force) (psi) TYPE 1 I 5.25 03/10/1999 2 106190 3760 I 2 5.25 03/15/1999 7 146180 5170 I 3 5.25 03/15/1999 7 156050 5520 Average 5350 I 4 5.25 04/05/1999 28 183760 6500 ! 5 5.25 04/05/1999 28 180350 6380 Average 6440 I 6 5.25 05/03/1999 56 This report is exclusively for the use of thc clicnl indicated above and shall not be reproduced except in full without thc written approval of HBC Engineering, Inc. 01TM Page I of 6 Report No.: 9906983 Ten (10) ~allons of water added. This report is exclusively for thc use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. OITM Page 2 of 6 CONCRETE COMPRESSIVE STRENGTH TEST 8901 Carpenter Fr~., Suite #100 Dallm, Texas 75247 Date of Service: 03/08/1999 Report No.: 9906983 Report Date 04/06/1999 Client No.: 08644025 Project No.: 43-2333-98 Client: The Beck Group Project: GTE Shared Services Attn: Gillett Berger Coppell Road & Corporate Drive 1700 Pacific Ave., Suite 3800 Dallas TX 75201-4619 Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. PROJECT DATA CONTRACTOR: BECK CONCRETE CLASS: 8208 CONCRFrE S~PP~.IER: TXI PLACEMENT DATE: 03/08/1999 RATCt~ Xl~Vgv.: 4:57am Pt,ANT: 31 TIMESAM. PLF. D: 5:45am aY: Mike Odom SPECIFICATION REQUIREMENTS WEATHER CONDmONS: Cloudy, No Drizzle S~U~NaT~: 5000 psi @ 28 Days TEMPERA~JRE(~)- Am 52 F coNcagrg: 68 F SLUMI': 6" Max TRUCK NO: 738 TICXC~'r NO: 1258745 AIR: N/A AIR CONTENT ¢~): N/A uNrr wE~a~rr (pc~; N/A TEST METIIOD: ASTM C-143 PLACEMENT LOCATION: Same as Sct I ASTM C-172 ASTM C-39 SAMPLE LOCATION: E.3 at 15.3 REPORT OF TESTS ACCUM TIVE YA S: 500 CYU OER MRAS REO MAXtMt COM 'RESS VE MARKED SLUMP DATE AGE LOAD STRENGTI[ FRACTURE SE'r NO. (inches) TESTED (days) (lbs. force) (psi) TYPE 2 I 5.50 03/10/1999 2 107120 3790 2 2 5.50 03/15/1999 7 152300 5390 2 3 5.50 03/15/1999 7 158590 5610 Average 5500 2 4 5.50 04/05/1999 28 180350 6380 2 5 5.50 04/0511999 28 179790 6360 Average 6370 2 6 5.50 05/03/1999 56 This report is exclusively for the use of thc client indicated above and shall not be reproduced except in full without thc written approval of HBC Engineering, Inc. 01TM Page 3 of 6 R~Dort No.: 9906983 NOTE: 15 gallons of water added to concrete. This report is exclusively for the use of the client indicated above and shall not I~ reproduced except in full without the written approval of HBC Engineering. Inc. 01TM Page 4 of 6 CONCRETE COMPRESSIVE STRENGTH TEST' 8901 Carpenter Frwy., Suite #100 Dailm, Texas 75247 Date of Service: 03/08/1999 Report No.: 9906983 Report Date 04/06/1999 Client No.: 08~4025 Project No.: 43-2333-98 Client: The Beck Group Project: GTE Shared Services Atto: Gillett Berger Coppell Road & Corporate Drive 1700 Pacific Ave., Suite 3800 Dallas TX 75201-4619 Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. PROJECT DATA CONTRACTOr: BECK CONCreTE CLASS: 8208 CONCR~'FE SUPPLIER: TXI Pt~Cra~a~rr DATE: 03/08/1999 BATCH TUrin: 5:50am PriNT: 31 TIME SAMPLED: 6:55am BY: Mike Odom SPECIFICATION REQUIREbiEN'rs WEATHER com~nnONS: Cloudy, Dry SXBY~GTH: 5000 psi @ 28 Days TEMPERATURE (F). AIR 54 F CONCaXTE: 68 F SLUMP: 6" Max TRUCKNO: 722 TIC~ET NO: 1258758 AIR: N/A AIR CONTENT (~): N/A UNIT WEIGHT (pc0.'. N/A TEST METIIOD: ASTM C- 143 PLACEMENT LOCATION: Same as Set I ASTM C-172 ASTM C-39 SAMPLE LOCATION: F. 5 at 16 REPORT OF TESTS ACCUMULATIVE YARDS: 500 CYLINDER MEASURED MAX~IUM COMPRESSIVE MARKED SLUMP DATE AGE LOAD STRENGTtl FRACTURE SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE 3 I 5.25 03/10/1999 2 119740 4230 3 2 5.25 03/15/1999 7 153450 5430 3 3 5.25 03/! 5/1999 7 147280 5210 Average 5320 3 4 5.25 04/05/1999 28 190120 6720 3 5 5.25 04/05/1999 28 189450 6700 Average 6710 3 6 5.25 05/03/1999 56 This aport is exclusively for the use of the client indicated above and shall nm be reproduced except in full without thc written approval of HBC Engineering, Inc. 01TM Page 5 of 6 ( ONCRETE COMPRESSIVE STRENGTH TEST 8901 Carpenter grwy., Suite #10O Dallas, T~,m 7S7.47 Date of Service: 03/08/1999 Report No.: 9906983 Report Date 04/06/1999 Client No,: 08644025 Project No,: 43-2333-98 Client: The Beck Group Project: GTE Shared Services Attn: Gillett Berger Coppell Road & Corporate Drive 1700 Pacific Ave., Suite 3800 Dallas TX 75201-4619 Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. PROJECT DATA CONTaACTOR: BECK coNcRETE CLASS: 8208 CONCRETE SUPPLIER: TXI PLACV-MFaVr DATE: 03/08/1999 BATCH T~Mv.: 6:45am PLANT: 31 TIME SAMPLED: 7:55am S¥: Mike Odom SPECIFICATION REQUIREMENTS WEATHER COmmONS: Cloudy STa~'~O~: 5000 psi @ 28 Days TEMPERATURE (F) - AIR 54 F CONCRETE: 70 F SLUMP: 6" Max TRUCK NO: 648 TICKET NO: 1258774 AIR: N/A AIR CONTENT (%): N/A tmrr WEICIrr (pe0~ N/A TEST Mt"mOD: ASTM C- 143 PLAC~FAVr LOCATION: Same as Set 1 ASTM C-172 ASTM C-39 SAMPLE LOCATION: (3.5 at 17 REPORT OF TESTS ACCUMULATIVE YARDS: 400 CYLINDER MEASURED MAXIMUM COMPRESSIVE MARKED SLUMP DATE AGE LOAD STRENGTII FRACTURE SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE 4 I 5.50 03/10/1999 2 104770 3700 4 2 5.50 03/15/1999 7 141460 5000 4 3 5.50 03/15/1999 7 139950 4950 Average 4980 4 4 5.50 04/05/1999 28 189450 6700 4 5 5.50 04/05/1999 28 183750 6500 Average 6600 4 6 5.50 05/03/1999 56 T~hnician: Mike Odom Started: Finished: ~ ginee~ Report Distribution: En (I) The Beck Group (I) The Beck Group (I) Gromatzky Dupree & Assoc. (I) Dalcan, Inc. Eugefle-H~rbour (I) Brockette Davis Drake, lac. (1) HBC Engineering/Eugene Harbour Vice President (I) The Beck Group This repot~ is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering. Inc. 01TM Page 6 of 6