Verizon-LR 990330CONCRETE COMPREoSIVE STRENGTH TESi'
8901 Carpenter Frwy., Suite #I00
Dallas, Texas 75247
Date of Service: 01/28/1999 Report No.: 9903453 Report Date
03/30/1999
Client No.: 08644025 Project No.: 43-2333-98
Client: The Beck Group Project: GTE Shared Services
Attn: Gillett Berger Coppeli Road & Corporate Drive
1700 Pacific Ave., Suite 3800
Dallas TX 75201-46 ! 9 Coppell, Texas
Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast
compressive strength samples.
PROJECT DATA
CONTRACTOR: BECK CONCRETE Ct.nS& 9508
CONCRETE SUPPLIER: TXI PLACEMENT DATE: 01/28/1999 BATCH TIME: 1:06pm
Pr. ANT: 41 TIME SAMPLED: l:45pm BY: Mike Odom
SPECIFICATION REQUIREMENTS WEATHER conorrlons: Cloudy
STRENGTH: 4000 psi ~ 28 Days TEMPERATURE (l~. AIR 72 F CONCRETE: 75 F
SLUMP: 6.0" Max TRUCKNO: 459 TICKETNO: 1227852
AIR: N/A AIR CONTENT (%): N/A UNIT WEIGHT (pc0.: N/A
T~T MET. OO: ASTM C= 143 PLACEMENT LOCATION:
ASTM C- 172 Building I, Level I, patio retaining walls west to south
ASTM C-39
SAMPLE LOCATION: See below
REPORT OF TESTS ACCUMULATIVE YARDS: 30
CYLINDER MEASURED MAXIMUM COMPRESSIVE
MARKED SLUMP DATE AGE LOAD STRENGTH FRACTURE
SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE
I I 5.75 02/04/1999 7 101770 3600
I 2 5.75 02/04/i 999 7 103610 3660
Average 3630
I 3 5.75 02/25/I 999 28 - 163290 5770
I 4 5.75 02/25/1999 28 169330 5990
Average 5880
I 5 5.75 03/25/1999 56 175640 6210
Sample location: West side wall, 20' south from north end.
Technician: Mike Odom Started: 1:30pm Finished: 4:30pm ~ En~ineaml~g, In~.
Report Distribution:
(I) Thc Beck Group ( I ) Thc Beck Groop
(I) Gromatzky Dupree & Assoc. (I) Dalcan. I,e. Eugene Harbour
(I) Brockette Davis Drake. Inc. (I) I IBC Euginccri,g/Eugc,e Harbour Vice President
(I) The Beck Group
This report is exclusively for the usc of the client indicated .'tbovc and shall not be reproduced except in full without thc written approval of HBC Engineering, Inc.
0ILL Page ! of I
8901 Carpenter Envy., Suite #I00
Dallas, Texas 75247
Dnte of Service: 01/28/1999 Report No.: 9903452 Report Date
03/30/1999
Client No.: 08644025 Project No.: 43-2333-98
Client: The Beck Group Project: GTE Shared Services
Attn: Gillett Berger Coppell Road & Corporate Drive
1700 Pacific Ave., Suite 3800
Dallas TX 75201-4619 Coppell, Texas
Services: Obtain samples of'fresh concrete at the placement locations, perform required field test and cast
compressive strength samples.
PROJECT DATA
CONTRACTOR: BECK CONCRETE CLASS: 8208
CONCRETE SUPPLIER: TX! PLACEMENT DATE: 01/28/1999 BATCH TIME: 6:47am
PLANT: 41 TIME SAMPLED: 7:lSam BY: Mike Odom
SPECIFICATION REQUIREMENTS WEATHER CONDITIONS: Cloudy
STRENGTH: 5000 psi ~ 28 Days TEMPERATURE (F) - AIR 61 F CONCRETE: 72 F
SLUMP: 6.0'* Max TRtJCK NO: 457 TICKET NO: 1227414
AIR: N/A AIR CO~rrENT (%): N/A UNIT WEIGitT (pct'): N/A
TEST METIIOD: ASTM C- 143 PLACEMENT LOCATION:
Building slab Level V ($B) 5.7-B, A-D & E-H
ASTM C- 172
ASTM C-39
SAMPLE LOCATION: Beam along midway line
REPORT OF TESTS ACCUMULATIVE YARDS:' 530
CYLINDER MEASURED MAXibIUM COMPRESSIVE
MARKED SLUMP DATE AGE LOAD STRENGTH FRACTURE
SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE
i I 5.75 01/31/1999 3 1071 I0 3790
I 2 5.75 02/04/! 999 7 130570 4620
1 3 5.75 02/04/1999 7 134800 4770
Average 4700
! 4 5.75 02/25/1999 28 183850 6500
! 5 5.75 02/25/1999 28 176400 6240
Average 6370
1 6 5.75 03/25/! 999 56 195470 6910
This report is exclusively for the use of thc client indicated above and shall qot bc reproduced except in full without the written approval of HBC Engineering, Inc.
0ILL Page I of 8
CONCRETE COMPR 'oSIVE STRENGTH TES ·
8901 Carpenter Frnvy., Suite #100
Dallas, Texas 75247
Date of Service: 01/28/1999 Report No.: 9903452 Report Date
03/30/1999
Client No.: 08644025 Project No.: 43-2333-98
Client: The Beck Group Project: GTE Shared Services
Attn: Giilett Berger 'Coppeil Road & Corporate Drive
1700 Pacific Ave., Suite 3800
Dallas TX 75201-4619 Coppell, Texas
Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast
compressive strength samples.
PROJECT DATA
CONTRACTOR: BECK CONCRETE CLASS: 8208
CONCRETE SUPPLIER: TXI PLACEMENT DATE: 01/28/1999 aATCH TIME: 7:55am
PLANT: 41 TIME SAMPLED: 8:55am BY: Mike Odom
SPECIFICATION REQUIREMENTS WEATHER CONDITIONS: Cloudy
STRENGTH: 5000 psi ~ 28 Days TEMPERATURE (F) - AIR 63 F CONCRETE: 76 F
SLUMP: 6.0" Max TRUCKNO: 462 TIC~TNO: 1227529
AIR: N/A AIR CONTENT (%): N/A UNIT WEIGHT (pe~: N/A
TEST METItOD: ASTM C- 143 PLACEMENT LOCATION:
Sec page I
ASTM C- 172
ASTM C-39
SAMPLE LOCATION: Along Line C & 6.5
REPORT OF TESTS ACCUMULATIVE YARDS: 530
CYLINDER MEASURED MAXIMUM COMPRESSIVE
MARKED SLUMP DATE AGE LOAD STRENGTH FRACTURE
SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE
2 i 5.25 01/31 / 1999 3 106530 3770
2 2 5.25 02/04/1999 7 126470 4470
2 3 5.25 02/04/I 999 7 130610 4620
Average 4550
2 4 5.25 02/25/199.9 28 166350 5880
2 5 5.25 02/25/1999 28 173180 6120
Average 6000
2 6 5.25 03/25/1999 56 186100 6580
This report is exclusively for thc usc of thc client indicated above and shall not be reproduced except in full without thc written approval of HBC Engineering, Inc.
OILL Page 2 of 8
Kepo. rt No.: 9903452
Ten (10) gallons of water added.
This report is cxclusivcly for thc usc or'thc client indicated above and shall not be rcproduccd except in £ull without thc written approval of HBC Engineering. Inc.
0ILL Page 3 of 8
CONCRETE COMPRE oSIVE STRENGTH TES $-
8901 Carpenter Frvry., Suite #100
Dallas, Texas 75247
Date of Service: 01/28/1999 Report No.: 9903452 Report Date
03/30/1999
Client No.: 08644025 Project No.: 43-2333-98
Client: The Beck Group Project: GTE Shared Services
Attn: Gillett Berger Coppell Road & Corporate Drive
1700 Pacific Ave., Suite 3800
Dallas TX 75201-46 ! 9 Coppell, Texas
Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast
compressive strength samples.
PROJECT DATA
CONTRACn'OR: BECK CONCRETE CLASS: 8208
CONCRETE SUPPLIER: TX[ PLACEMENT DATE: 01/28/1999 BATCHTIME: 8:41am
PLANT: 41 TIME SAMPLED: 9:55am BY: Mike Odom
SPECIFICATION REQUIREMENTS WEATHER CONDITIONS: Cloudy
STRENGTIt: 5000 psi @ 28 Days TEMPERATURE (F) - AIR 65 F CONCRETE: 73 F
SLUMP: 6.0" Max TRUCK NO: 360 TICKET NO: 1227584
AIR: N/A AIR CONTENT (%): N/A UNIT WEIGHT (peg): N/A
TEST METllOD: ASTM C- 143 PLACEMENT LOCATION:
See page I
ASTM C- 172
ASTM C-39
SAMPLE LOCATION: Along K & 9.3
REPORT OF TESTS ACCUblULATIVE YARDS: 530
CYLINDER MEASURED MAXIMUM COMPRESSIVE
MARKED SLUMP DATE AGE LOAD STRENGTH FRACTURE
SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE
3 i 5.75 01/31/1999 3 90130 3190
3 2 5.75 02/04/1999 7 120460 4260
3 3 5.75 02/04/! 999 7 118460 4190
Average 4230
3 4 5.75 02/25/i 999 28 141040 4990
3 5 5.75 02/25/1999 28 143040 5060
Average 5030
3 6 5.75 03/25/1999 56 162470 5750
This report is exclusively for the usc of the client indicated above :md shall not be reproduced except in full without the written approval of HBC Engineering, Inc.
0iLL Page 4 of 8
Repgrt No.: 9903452
Twenty (20) gallons of water added.
This report is exclusively Ibr the use of thc clie,t it~dicated above .'md shall not be reproduced except in full without the written approval of HBC Engineering. Inc.
0ILL P'4ge 5 of 8
CONCRETE COMPREoSIVE STRENGTH TES
ENGINEERINg,
8901 Carpenter Frn~y., Suite #100
Dallas, Texas 75247
Date of Service: 01/28/1999 Report No,: 9903452 Report Date
03/30/1999
Client No.: 08644025 Project No.: 43-2333-98
Client: The Beck Group Project: GTE Shared Services
ARm Gillett Berger Coppell Road & Corporate Drive
1700 Pacific Ave., Suite 3800
Dallas TX 75201-4619 Coppell, Texas
Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast
compressive strength samples.
PROJECT DATA
CONTRACTOR: BECK CONCRETE CLASS: 8208
CONCRETE SUPPLIER: TXI PLACEMENT DATE: 01/28/1999 BATCHTIME: 9:39am
PLANT: 41 TIME SAMPLED: 10:45am aY: Mike Odom
SPECIFICATION REQUIREMENTS WEATHER CONDrrIONS: Cloudy
STRENGTlt: 5000 psi ~ 28 Days TEMPERATURE(I~-AIR 66 ~' CONCRETE: 73 F
SLUMP: 6.0" Max TRVCKNO: 414 T[c~rNO: 1227664
AIR: N/A AIR CONTENT (%}: N/A UNIT WEIGHT (PC0.: N/A
TEST METlIOD: ASTM C- i 43 PLACEMENT LOCATION:
ASTM C- i 72 See page I
ASTM C-39
SAMPLE LOCATION: Along G & I !.5
REPORT OF TESTS ACCUMULATIVE YARDS: 530
CYLINDER MEASURED MAXIMUM COMPRESSIVE
MARKED SLUMP DATE AGE LOAD STRENGTH FRACTURE
SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE
4 I 6.00 01/30/1999 2 65040 2300
4 2 6.00 02/04/1999 7 I 18460 4190
4 3 6.00 02/04/1999 7 124150 4390
Average 4290
4 4 6.00 02/25/! 999 28 171020 6050
4 5 6.00 02/25/1999 28 164240 5810
Average 5930
4 6 6.00 03/25/1999 56 183070 6470
This report is exclusively t~r thc usc of thc clicnt iqdicated above and shall not bc reproduced except in full without thc written approval of HBC Engineering, Inc.
0ILL Page 6 of 8
R~epo. rt No.: 9903452
Twenty (20) gallons of water added.
This report is exclusively tbr thc use of thc clio,it i,~dicatcd above a.d shall not be reproduced except in full without thc written approval of HBC Engineering, Inc.
0iLL Page 7 of 8
8901 Carpenter Frwy., Suite #100
Dallas, Texas 75247
Date of Service: 01/28/1999 Report ]No.: 9903452 Report Date
03/30/1999
Client No.: 08644025 Project No.: 43-2333-98
Client: The Beck Group Project: GTE Shared Services
Attn: Gillett Berger Coppeil Road & Corporate Drive
1700 Pacific Ave., Suite 3800
Dallas TX 75201-4619 Coppell, Texas
Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast
compressive strength samples.
PROJECT DATA
CONTRACTOR: BECK CONCRETE Ct.ASS: 8208
CONCRETE SUPPLIER: TXI PLACEMENT DATE: 01/28/1999 BATCIITIME: 1 l:12am
PLANT: 41 TIME SAMPLED: 12:lSpm nv: Mike Odom
SPECIFICATION REQUIREMENTS WEATHER CONOmONS: Cloudy
STRENGTth 5000 psi ~ 28 Days TEMPERATURE (F) - AIR 69 F CONCRETE: 76 F
SLUMP: 6.0" Max TRUCK NO: 640 TICKET NO: 1227767
AIR: N/A AIR CONTENT {%}: N/A UNIt WEIGHT {per).: N/A
TEST METIIOD: ASTM C- [ 43 PLACEMENT LOCATION:
,See page I
ASTM C- 172
ASTM C-39
SAMPLE LOCATION: E.5 & 11.5
REPORT OF TESTS ACCUMULATIVE YARDS: 520
CYLINDER MEASURED MAXiblUbl COMPRESSIVE
MARKED SLUMP DATE AGE LOAD STRENGTH FRACTURE
SET NO. (inches) TESTED {days) (lbs. force) (psi) TYPE
5 I 5.50 01/30/1999 2 69150 2450
5 2 5.50 02/04/1999 7 122860 4340
5 3 5.50 02/04/1999 7 126720 4480
Average 4410
5 4 5.50 02/25/I 999 28 183710 6500
5 5 5.50 02/25/I 999 28 183470 6490
Average 6500
5 6 5.50 03/25/i 999 56 201470 7130
Technician: Mike Odom Started: 6:00am Finished: l:30pm ~----...~ E.~..,~A.~W,
Report Distribution:
(I) The Beck Group (I) Tile Beck Group
(I) Gromatzky Dupre¢ & Assoc. (I) Dalcan. Iqc. Eugene Harbour
(!) Brockette Davis Drake. Inc. (I) HBC Engi,~ccring/Eugcne Harbour Vice President
( I ) 'll~e Beck Group
This report is exclusively for the use or'thc client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc.
0ILL Page 8 of 8