Loading...
Verizon-LR 990324CONCRETE COMPRESSIVE STRENGTH TES'x 8901 Carpenter Fr~. Suite #100 Dallas, T~ms 75247 Date of Service: 02/19/1999 Report No.: 9905560 Report Date 03/24/1999 Client No.: 08644025 Project No.: 43-2333-98 Client: The Beck Group Project: GTE Shared Services Attn: Gillett Bcrger Coppell Road & Corporate Drive 1700 Pacific Ave., Suite 3800 Dallas TX 75201-4619 Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. PROJECT DATA CotfrRAcToR: BECK CONCRETE CLASS: 8208 CONCRETE SUPPLIER: TXI PLAC~VlEt~rr OAT~: 02/19/1999 BATCH TUrin: 12:24pm PLAinT: 41 TIME SAMPLED: l:20pm BY: Mike Odom SPECIFICATION REQUIREMENTS WEATHER CONDITIONS: Fail' ~a'm: 5000 psi @ 28 Days TV. ZIPERATURE(V) -A,R 63 F CONCa~'rE: 76 F SLUMP: 6" Max TRUCK NO: 805 TiCK~-'r NO: 12457555 AIR: N/A Am coivTE~'r (%): N/A UNIT WEIGHT (pc/): N/A TEST METIlOD: ASTM C- 143 PLACEMENT LOCATION: See note below ASTM C- 172 ASTM C-39 SAMPLE LOCATION: R5-9.7 REPORT OF TESTS ACCUMULATIVE YARDS: 50 CYLINDER MEASURED MAXEklUM COMPRESSIVE MARKED SLUMP DATE AGE LOAD STRENGTH FRACTURE SET NO. (incl.) TESTED (days) (lbs. force) (psi) TYPE I I 6.00 02/26/1999 7 103860 3670 I 2 6.00 02/26/1999 7 96400 3410 Average 3540 I 3 6.00 03/19/1999 28 143540 5080 I 4 6.00 03/19/1999 28 148350 5250 Average 5170 1 5 6.00 04/16/1999 56 NOT~.: Roof Co].umrxg, Az'eR B, RC-R1, RE-R]., R/~-R1, R5-9.7; r.ev~]. 2 t:o 3, Area A, ].£nes ~.4, ~.5, 1.6, ~.7, & 18 through r.j. nas Technician: Mike Odom Started: 12:00pm Finished: 5:30pm ~ E Report Distribution: (I) The Beck Group (I) The Beck Group (l) Gromatzky Dupree & Assoc. ( I ) Dalcan. Inc. Eugene Harbour (I) Brockette Davis Drake. Inc. {I) HBC Engineering/Eugene Harbour Vice President ( I} The Beck Group This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering. Inc. 01TM Page I of I CONCRETE COMPREbSIVE STRENGTH TES'i' 8901 Carpent~ Frwy., Suite #100 Dallas, Texas 7S247 Date of Service: 01/25/1999 Report No.: 9903049 Report Date 03/2411999 Client No.: 08644025 Project No.: 43-2333-98 Client: The Beck Group Project: GTE Shared Services Attn: Gillett Bergcr Coppell Road & Corporate Drive 1700 Pacific Ave., Suite 3800 Dallas TX 75201-4619 Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. PROJECT DATA COnTRac'roa: BECK CONC~'r~ CLASS: 8208 CONCRETE SUPPLIER: TXI PLACEME1TYDATE: 01/25/1999 BATCHTI3,1E: h30pm PL~rr: 41 TIME SAMPLED: 2:05pm BY: Mike Odom SPECIFICATION REQUIREMENTS WEATHER CONOmONS: Partly cloudy STaENaTH: 5000 psi @ 28 Days TEMPERATURE (F). AIR 68 F CONCRETE: 70 F SLm~P: 6.0" Max TRUC~C NO: 715 TIcgrr NO: 1224264 Am: N/A Am co~r~rr (%): N/A uNrr WEICmT (pc0: N/A TF_.~T METHOD: ASTM C- 143 PLAC~rr LOCATION: Level V roof columns (20) A,B,C, D Lines I-5 ASTM C-172 ASTM C-39 SAMPLE LOCATION: A @ 5 REPORT OF TESTS ACCUM LATn YAP S: 47 CYLINDER MEASURED MAX~IUM COMPRESSIVE MARKED SLUMP DATE AGE LOAD STRENGTH FRACTURE SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE I 1 6.00 02/01/1999 7 106700 3770 I 2 6.00 02/01/1999 7 116180 4110 Average 3940 I 3 6.00 02/22/1999 28 128190 4530 I 4 6.00 02/22/1999 28 124950 4420 Average 4480 1 5 6.00 03/22/1999 56 143060 5060 Technician: Mike Odom Started: h30pm Finished: 4:30pm H~ E~ Report Distribution: ( ! ) The Beck Group (I) The Beck Group (!) Gromatzky Dupree & Assoc. (I) Dalcan, Inc. Eugene Harbour ( I ) Brockette Davis Drake, Inc. (I) HBC Engineering/Eugene Harbour Vice President (I) The Beck Group This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. 0ILL Page I of I CONCRETE COMPREbSIVE STRENGTH TES'I' 8901 Carpent~ Fr~., Sult~ #100 ~ T~ms 7~247 Date of Service: 02/22/1999 Report No.: 9905743 Report Date 03/24/1999 Client No.: 08644025 Project No.: 43-2333-98 Client: The Beck Group Project: GTE Shared Services Attn: Gillett Berger Coppell Road & Corporate Drive 1700 Pacific Ave., Suite 3800 Coppell, Texas Dallas TX 75201-4619 Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. PROJECT DATA cotrr~croR: BECK CONCRETE C~SS: 8208 CONCRETE SUPPLIER: TXI PLAC~EIVr OAaX: 02/22/1999 BATCH TIME: ! :48pm ~,t~,n'r: 41 T~mSnMl't~O: 2:20pm BY: Mike Odom SPEC~'ICATION REQUIREMENTS WEATHERCO~mONS: Partly cloudy STa~a~: 5000 psi @ 28 Days -rva~ERA'ru~(v)-Am 62 ~' CONCRE'r~: 72 F SLUI~: 6.0" Max TRUC~ NO: 804 ~cK~-'r No: 1247099 Ama N/A AIa CO~ (~): N/A vNrr WEIGHT (pe0.~ N/A ~ biwmoo: ASTM C- 143 PL,~,CEMF.~rr LOCA~ON: Dock/patio screen wall, Area A, Level I north end placement ASTM C-172 ASTM C-39 SAMPLE LOCATION: Center area third lift REPORT OF TESTS ACCOm..~Axrv~-YARDS: 27 CYLIblDER MEASURED MAXlbIUM COMPRESSIVE MARKED SLUMP DATE AGE LOAD STRENGTH FRACTURE s~ NO. ~,~) T.UT~O ou~.) o~ fo,-~) ~o vn, e I 1 5.75 03/01/1999 7 157350 5560 I 2 5.75 03/01/1999 7 168260 5950 Average $760 I 3 5.75 03/22/1999 28 200490 7090 1 4 5.75 03/22/1999 28 211170 7470 Average 7280 I 5 5.75 0411911999 56 Technician: Mike Odom Started: 10:00am Finished: 3:30pm ~ En~ Report Distribution: (I) Tbe Beck Group (1) The Beck Group (1) Gromatzky Daix~e & Assoc. (1) Dalcan, Inc. Eugene' Harbour (I) Bmckette Davis Drake. Inc. (I) HBC Engineering/Eugene Harbour Vice President (I) The Beck Group This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the writ~n approval of HBC Engineering, Inc. OILL Page I of I CONCRETE COMPRESSIVE STRENGTH TES I' $901 Cm'p~at~r Fray., Suite #100 ~ T~ 75247 Date of Service: 01/22/1999 Report No.: 9902917 Report Date 03/24/1999 Client No.: 08644025 Project No.: 43-2333-98 Client: The Beck Group Project: GTE Shared Services Attn: Gillett Berger Copper Road & Corporate Drive 1700 Pacific Ave., Suite 3800 Dallas TX 75201-4619 Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. PROJECT DATA CO~aACTOR: BECK CONCRETE CRASS: 9508 CONCRE~m SU~'PLmR: TXI r~c~vr DATE: 01/22/1999 B~,TCH TUV~: 2:16pm v~¢r: 41 Tn~ S~,M~LZO: 2:55pm BY: Marlo Villanueva SPECIFICATION REQUIREMENTS WEATHER CONDmONS: Cloudy STmmGTH: 4000 psi @ 28 Days TEM~TUR~ (V). Am 51 F CONCa~TE: 68 F SLU~IF: 3-5" TaUCK NO: 641 T~Cr, XT NO: 1223197 Am: N/A Am co~ (~): N/A uNrr W~IGaT (po'):. N/A TEST r~THOD: ASTM C-143 PL~C~Z~Avr LOCATION: ASTM C-172 Loa~ns dock retaining wall & footing ASTM C-39 SAMPLE LOCATION: See below REPORT OF TESTS VAlUeS: lo CYLINDER MEASURED MAXIMUM COMPRESSIVE MARKED SLUMP DATE AGE LOAD STRENGTH FRACTURE SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE I 1 5.25 01/29/1999 7 131170 4640 1 2 5.25 01/29/1999 7 142180 5030 Average 4840 I 3 5.25 02/19/1999 28 204900 7250 I 4 5.25 02/19/1999 28 211740 7490 Average 7370 I 5 5.25 03/19/1999 56 224770 7950 Sample location: South end of retaining wall. 15' east o£ footing Technician: Mario Villanueva Started: 2:30pm Finished: 4:30pm I-~ Report Distribution: i~.ngin~ Inc. (1) Tbe Beck Group (1) Th~ Beck Group (i) Gromatz~y Dupr~¢ & ^.~oc. (!) I~ican, Inc. Eugene Harbour (I) Bro~kett~ Davis Drake, Inc. (1) I-IBC £ngin~ering/~gene Itarbour Vice President (!) The Beck Group This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. OILL Page I of I