Loading...
Verizon-LR 990405 8901 Carpenter Frwy. Suite #100 Dallas, Texas 7~247 Date of Service: 02/02/1999 Report No.: 9903835 Report Date 04/05/1999 Client No.: 08644025 Project No.: 43-2333-98 Client: :.The~Ofoup.~ ~,~je~t~ O'i~~~m~ass Attn: Gillett Berger Coppell Road & Corporate Drive 1700 Pacific Ave., Suite 3800 Dallas TX 75201-4619 Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. PROJECT DATA CONTRACrOR: BECK CONCRC~'rE CLASS: 8208 CONCRETE SUPPLIER: TXI PLACEMENT DATE: 02/02/1999 BATCtl TIME: 1:56pm PLANT: 41 TIME SAMPLED: 2:25pm BY: Mike Odom SPECIFICATION REQUIREMENTS WEATHER CONDITIONS: Fair STRENGTH: 5000 psi ~ 28 Days TEMPERA~ORE (V)-AIR 62 F CONCRETE: 68 F SLUMP: 6.0" Max TRUCKNO: 460 TICKKTNO: 1229576 AIR: N~A AIR CONTENT (%): N/A uNrr WEIGHT (pc0: N/A TEST METHOD: ASTM C- ! 43 PLACEMENT LOCATION: Building Level V, Area B columns (19) (~ M, N, P ~ 93, M, N. P ~ 9.7, K. J, M, N ~ ASTM C-172 IO, E, F,G, H~ B. E,F~ I I,E,F,G(~ 12 ASTM C-39 SAMPLE LOCATION: P ~ 9.3 REPORT OF TESTS ACCUMULATIVE YARDS: 43.5 CYLINOER IVlEASURED MAXIMUM COMPRC~SlVE MARKED SLUMP DATE AGE LOAD STRENGTtl FRACTURE SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE I I 6.00 02/09/1999 7 ! 51550 5360 I 2 6.00 02/09/I 999 7 142760 5050 Average 5210 I 3 6.00 03/02/1999 28 221520 7830 ! 4 6.00 03/02/1999 28 218330 7720 Average 7780 I 5 6.00 03/30/1999 56 240640 8510 Technician: Mike Odom Started: 2:30pm Finished: 5:30pm ~ En~ Report Distribution: (I) The Beck Group ( I ) Thc Beck Group (I) Gromatzky Duprcc & Assoc. ( 1 ) Dalcan, Inc. Eugene Harbour (!) Brockette Davis Drake, Inc. (I) H BC Engineering/Eugene Harbour Vice President (I) The Beck Group This mOon is exclusively for thc usc of thc client indicatcd above aqd shall not hc reproduced except in full without thc written approval of HBC Engineering, Inc. OILL Page ! o'f !