Loading...
Verizon-LR 990402CONCRETE COMPRESSI STRENGTH TEST $901 Carpente~ Frwy., Suite #100 Z)~lt~, T~xa~ 75247 Date of Service: 03/01/1999 Report No.: 9906360 Report Date 04/02/1999 Client No.: 08644025 Project No.: 43-2333-98 Client: The Beck Group Project: GTE Shared Services Attn: Gillett Berger Coppell Road & Corporate Drive 1700 Pacific Ave., Suite 3800 Dallas TX 75201-4619 Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. PROJECT DATA COWnO, CTOR: BECK CONCam'~ cu,,ss: 9506 CONCRETE SUPPLIER: TXI PLACEMENT DATE: 03/01/1999 BATCHTIME: h21pm PLANT: 41 TIME SAMPLED: N/A BY: Mike Odom SPECIFICATION REQUIREMENTS WEATHER CONDITIONS: Fair s'rm~N(;Tm 3000 psi @ 28 Days xgava, gmcroRE {F} - AIR 76 g COnCRV:rw: 78 F SLmO: 6.0" Max TaUCKNO: 804 TICKer NO: 1253330 Am: N/A Am COiVrgNT (,r.): 2.8 uNrr WEXGH'r (P%0.: N/A TE.vr M~niOD: ASTM C-143 I'L~C~Wr LOCATION: Dock ramp Area A Level ! ASTM C-172 ASTM C-39 SAMPLE LOCATION: 10' S of building tie-in REPORT OF TESTS ACC Tr YARDS: 50 CYLINDER MEASURED MAXIMUM COMPRESSIVE MARKED SLUMP DATE AGE LOAD STRENGTH FRACTURE SET NO. (hw. hes) TESTED (days) (lbs. force) (l~i) TYPE 1 1 6.00 03/08/1999 7 95080 3360 1 2 6.00 03/0811999 7 96030 3400 Average ~ 3380 I 3 6.00 03119/1999 28 139260 4920 I 4 6.00 03f29/1999 28 146150 5170 Average 5050 I 5 6.00 04f26/1999 56 Ten (10) gallons of water added. T~chnician: Mike Odom Started: h00pm Finished: 4:00pm ~ Eng,~t~o~ Report Distribution: (I) The Beck Group (1) The Beck Group (I) Gromatzky Dupree & Assoc. (1) Dalcan, inc. Eugene Harbour (I) Brockette Davis Drake, inc. (1) HBC Engineering/Eugene Harbour Vice President (I) The Beck Group This report is exclusively for the use of the client indicated above and shall no~ he reproduced except in full without the written approval of HBC Engineering, Inc. 0ILL Page I of I CONCRETE COMPREbSIVE STRENGTH TEST 8901 Carpenter grwy,, Suite #100 Dall~, T,,~ 75247 Date of Service: 03/01/1999 Report No.: 9906359 Report Date 04/02/1999 Client No.: 08644025 Project No.: 43-2333-98 Client: The Beck Group Project: GTE Shared Services Attn: Gillett Berger Coppell Road & Corporate Drive 1700 Pacific Ave., Suite 3800 Dallas TX 75201-4619 Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength sample. PRO ECT DATA con'rRAc'rog: BECK CONCRE~ CLASS: 8208 CONCRETE SUPPLIER: TXI l'LAC~,~,lEt~r DA~: 03/0111999 BATCH TrM~: 12:22pm PLANT: 31 TtM~SAMP~D: l:20pm BY: Mike Odom SPEC~ICA~ON ~QUI~~ ~R commons: Faff S~NG~: 5~ psi ~ 28 Days sc~: 6.0" Max ~cg~o: 559 x~c~so: 1253231 Am: N/A nm co~ (~): N/A ~ ~a~ (~0: N/A ~T ~IOD: AS~ C- 143 p~c~ ~CATION: (20) ~l III-IV ~i~ A~ C ASTM C-172 ASTM C-39 SAMPLE ~CATION: E ~ 14 PORT OF TESTS CYL~ER ~SU~ ~~ CO~S~E ~D SL~P DA~ AGE LOAD ~O~ F~~ S~ NO. (~) ~D (~) (!~ f~e) (p~) ~PE I I 5.75 03/08/1999 7 133050 4710 I 2 5.75 03/08/1999 7 137950' 4880 Avenge 48~ I 3 5.75 03~9/1999 28 155470 55~ I 4 5.75 03~9/1999 28 1493~ 5280 Avenge 5390 I 5 5.75 ~1999 56 Tec~c~an Z~me: See ReporZ J9906360 Ten (~0) gallons o~ wa~er added. T~hnic~n: Mike Odom S~: Fi~h~: ~ E~ ~ D~tfibution: nc. (l)~ B~k G~p (I) ~ B~k G~p (I) Gm~y Du~ & ~. (I) ~. t~. Eugene Hat. ur (I) B~ket~ Davis DmZ. Inc. {I) HBC ~n~fin~Eugene Hater Vice ~esident (l) ~ Beck G~p ~is ~ ~ excl~ively f~ ~ u~ of ~ client in~ a~ve ~d shall nm ~ ~p~u~ Cx~ in full wi~t ~e written approval of HBC Engineering. inc. 0ILL Page 1 of I COHCRETE COMPRE ' IVE STRENGTH 8901 Carpenter Frwy. Suite #100 Dallas, Texas 75247 Date of Service: 02/01/1999 Report No.: 9903696 Report Date 04/02/1999 Client No.: 08644025 Project No.: 43-2333-98 Client: The Beck Group Project: GTE Shared Services Attn'. Gillett Berger Coppell Road & Corporate Drive 1700 Pacific Ave., Suite 3800 Dallas TX 75201-4619 Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. PROJECT DATA co~rrRAcToR: BECK CONCRETE CLASS: 8208 CONCRETE SUPPLIER: TXI PLACEMENT DATE: 02/01/1999 BATCH TIME: 1:48pm PLANT: 43 TIME SAMPLED: 2:30pm BY: Mike Odom SPECIFICATION REQUIREMENTS WEATHER CONOrrIONS: Partly cloudy STRENGTH: 5000 psi ~ 28 Days TEMPZRATURZ (~-AIR 62 F CONCRETE: 69 F SLUMP: 6.0'* Max TRUCKNO: 642 TICKET NO: 1228679 AIR: N/A AIR co~rrE~rr (%): N/A UNIT WEIGHT (PC0: N/A TEST MZTHOD: ASTM C- ! 43 PLACEME~rr LOCATION: Buildin$ l, L~vel V As B roofcolumns (19) A,B,C,D ~ 6, ABC ~17, AB ~ $, N,M,L,K ASTM C-172 ~ 9, K, j, L 0 9.3, K,j, L ~ 9.7 ASTM C-39 SAMPLE LOCATION: A-6 REPORT OF TESTS ACCUMULATIVE YARDS: 43.5 CYLINDER MEASURED blAXIblUM COMPRESSIVE MARKED SLUMP DATE AGE LOAD STRENGTH FRACTURE SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE ! ! 5.75 02/03/1999 2 54200 1920 I ! 5.75 02/08/1999 7 118110 4180 I 3 5.75 02/08/1999 7 134840 4770 Average 4480 i 4 5.75 03/01/1999 28 152940 5410 I 5 5.75' 03/01/I 999 28 143320 5070 Average 5240 I 6 5.75 03/29/1999 56 162140 5730 This report is exclusively Ibr Iht use of the client indicated above and shall not be reproduced except in full without thc written approval of HBC Engineering, Inc. 0iLL Page ! of 2 l~epo~ No.: 9903696 ' H~ Twenty (20).gallons of water added. Techaieiaa: l~lik¢ Odom Started: 1:30pm Fi.ished: 5:00pm ~ En~n~ Repo~ Di~tributioa: (I) ~c ~ck Group (I) Thc Beck Group (i) Gmma~y Dupmo & Assoc. ( I ) Dalcm~. Inc. ~u~Gfl~arbou[ (i) B~k~tc Davis D~kc. Inc. (I) HBC Enginccrin~Eugcnc Har~ur Vice P~idcnt (!) ~c Beck Group This report is exclusively for thc usc of thc client indicated above and shall not hc reproduced except in full without the writtcn approval of HBC Engineering, inc. OILL Page 2 of 2 CONCRETE COMPRESSIVE STRENGTH TEST ENGINEERI~, 8901 Carpenter Frwy., Suite #100 Dallas, Texas 7S247 Date of Service: 02/03/1999 Report No.: 9903954 Report Date 04/02/1999 Client No.: 08644025 Project No..' 43-2333-98 Client: The Beck Group Project: GTE Shared Services Attn: Gillett Berger Coppell Road & Corporate Drive 1700 Pacific Ave., Suite 3800 Dallas TX 75201-4619 Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. PROJECT DATA CONTRACTOR: BECK CONCRETE Ct~SS: 8208 CONCRETE SUPPLIER: TXI PLACEMENT OAT~: 02/03/1999 BATCH TIbiE: 2:50am PLANT: 31 TIME SAMPLED: 3:30am BY: Mike Odom SPECIFICATION REQUIREMEN'I~ WEATHER CoNDrrIoNS: Fair STR~NGTII: 5000 psi @ 28 Days 'rgM~El~TUaZ (ir) -AIR 46 F CONCRETE: 65 F SL~: 6.0" Max TRUCt~ NO: 725 TIC,LET NO: 1229699 AIR: N/A AIR Co~'rgNT (%): N/A UNIT WEIG~IT (pc0~ N/A TEST METIIOD: ASTM C- 143 PLACEMENT LOCATION: Roof slab (Area A) 1-5.7, A-D ASTM C-172 ASTM C-39 SAMPLE LOCATION: @ A.5 along !.5 REPORT OF TESTS ACCUMULATIVE YAROS: 5 I0 c~eu MEASUREO MAXIMUM COMPRESSIVE MARKED SLUMP DATE AGE LOAD STRENGTH FRACTURE SET NO. (inches) TESTED (days} (lbs. force) (psi) TYPE I I 5.50 02/0611999 3 103820 3670 1 2 5.50 02/1011999 7 147210 5210 I 3 5.50 02/10/1999 7 155760 5510 Average 5360 I 4 5.50 0310311999 28 178990 6330 I 5 5.50 03/03/1999 28 169450 5990 Average 6160 I 6 5.50 03/31/1999 56 186240 6590 This report is exclusively for thc use of the client indicated above and shall not bc reproduced except in full without the written approval of HBC Engineering, Inc. 01LL Page 1 of 10 Report No.: 9903954 Ten (10) ~allons of water added. This repo~ is exclusively for the usc of the client indicated above and shall not be reproduced except in full without thc written approval of HBC Engineering, Inc. 0ILL Page 2 of 10 CONCRETE COMPRESSIVE STRENGTH TES'! 8901 Carpemer Frwy. Suite #100 Dallas, Texas 75247 Date of Service: 02/03/1999 Report No.: 9903954 Report Date 04/02/1999 Client No.: 08644025 Project No.: 43-2333-98 Client: The Beck Group Project: GTE Shared Services Attn: Gillett Berger Coppell Road & Corporate Drive 1700 Pacific Ave., Suite 3800 Dallas TX 75201-4619 Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. PROJECT DATA CONT~,nCTOa: BECK CONCRETE CLASS: 8208 CONCRETE SUPPLIER: TXI PLAc~E~rr DATE: 02/03/1999 BATClt T~ME: 4:15am PLANT: 31 TIME SAMPLED: 4:50am aY: Mike Odom SPECIFICATION REQUIREMENTS WEATHER co~rorrlo~s: Fair STRENGTh: 5000 psi @ 28 Days TE~PE~RE (F) - AIR 43 F CONCRETE: 65 F SLm4P: 6.0" Max TRUC~CNO: 736 TiC~C~'r NO: 1229738 AIR: N/A AIR CO~rr~NT (~): N/A uNrr wEia~rr (pc0.-. N/A ~ M~rHOO: ASTM C- 143 PLACEMENT LOCATION: See page ! ASTM C- 172 ASTM C-39 SAMPLE LOCATION: Along C line @ 2 REPORT OF TESTS ACCUMULA vE YARDS: 510 c,a. e M -nSURED MAxr m cOMPREsslw MARKED SLUMP DATE AGE LOAD STRENGTH FRACTURE SET NO. (inche~) TESTED (days) (lbs. force) (psi) TYPE 2 1 5.75 02/06/1999 3 82490 2920 2 2 5.75 02/1011999 7 151560 5360 2 3 5.75 02/10/1999 7 156850 5550 Average 5460 2 4 5.75 03/03/1999 28 194290 6870 2 5 5.75 03/03/1999 28 190010 6720 Average 6800 2 6 5.75 03/31/1999 56 206410 7300 This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. OILL Page 3 of 10 Rhpo. rt No.: 9903954 Twenty (20) gallons of water added. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering. Inc. 0ILL Page 4 of 10 CONCRETE COMPRESSIVE STRENGTH TES I· 8901 Carpenter Frwy. Suite #100 Dalla.n, Texas 75247 Date of Service: 02/0311999 Report No.: 9903954 Report Date 04/02/1999 Client No.: 08644025 Project No.: 43-2333-98 Client: The Beck Group Project: GTE Shared Services Attn: Giilett Berger Coppell Road & Corporate Drive 1700 Pacific Ave., Suite 3800 Dallas TX 75201-4619 Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. PROJECT DATA CO~T~,CTOa: BECK CONC~"rE CLASS: 8208 CONCa~r~ SUPPLIEa: TXI P~CEM~rr DA~: 02/03/1999 ~ATC~ ~: 5:27am P~: 31 T~E SAMPLED: 6:15am BY: Mike Odom S~C~CATION ~QUI~ME~ WEAT~R CO~fflONS: Fair s~a~: 5~ psi ~ 28 Days T~~ SL~: 6.0" Max TgUCgNO: 814 T~C~ NO: 1229813 Am: N/A Am CO~ (~): N/A UmT ~GRT (~ N/A ~T M~IOD: AS~ C- 143 P~c~ L~ATION: See ~ge 1 ASTM C- 172 ASTM C-39 SAMPLE LOCATION: Along A.5 ~ 3 REPORT OF TESTS AC~TIVE YA~: 5 ~D SL~P DA~ AGE LOAD ST~NG~! F~~ S~ NO. (~c~) T~ED (days) (l~ fore) (~i) ~PE 3 I 6.~ 0~05/1999 2 88450 3130 3 2 6.~ 0~10/1999 7 161960 5730 3 3 6.~ 0~ 10/1999 7 178940 6330 Avenge ~30 3 4 6.~ 03/03/1999 28 1972~ 6970 3 5 6.~ 03/03/1999 28 187570 6630 Avenge 68~ 3 6 5.~ 03~1/1999 56 206140 7290 This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. 0ILL Page S of 10 Repo. rt No.: 9903954 Ten (10) Gallons of water added. This report is exclusively for thc use of the client indicaled above and shall t:ot be reproduced except in full without the written approval of HBC Engineering, Inc. OILL Pa~,e 6 of 10 CONCRETE COMPRESSIVE STRENGTH TES I' 8901 Carpenter grwy., Suite #100 Dalim, Texas 75247 Date of Service: 02/03/1999 Report No.: 9903954 Report Date 04/02/1999 Client No.: 08644025 Project No.: 43-2333-98 Client: The Beck Group Project: GTE Shared Services Attn: Giilett Berger Coppell Road & Corporate Drive 1700 Pacific Ave., Suite 3800 Dallas TX 75201-4619 Coppell, Texas Services: Obtain sample~ of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. PROJECT DATA co~croa: BECK CONCaETE C~.SS: 8208 CONCRgTE SUPPLIER: TXI PLACEMgaVr DATE: 02]03/1999 BATCH TIME: 6:43am PLANT: 31 TIME SAMPLED: 7:40am BY: Mike Odom SPECIFICATION REQUIREMENTS WEATHER CONOrrIONS: Fair STRr~GT~: 5000 psi @ 28 Days TEMPERATURE (g). AIR 47 ~' CONCaETE: 65 ~' SLtnVn': 6.0" Max TaVCKNO: 565 TlCr~'rNO: 1229918 AIa: N/A AIR co~r~rr (%): N/A uNrr w~i(;}rr (pc0:. N/A TEST M~T~OO: ASTM C-143 ~'LACg. M~NT LOCATION: See pase I ASTM C- 172 ASTM C-39 SAMPLE LOCATION: 4.5 ~ B REPORT OF TESTS ACCUMULATIVE YARDS: 510 CYLINDER MEASURED MAXIMUM COMPRESSIVE MA RICED SLUMP DATE AG E LOAD STRENGTH FRA CTU RE SET NO. (incl.) TESTED (days) (lbs. farce) (psi) TYPE 4 1 5.75 02/05/1999 2 110340 3900 4 2 5.75 02/10/1999 7 155810 5510 4 3 5.75 02/10/1999 7 147560 5220 Average 5370 4 4 5.75 03/03/1999 28 204070 7220 4 5 5.75 03/03/1999 28 201510 7130 Average 7180 4 6 5.75 03/31/1999 56 216420 7650 This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering. Inc. 0ILL Page 7 of 10 P~eport No.: 9903954 Ten (10) ~allons of water added. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering. Inc. 0ILL Page 8 of 10 cONCRETE COMPREssIVE STRENGTH TES', ' 8901 Carpmt~r grwy., Suit~ #1O0 ~ T~xas 75247 Date of Service: 02/03/1999 Report No.: 9903954 Report Date 04/02/1999 Client No.: 08644025 Project No.: 43-2333-98 Client: Thc Beck Group Project: GTE Shared Services Attn: Oilier Bcrgcr Coppell [toad & Corporate Drive l?00 Pacific Ave., Suite 3800 Dallas TX 75201-4619 Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive stren§th samples. PROJECT DATA COtCrRACTOR: BECK CONC~r~ CLASS: 8208 CONCRET~ SUfl, LIV. R: TXI ~'LACEM~-NT DATE.- 02/03/1999 BATCH T~Vgv.: 8:2 lam PLA~rr: 31 TIME SAMPLED: 9:10am NY: Mike Odom SPECIFICATION REQUIREMENTS WEATHER CONDITIONS: Fair s'nt~GTn: 5000 psi @ 28 Days TEMPERATURE (F). AIR 54 F CONCRETE: 68 F SLUM~: 6.0" Max TRUCK NO: 54 TICKET NO: 1230123 am: N/A Am cot~rEN'r ¢~): N/A UmT WeiGHT (l~): N/A ~ M~-'mOO: ASTM C- 143 PLACEMENT LOCATION: ASTM C-172 See page I ASTM C-39 SAMPLE LOCATION: Along C.5 @ 5 REPORT OF TESTS ACC~LATrVv-YARDS: 540 CYLINDER MEASURED btAXlMUM COMPRESSIVE MARKED SLUMP DATE AGE LOAD STRENGTH FRACTURE SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE · 5 I 5.50 02/05/1999 2 91360 3230 5 2 5.50 02/10/1999 7 150060 5310 5 3 5.50 02/10/1999 7 160000 5660 Average 5490 5 4 5.50 03/03/1999 28 203750 7210 5 5 5.50 03/03/1999 28 197750 6990 Average 7100 5 6 5.50 03~31 / 1999 56 219020 7750 This report is exclusively for the use of the client indicated above and shali not be reproduced except in full without the writ~n approval of HBC Engineering, Inc. 0ILL Page 9 of 10 R~po. rt No.: 9903954 ' H~C Twenty (20) gallons of water added. Technician: Mike Odom Started: 2:00am Finished: 11:00am I"l~~~'~ J Report Distribution: (!) The l~ck Group (1) The Beck Group (I) Gromatzky Dupree & Assoc. (I) Dalcan, Inc. Eugene Harbour (1) Broclmtte Davis Drake, Inc. (I) HBC Engineering/Eugene Harbour Vice President (1) The Beck Group This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. OILL Page 10 of 10 CONCRETE COMPRESSIVE STRENGTH TEST 8901 Carpenter Fr~., Suite #100 Dallas, Texas 75247 Report Date Date of Service: 03/24/1999 Report No.: 9908540 04/02/1999 Client No.: 08644025 Project No.: 43-2333-98 Client: The Beck Group Project: GTE Shared Services Attn: Gillett Berger Coppell Road & Corporate Drive 1700 Pacific Ave., Suite 3800 Dallas TX 75201-4619 Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. PROJECT DATA CONTRACTOR: BECK CONCRETE CRASS: 8208 CONCRETE SUPPLIER: TXI PLACEMENT DATE: 03/24/1999 BATCii TIME: 3:22am PLANT: 41 TIME SAMPLED: 4:05am BY: Mike Odom SPECIFICATION REQUIREMENTS WEATtlER CoNorrIONS: Partly cloudy sxRE,na'm: 5000 psi @ 28 Days TEMPERA~JRE (F) - AIR 50 F CONCRETE: 68 F SLm4P: 6" max. TaUCK NO: 669 TICKET NO: 1268830 AIR: N/A AIR CONTENT (%): N/A UNIT WEIGIIT (pcf).-. N/A TEST METIlOD: ASTM C- 143 PLACEMENT LOCATION: Roof Slab, Area C, lines 13 to 18 and £ to H ASTM C-t72 ASTM C-39 SAMPLE LOCATION: E.5114 REPORT OF TESTS ACCt~MVLATIVE YAI~OS: 50 CYL'~ER MZASURED MAX~IUM COMPRESStVE MARKED SLUMP DATE AGE LOAD STRENGTI! FRACTURE SET NO. (inehe$) TESTED (days) (lbs. force) (psi) TYPE I I 6.00 03/26/1999 2 80260 2840 I 2 6.00 03/31/1999 7 145970 5160 I 3 6.00 03/31/1999 7 136260 4820 Average 4990 I 4 6.00 04/21/1999 28 1 5 6.00 04/21/1999 28 I 6 6.00 05/19/1999 56 This report is exclusively for the use of the client indicated above and shall not be reproduced except in full.without the written approval of HBC Engineering, Inc. 01SS Page 1 of 9 . Report No.: 9908540 Test Cylinder 1-1 at 7:30 a.m. on 03/26/99 This repotx is exclusively for the use of the client indicated above and shall not be reproduced except in full without thc written approval of HBC Engineering, Inc. 015S Page 2 of 9 CONCRETE COMPRESSIVE STRENGTH TEST 8901 Carpenter Frwy., Suite #100 i)alL.=, Texas 75247 Date of Service: 03/2411999 Report No.: 9908540 Report Date 04/02/1999 Client No.: 08644025 Project No.: 43-2333-98 Client: The Beck Group Project: GTE Shared Services Attn: Gillett Berger Coppell Road & Corporate Drive 1700 Pacific Ave., Suite 3800 Dallas TX 75201-4619 Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. PROJECT DATA COnXsO, CTOR: BECK CONCRE'rE CLASS: 8208 CONCRETE SUPPLIER: TXI PLACEMENT DATE: 03/24/1999 BATCHTIME: 4:45am PLANT: 41 TIME SAMPLED: 5:15am BY: Mike Odom SPECIFICATION REQUIREMENTS WEATHER CONDITIONS: Partly cloudy STm~N~;Ttt: 5000 psi @ 28 Days TEMPERATURE (r)-nla 55 F CONCRE"rE: 68 F SLUMP: 6" max. TRUCK NO: 835 TlCK~T NO: 1268917 AIR: N/A AIR CONTENT (%): 1.8 UNIT wr-Iatrr (pcO:. N/A Tr.s-r MZ'niOO: ASTM C-143 Pt~XCEMENT LOCATION: See page !. ASTM C-172 ASTM C-39 Air confirmation test was performed on this set of cylinders. SAMPLE LOCATION: Along line F.5/15.5 REPORT OF TESTS ACCUblULATIVE YARDS: 160 CYLINDER MEASURED MAXIMUbl COMPRESSIVE MARKED SLUMP DATE AGE LOAD STRENGTtI FRACTURE SET NO. (Inches) TESTED (days) (lbs. force) (psi) TYPE 2 I 5.75 03/26/1999 2 79690 2820 2 2 5.75 03/31/1999 7 150450 5320 2 3 5.75 03/3111999 7 141350 5000 Average 5160 2 4 5.75 04/21/1999 28 2 5 5.75 04/2 1/1999 28 2 6 5.75 05/19/1999 56 This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. 01SS Page 3 of 9 Report No.: 9908540 Test Cylinder 2-1 at 7:30 a.m. on 03/26/99 This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering. Inc. OISS Page 4 of 9 8901 Carpenter Frwy., Suite #100 ~ Texas ?5247 Date of Service: 03/24/1999 Report No.: 9908540 Report Date 04/02/1999 Client No.: 08644025 Project No.: 43-2333-98 Client: The Beck Group Project: GTE Shared Services Atto: Gillett Berger Coppell Road & Corporate Drive 1700 Pacific Ave., Suite 3800 Dallas TX 75201-4619 Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. PROJECT DATA CotcrRACTOR: BECK CONCRETE CLASS: 8208 CONC~ SUPPLIER: TXI PLACEMENT DAT~: 03/24/1999 RATClt TIME: 6L 12am PLANT: 41 TIME SAMPLED: 6:55am aY: Mike Odom SPECIFICATION RgQUIREMEN'I~ WEATHER CONDmONS: Cloudy, no wind s'rREnaTm 5000 psi @ 28 Days 'rgMPERA'ruag(F)-AIR 67 F CONCRETe: 66 F SLt~P: 6" max. TRUCK NO: 454 TICKETNO: 1269017 AIR: N/A AIR CONTENT (%): N/A UNiT WEIGHT (pc0..- N/A TEST METIIOD: ASTM C- 143 PLACEMENT LOCATION: See page I. ASTM C- 172 ASTM C-39 SAMPLE LOCATION: Lines E.5 to F along line 16 REPORT OF TESTS ACCUMULATIVE YARDS: 270 CYLINDER MEASURED MAXIMUM COMPRESSIVE MARKED SLUMP DATE AGE LOAD STRENGTH FRACTURE SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE 3 I 6.00 03/26/1999 2 83570 2960 3 2 6.00 03/31/1999 7 140470 4970 3 3 6.00 03/31/1999 7 148980 5270 Average 5120 3 4 6.00 04/21/1999 28 3 5 6.00 04/21/1999 28 3 6 6.00 05/19/1999 56 This repo~ is exclusivcly for the usc of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. 01SS Page 5 of 9 l~eport No.: 9908540 Test Cylinder 3-1 at 12:00 p.m. on 03/26/99 This report is exclusively for thc use of the client indicated above and shall not be reproduced except in full without the written approval of H BC Engineering, Inc. OISS Page 6 of 9 8901 Carpenter Frwy., Suite #100 Dallas, Tex~ ?524? Date of Service: 03/24/1999 Report No.: 9908540 Report Date 04/02/1999 Client No.: 08~4025 Project No.: 43-2333-98 Client: The Beck Group Project: GTE Shared Services Attn: Gillett Berger Coppell Road & Corporate Drive 1700 Pacific Ave., Suite 3800 Dallas TX 75201-4619 Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. PROJECT DATA CONTRACTOR: BECK CONCRE"rE CLASS: 8208 CONCRETE SUPPLIER: TXI PLACEMENTDA'm: 03/2411999 BATCItTIME: 8:41am PLANT: 41 TIME SAMPLED: 9:30am BY: Mike Odom SPECIFICATION REQUIREMENTS WEATItER CONOrrloNs: Cloudy s'rREt~aT~t: 5000 psi @ 28 Days TgMPERATURE(r~- AIR 53 g CONCRETE: 68 F sun~: 6" max. TaVCK NO: 837 TICKer NO: 1269423 AIR: N/A AIR CONTENT (~): N/A UNIT WEIGHT (per).~ N/A TEST METHOD: ASTM C- 143 PLACF~IENT LOCATION: See page I. ASTM C- 172 ASTM C~39 SAMPLE LOCATION: Line F at line 17 REPORT OF TESTS ACC TIVE YA OS: 430 CYC ER MEASUREO MAXmuM COMPZZSSlVE MARKED SLUMP DATE AGE LOAD STRENGTH FRACTURE SET NO. (inch~s) TESTED (days) (lbs. force) (psi) TYPE 4 I 5.75 03/26/1999 2 80240 2840 4 2 5.75 03/31/1999 7 140690 4980 4 3 5.75 03/3111999 7 144450 5110 Average 5050 4 4 5.75 04/2111999 28 4 5 5.75 04/2111999 28 4 6 5.75 05/19/1999 56 This repo~ is exclusively for the usc of thc client indicated above and shall not bs reproduced cxcept in full without Ibc written approval of HBC Engincering, Inc. 01SS Page 7 of 9 l~el~,rt No.: 9908540 ' a~ Test Cylinder 4-1 at 12:00 p.m. on 03/26/99 This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. OlSS Page 8 of 9 CONCRETE COMPRESSIVE STRENGTH TEST 8901 Carpenter Fr~., Suite #100 Dallm, T~ 75247 Date of Service: 03/24/1999 Report No.: 9908540 Report Date 04/02/1999 Client No.: 08644025 Project No.: 43-2333-98 Client: The Beck Group Project: GTE Shared Services Attn: Gillett Berger Coppeil Road & Corporate Drive 1700 Pacific Ave., Suite 3800 Dallas TX 752014619 Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. PROJECT DATA CONTRACTOm BECK CONCRETE CLASS: 8208 CONC~'TE SUPPLIEa: TXI PLACEM,VaVT DAT~: 03/24/1999 aATCr~ Tn~4E: 10:13am PLANT: 41 TIME SAMPLED: 10:45am aY: Mike Odom SPECIFICATION REQUIREMENTS WEATHER CON~rrIONS: Partly cloudy STmT~GT~: 5000 psi @ 28 Days TEMPERATURE (~). AIR 62 V CONCRETE: 70 V SLUMP: 6" max. TRUCK NO: 450 TICKET NO: 1269657 Aim N/A AIR co~rr~NT (%): N/A UNIT WEIGI1T (1~0:. N/A TEST METIIOD: ASTM C- 143 PL~C~lE~rr LOCATION: See page 1 ASTM C- 172 ASTM C-39 SAMPLE LOCATION: Line G.5, lines 17.5 to 18 REPORT OF TESTS ACCtn LA E VAMPS: 510 CYLINDER MEASURED MAXIMUM COMPRESSIVE MARKED SLUMP DATE AGE LOAD STRENGTH FRACTURE SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE 5 I 4.75 03/26/1999 2 90670 3210 5 2 4.75 03/31 / 1999 7 147420 5210 5 3 4.75 03/31/1999 7 141350 5000 Average 5110 5 4 4.75 04/21/1999 28 5 5 4.75 04/21/1999 28 5 6 4.75 05/19/1999 · 56 Technician: Mike Odom Started: 2:00am Finished: l:00pm ~ En 'g~ Report Distribution: ( I ) Th~ Beck Group ( I ) The Beck Group (I) Gromatzky Dupree & Assoc. (I) Dalcan, lac. Eugene Harbour (I) Brockelte Davis Drake. Inc. (I) H BC Engineering/Eugene Harbour Vice President (I) The Beck Group This report is exclusively for the use of ~he client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering. Inc. olss Page 9 of 9