Loading...
Verizon-LR 990316CONCRETE COMPRESSIVE STRENGTH TESI' 8901 Carpenter Frwy., Suite #100 l}allaa, Texas 75247 Date of Service: 03/08/1999 Report No.: 9906983 Report Date 03/16/1999 Client No.: 08644025 Project No.: 43-2333-98 Client: The Beck Group Project: GTE Shared Services Atto: Gillett Berger Coppell Road & Corporate Drive 1700 Pacific Ave., Suite 3800 'Dallas TX 75201-4619 Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. PROJECT DATA CONTanCTO~: BECK COt~CP.m'E CLASS: 8208 CONCRETE SUPPLIER: TXI PLACV_Z4V_zcr DATE: 03/08/1999 BATCh TIME: 3:08am PLArfr: 31 TIME SAMPLED: 3:55am BY: Mike Odom SPECIFICATION REQUIREMENTS WEATHER co~romONS: Cloudy, drizzle s'rm~NGTm 5000 psi @ 28 Days X~XtPERA~Jm~ (~-AIR 49 P CONCa~'r~: 68 P SLb'MP: 6" Max TaUCK NO: 479 ~CgeT NO: 1208732 Am: N/A Am COtCr~nT (~): N/A UNIT w~ioI-rr (pc0: N/A Tr~ST METHOO: ASTM C- 143 PLACEMENT LOCATION: Building Slab. Level IV, Area C, line E to H and 13 to 18 ASTM C-172 ASTM C-39 SAMPLE LOCATION: E.l and 13.1 REPORT OF TESTS ACCVmna E YARDS: 500 CVLU,roeu ASURED coMP v. SSlV MARKED SLUMP DATE AGE LOAD . STRENGTH FRACTURE SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE I 1 5.25 03/10/1999 2 I06190 3760 I 2 5.25 03/15/1999 7 146180 5170 I 3 5.25 03/15/1999 7 156050 5520 Average 5350 I 4 5.25 04/05/1999 28 I 5 5.25 04/05/1999 28 I 6 5.25 05/03/1999 56 This repot1 is exclusively for ~he use of the clicnt indicated above and shall not bc reproduced except in full without the written approval of HBC Engineering, Inc. 01TM Page 1 of 6 I~epo. rt No.: 9906983 Ten (10) ~allons of water added. This report is exclusively for thc use of the client indicated above and shall not be reproduced except in full without thc written approval of HBC Engineering, Inc. 01TM Page 2 of 6 C ONCRETE COMPRESSIVE STRENGTH TEST 8901 Carpenter Frwy., Suite #100 Dall~, T~ms 75247 Date of Service: 03/08/1999 Report No,: 9906983 Report Date 03/16/1999 Client No.: 08644025 Project No.: 43-2333-98 Client: The Beck Group Project: GTE Shared Services Attn: Gillett Berger Coppell Road & Corporate Drive 1700 Pacific Ave., Suite 3800 Dallas TX 75201-4619 Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. PROJECT DATA co~crro, c"roR: BECK CONCRE'r~ CLASS: 8208 CONCRETE SUPPLIER: TXI PLACEMg. I~rr DATE: 03/0811999 BATCH TnVn~: 4:57am PLAlVr: 31 TIME SAMPLED: 5:45am BY: Mike Odom SPECII~ICATION REQUIREMENTS WEATHER CoNorrloNs: Cloudy, No Drizzle s~ar_~GTH: 5000 psi @ 28 Days TEMPERATURE (ri- Am 52 ~r CONCRE'r~: 68 F SLUM~: 6" Max TRUCKNO: 738 r~cr, ETt~o: 1258745 AIR: N/A AIR CONTEbrr ('~): N/A uNrr W~IGHT (pd)~ N/A TEST METHOD: ASTM C- 143 PLAC~NT LOCATION: San~ as Set 1 ASTM C-172 ASTM C-39 SAMPLE LOCATION: E.3 at 15.3 REPORT OF TESTS ACCU~OLA~E YAP. OS: 500 CYU~VE~ ~St~D ~X~t COMPm~.SSn~ MARKED SLUMP DATE AGE LOAD. STRENGTH FRACTURE SET NO. (inches) TESTED (days) (ll~. force) (psi) TYPE 2 1 5.50 03/10/1999 2 107120 3790 2 2 5.50 03/15/1999 7 152300 5390 2 3 5.50 03/15/1999 7 158590 5610 Average 5500 2 4 5.50 04/05/1999 28 2 5 5.50 04/05/1999 28 2 6 5.50 05/03/1999 56 This r~p~c~ is exclusively for the use of the client indicated above and shall no~ be reproduced except in full without the written approval of HBC Engineering. Inc. 01TM Page 3 of 6 l~epo, rt No.: 9906983 NOTE: 15 gallons of water added to concrete. This report is exclusively for the use of thc client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. 01Th! Page 4 of 6 CONCRETE COMPRESSIVE STRENGTH TEST 8901 Carpenter grwy., Suite #100 Dallas, Texas 75247 Date of Service: 03/08/1999 Report No.: 9906983 Report Date 03/16/1999 Client No.: 08644025 Project No.: 43-2333-98 Client: The Beck Group Project: GTE Shared Services Attn: Gillett Berger Coppell Road & Corporate Drive 1700 Pacific Ave., Suite 3800 Dallas TX 75201-4619 Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. PROJECT DATA CONT~OR: BECK co~cRE'n~ Ct, ASS: 8208 CONC~-'r~suPPt~ER: TXI PLAC~ViFavr OA~'g-: 03/08/1999 RATCXtX~nE: 5:50am PLANT: 31 TXM~ SAMPLED: 6:55am BY: Mike Odom SPECIFICATION REQUIREMKNTS WEATHER COt~mONS: Cloudy, Dry sTg~axtz: 5000 psi @ 28 Days TEM~EaATIa~ (V). Am 54 V CONCgET~: 68 F SLt~O': 6" Max TRUCKNO: 722 TICK~.T NO: 1258758 AIR: N/A AIR CONTENT (%): N/A uNrr WEIGHT (pc0: N/A TEST METHOD: ASTM C-143 PLACEMENT LOCATION: Same as Set I ASTM C- 172 ASTM C-39 SAMPLE LOCATION: 1::.5 at 16 REPORT OF TESTS ACCUMU TIVE YARDS: 500 CYLINDER MEASURED MAXlblUM COMPRESSIVE MARKED SLUMP DATE AGE LOAD STRENGTH FRACTURE SET NO. (inch~s) TESTED (days) (lbs. force) (psi) TYPE 3 1 5.25 03/10/1999 2 119740 4230 3 2 5.25 03/15/1999 7 153450 5430 3 3 5.25 03/15/1999 7 147280 5210 Average 5320 3 4 5.25 04/05/1999 28 3 5 5.25 04/05/1999 28 3 6 5.25 05/03/1999 56 This report is exclusively for the use of thc client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering Inc. 01Tbl Page 5 of 6 CONCRETE COMPRESSIVE STRENGTH TEST 8901 Carpenter Frwy., Suite #100 Dallas, Texas 7S247 Date of Service: 03/08/1999 Report No.: 9906983 Report Date 03/16/1999 Client No.: 08644025 Project No.: 43-2333-98 Client: The Beck Group Project: GTE Shared Services Attn: Gillett Berger Coppell Road & Corporate Drive 1700 Pacific Ave., Suite 3800 Dallas TX 75201-4619 Coppell, 'Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. PROJECT DATA coNTRA~R: BECK coNc~ cLAss: 8208 CONCKWI'E SUPPLIER: TXI PLACEMENT DATE: 03/08/1999 BATCH ~v~v.: 6:45am PLANT: 31 TIME SAMPLED: 7:55am BY: Mike Odom SPECIFICATION REQUIREMENTS WEATHER CONDITIONS: Cloudy sTR.~aTH: 5000 psi @ 28 Days TEM~-RATURE (1~. Am 54 r CONCam'g: 70 r SLb~n': 6" Max TRUCK NO: 648 TIcx~'r NO: 1258774 Am: N/A Am CONTENT (~): N/A UNIT W~IGHT (pa): N/A TEST biff'HOD: ASTM C- 143 PLACEMENT LOCATION: Same as Set 1 ASTM C-172 ASTM C-39 SAMPLE LOCATION: (3.5 at 17 REPORT OF TESTS YARD : 400 CYLINDER MEASURED MAXIMUM COMPRF~SIVE MARKED SLUMP DATE AGE LOAD . STRENGTH FRACTURE SET NO. (inches) TESTED (days) (Ib~ force) (psi) TYPE 4 I 5.50 03/10/1999 2 104770 3700 4 2 5.50 03/15/1999 7 141460 5000 4 3 5.50 03/15/1999 7 139950 4950 Average 4980 4 4 5.50 04/05/1999 28 4 5 5.50 04/05/1999 28 4 6 5.50 05/03/1999 56 Technician: Mike Odom Started: Finished: H~ Engineering/ Report Distribution: ( 1 ) The Beck Group (1) Thc Beck Group I (!) Gromatzky Duprec & As~ec. (1) Dalcan, Inc. Eugene Harbour (1) Breckette Davis Drake, Inc. (1) HBC Engineering/Eugene l*l,~ur Vice President (1) The Beck Group This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. OITM Page 6 of 6 CONCRETE COMPRESSIVE STRENGTH TEST 8901 Carpenter Frwy., Suite #100 !)~11~, Texas 75247 Date of Service: 01/18/1999 Report No.: 9902392 Report Date 03/16/1999 Client No.: 08644025 Project No.: 43-2333-98 Client: The Beck Group Project: GTE Shared Services Attn: Gillett Berger Coppell Road & Corporate Drive 1700 Pacific Ave., Suite 3800 Dallas TX 75201-4619 Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. PROJECT DATA cot,rrRA~OR: BECK CONC~ CLASS: 154 CONCRETE SUPPLIER: TXI PLAC~Vr DATE: 01/18/1999 BATCH TaYto: 2:59am Pt~.~rr: 41 TIM~SA~ED: 3:30am BY: Mike Odom SPECIFICATION REQUIREMENTS WEATHER conomo~s: Fair s'raz~GTH: 5000 psi @ 28 Days TEM~EP.A~ (F). AIR 41 F CONCRETE: 62 F SLX.rMV: 6.0" Max TRUCKSO: 715 'ncr~-'rt~o: 1216779 AIR: N/A AIR co~r~rr (%): [.7 uto~r WEIGHT (pe~: N/A ~ MmntOO: ASTM C- 143 PLACF. M~ LOCATION: Level IV building slab Area B. 5.7-13 Lines ASTM C-172 ASTM C-39 SAMPLE LOCATION: C.5 @ 6 REPORT OF TESTS ACCUMUCAXIVZ YARDS: 540 CYLINDER MEASURED MAXIMUM COMPRESSIVE MARKED SLUMP DATE AGE LOAD - STRENGTH FRACTURE SET NO. (inch~s) TESTED (days) (ib~ force) (psi) TYPE I 1 5.50 01/20/1999 2 117510 4160 I 2 5.50 01/21/1999 3 135720 4800 1 3 5.50 01/25/1999 7 163380 5780 1 4 5.50 01/25/1999 7 169330 5990 Average 5890 I 5 5.50 02/15/1999 28 229570 8120 I 6 5.50 02/15/1999 28 242550 8580 Average 8350 This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering. Inc. 0ILL Page 1 of 10 Report No.: 9902392 i.a.J~ CYLINDER MEASURED MAXIMUM ' COMPRESSIVE MARKED SLUMP DATE AGE LOAD STRENGTH FRACTURE SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE I 7 5.50 03/15/1999 56 263240 9310 This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. 01LL Pnge 2 of 10 CONCRETE COMPRESSIVE STRENGTH TEST 8901 Carpenter Frwy., Suit~ #100 i~n~% Texas 75247 Date of Service: 0111811999 Report No.: 9902392 Report Date 03/16/1999 Client No.: 08644025 Project No.: 43-2333-98 Client: The Beck Group Project: GTE Shared Services Attn: Gillett Berger Coppell Road & Corporate Drive 1700 Pacific Ave., Suite 3800 Dallas TX 75201-4619 Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. PROJECT DATA CONTRACTOR: BECK CONCRE'r~ CLASS: 154 CONCRETE SUPPLIER: TXI PLACEMENT DATE: 01/1811999 BATCHTIME: 4:lgam PL~lVr: 41 TIME SAMPLED: 4:45am BY: Mike edom SPECIFICATION REQUIREMENTS WEATHERCO~OmONS: Fair STRE~aTm 5000 psi @ 28 Days TEM~Eg~,TURE (~ -Am 38 g CONCRE?E: 63 F SLUMP: 6.0" Max TRUCKNO: 716 TICKE~NO: 1216814 Am: N/A AIR CONTEtcr (~): N/A uNrr WE~aitT (p~0~ N/A TEST METHOD: ASTM C- 143 PLACEMENT LOCATION: See page 1 ASTM C-t72 ASTM C-39 SAMPLE LOCATION: B.5 ~ 6.5 REPORT OF TESTS ACCreTIVE YARDS: 5~) CYLINDER MEASURED MAXIMUM COMPRESSIVE MARKED SLUMP DATE AGE LOAD . STRENGTH FRACTURE SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE 2 I 5.50 01/2011999 2 121610 4300 2 2 5.50 01/21/1999 3 143700 5080 2 3 5.50 01/25/1999 7 155590 5500 2 4 5.50 01/25/1999 7 158590 5610 Average 5560 2 5 5.50 0211511999 28 224290 7930 2 6 5.50 0211511999 28 218520 7730 Average 7830 This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC En~ncering, Inc. 01LL Page 3 of 10 R'epo. rt No.: 9902392 .. ~,~ CYLINDER MEASURED MA~ ' COMPRESSIVE MARKED SLUMP DATE AGE LOAD STRENGTH FRACTURE SET NO. (inches) TESTED (days) Obs. force) (psi) TYPE 2 ? 5.50 03/15/1999 56 240130 8490 Ten (10) gallons o£ wager added. This report is exclusively for u~e use of the client indicated above and shall not be reproduced except in full without thc written approval of HBC Engineering. Inc. 0ILL Page 4 of 10 CONCRETE COMPRESSIVE STRENGTH TEST 8901 Carpeam' Frwy., Suite #100 Dallas, Texas 75247 Date of Service: 01/18/1999 Report No.: 9902392 Report Date 03/16/1999 Client No.: 08644025 Project No.: 43-2333-98 Client: The Beck Group Project: GTE Shared Services Attn: Gillett Berger Coppcll Road & Corporate Drive 1700 Pacific Ave., Suite 3800 Dallas TX 75201-4619 Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. PROJECT DATA CONTRACXOR: BECK CONCRETE CLASS: 154 CONCRETE SUPPLIER: TXI PLACEMENT DATE: 01/18/1999 BATCHTIME: 5:31am PLANT: 41 TIMI~SAMPLED: 6:00am BY: Mike Odom S~CnqCATION m~ui~ W~R co~r~moNs: Fair STI~NaTII: 5000 psi @ 28 Days TEM~ERATtm~ ~-Am 41 F CONCRETE: 59 F SLUM~: 6.0" Max TaUCK NO: 451 TICKET NO: 1216878 AIR: N/A Am CONTENT (~): N/A UNiT WEIGHT (pet'): N/A TEST METHOD: ASTM C- 143 PLACEMENT LOCATION: See page 1 ASTM C- 172 ASTM C-39 SAMPLE LOCATION: M,5 @ 9.3 REPORT OF TESTS ACCUMULATIVE YARDS: 540 CYLIHDER MEASURED MAXIMUM COMPRESSIVE MARKED SLLrMp DATE AGE LOAD . STRENGTH FRACTURE SET NO. (inches) TF.~TED (days) Obs. force) (psi) TYPE 3 I 5.75 01/20/1999 2 119380 4220 3 2 5.75 01/21/1999 3 137730 4870 3 3 5.75 01/25/1999 7 167940 5940 3 4 5.75 01/25/1999 7 178940 6330 Average 6140 3 5 5.75 02/15/1999 28 224460 7940 3 6 5.75 02/15/1999 28 217840 7700 Average 7820 This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. 01LL Page 5 of 10 Rel~.rt No.: 9902392 CYLINDER MEASURED ' MAXIMUM ' COMPRESSIVE. MARKED SLUMP DATE AGE LOAD STRENGTH FRACTURE SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE 3 7 $.75 03/15/1999 56 239040 $450 This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without thc written approval of HBC Engineering, Inc. 0ILL Page 6 of 10 CONCRETE COMPRESSIVE STRENGTH TEST 8901 Carpem~ Frwy., Sult~ #100 Dallas, Texas 75247 Date of Service: 01/18/1999 Report No.: 9902392 Report Date 03/16/1999 Client No.: 08644025 Project No.: 43-2333-98 Client: The Beck Group Project: GTE Shared Services Attn: Gillett Berger Coppell Road & Corporate Drive 1700 Pacific Ave., Suite 3800 Dallas TX 75201-4619 Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. PROJECT DATA CONTR~Croa: BECK CONCR~'n~ CLASS: 154 CONCRETE SUPPLIER: TXI PLACEMENT DATE: 01/18/1999 BATCHTIME: 6:41am PLAr~r: 41 TIME SAMPLED: 7:05am l~v: Mike Odom SPECIFICATION REQUIREMENTS WEATHERCOm)rrIoNS: Fair S'rR~aTH: 5000 psi @ 28 Days TmOr. RA~Jm~ fl,-Am 39 ~' CONCRETE: 61 l~ SLOM~: 6.0" Max TRUCK NO: 803 TICK~:r NO: 1216946 AIR: N/A Am cot~rEt~rr (%): N/A ur~rr w~lGrrr (pc0: N/A T~T M~"niOO: ASTM C-143 PLACEMENT LOCATION: See page I ^STM C-172 ^STM C-39 SAMPLE LOCATION: G.5 @ I0 REPORT OF TESTS ACCUMVLnXrVE YARDS: 540 CYLINDER MEASURED MAXIMUM COMPRESSIVE MARKED SLUMP DATE AGE LOAD. STRENGTH FRACTURE SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE 4 1 6.00 01/20/1999 2 122120 4320 4 2 6.00 01/21/1999 3 130050 4600 4 3 ' 6.00 01/2511999 7 170860 6040 4. 4 6.00 01/25/1999 7 184000 6510 Average 6280 4 5 6.00 02/15/1999 28 215500 7620 4 6 6.00 02/15/1999 28 240860 8520 Average 8070 ( This report is exclusively for the use of the client indicated above and shall no~ be reproduced except in full without ~he written approval of HBC Engineering, Inc. 0ILL Page 7 of 10 R~Port No.: 9902~92 ' ~H~ CYLINDER MEASURED MAXIMUM · COMPRESSIVE MARKED SLUMP DATE AGE LOAD STRENGTH FRACTURE SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE 4 ? (5.00 03/15/1999 56 2520?0 8910 This report is exclusively for the usc of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering. Inc. 0ILL Page 8 of 10 CONCRETE COMPRESSIVE STRENGTH TES I' 8901 Carpenter grwy., Suite #100 Dallas, Texas 7S247 Date of Service: 01/18/1999 Report No.: 9902392 Report Date 03/16/1999 Client No.: 08644025 Project No.: 43-2333-98 Client: The Beck Group Project: GTE Shared Services Attn: Gillett Berger Coppell Road & Corporate Drive 1700 Pacific Ave., Suite 3800 Dallas TX 75201-4619 Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. PROJECT DATA CONTRACTOR: BECK CONCRETI~ CLnSS: 154 CONCRETE SUPPLIER: TXI PLACEMENT DATE: 01/18/1999 BATCHTIME: 8:09am PLANT: 41 TIME SAMPLED: 8:35am BY: Mike Odom SPECIFICATION REQUIREMENTS WEATHERCO~mONS: Fair s'ra.~G'm: 5000 psi @ 28 Days ~n~m,~-RA'rv~ O0-AIa 41 r CONCRETV-: 61 r SLUM~: 6.0" Max XaVCKNO: 802 Ticg~'rNo: 1217130 AIR: N/A Am CONTOUr (%): N/A u~rr WEIGHT {per): N/A TEST ME'FitOD: ASTM C- 143 PLACEMENT LOCATION: See page 1 ASTM C-172 ASTM C-39 SAMPLE LOCATION: E. 5 @ 12 REPORT OF TESTS ACCUMULATIVE YARDS: 540 CYLINDER MEASURED MAXlbIUM COMPRESSIVE MARKED SLUMP DATE AGE LOAD. STRENGTH FRACTURE SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE 5 I 5.75 01/20/1999 2 1186 I0 4190 5 2 5.75 01/21! 1999 3 137060 4850 5 3 5.75 01/25/1999 7 158430 5600 5 4 5.75 01/25/1999 7 161470 5710 Average 5660 5 5 5.75 02/15/1999 28 230760 8160 5 6 5.75 02/15/1999 28 219450 7760 Average 7960 This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. 0ILL Page 9 of 10 CYLINDER MEASURED MAXIbiUM ' COMPRESSIVE MARKED SLUMP DATE AGE LOAD STRENGTH FRACTURE SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE 5 7 5.75 03/15/1999 56 246710 8730 Ten (10) gallons of water added. Technician: Mike Odom Started: 2:00am Finished: 10:00am -r-rx,-n~ Engin~.,~nc' Report Distribution: (I) The Beck Group (I) The Beck Group (i) Oromatzky Dupree & Assoc. (1) Daican, Inc. Eugcnc~larbour (i) Brockette Davis Drake, Inc. (1) HBC Engineering/Eugene Harbour Vice President (I) The Beck Group This repotx is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. 0ILL Page 10 of 10 CONCRETE COMPRESSIVE STRENGTH TES t ~901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Date of Service: 02/15/1999 Report No.: 9905054 Report Date 03/16/1999 Client No.: 08644025 Project No.: 43-2333-98 Client: The Beck Group Project: GTE Shared Services Attn: Gillett Berger Coppell Road & Corporate Drive 1700 Pacific Ave., Suite 3800 Dallas TX 75201-4619 Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. PROJECT DATA Cotcr~,C~OR: BECK CONC~T~ CLASS: 8208 CONCRETE SUPPLIER: TXI Pcnc~v2cr OAT~: 0~15/1999 BATCH T~: 2:37pm P~: 41 T~SA~LED: 3:05pm BY: Mike Odom SPE~CA~ON ~QUI~~ ~RCO~mONS: Pa~y Cloudy ~G~: 5~ psi ~ 28 Days ~E~ (~ - AIR 68 g CONC~: 76 F SL~: 6" Max TRUCKNO: 454 ~c~ No: 1240569 AIR: N/A nm CO~ (%): N/A v~ ~a~ (~: N/A ~T ~OD: AS~ C- 143 P~cm~ LOCA~ON: R~f ~ium~ (4) A~a B RA-R.3, LI-9,2, R4.7-9.7, R4.3~.7 ASTM C-172 ASTM C-39 SA~ LOCATION: J. ! -9.2 PORT OF TESTS ac vn s: 5.50 ~D SL~P DATE AGE LOAD. S~G~ F~~ S~ NO. (~) ~D (~ys) (!~ f~) (~ TYPE 1 1 5.50 0~1999 7 163530 5780 I 2 ~.~0 0~1999 7 173860 6150 Average ~970 I 3 5.50 03115/1999 28 197890 7~ I 4 ~.~0 03/1~/1999 28 2 I05~0 74~0 Avenge .7~0 I 5 5.50 ~/1~1999 56 Ten ~a~Zons of water added. Technltian: Mike Odom Started: 2:00pm Finished: 4:00pm ~ ~olnaa~'~ae4~ Engin nc. Report Distribution: (I) The Beck Group (I) The Beck Group (I) Gromatzk¥ Duprec & Assoc. (I) Dalcan, Inc. Eugene Harbour (I) Brockettc Davis Drake, Inc. (!) HBC Engineering/Eugene Hathaur Vice President (1) The B~ck Group This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBO Engineering, lac. 01TM Page I of 1 CONCRETE COMPRESSIVE STRENGTH TES ' 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Report Date Date of Service: 01/18/1999 Report No.: 9902420 03116/1999 Client No.: 08644025 Project No.: 43-2333-98 Client: The Beck Group Project: GTE Shared Services Attn: Gillett Berger Coppell Road & Corporate Drive 1700 Pacific Ave., Suite 3800 Dallas TX 75201-4619 Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. PROJECT DATA CONTRACTOR: BECK CONCRETE CLASS: 8208 CONCRETE SUPPLIER: TXI PLACEMENT DATE: 01/18/1999 BATCHTIME: 3:23pm PLANT: 31 TIME SAMPLED: 4:15pm sv: Mike Odom SPECIFICATION REQUIREMENTS WEATHERCONDmoNs: Fair STaZN(rra: 5000 psi @ 28 Days Tlr. MPERATUa~ ~.,~nt 63 r coNcRETE: 68 r SLUMP: 6.0" Max TRUCKNO: 480 TicKwrno: 1217978 Am: N/A Am CONTENT (~): N/A u~u-r WEIGHT (per): N/A TEST METHOD: ASTM C- 143 PLACEMENT LOCATION: Level IV building colunu~ (9) A,B, C,D O 6, A,B C ~7, N & M O 9 ASTM C-172 n~: Fifteen (15) gallons of water added. ASTM C-39 SAMPLE LOCATION: A ~ 7 REPORT OF TESTS ACCUMULATIVE YARDS: 19.5 CVL DER SURED MARKED SLUMP DATE AGE LOAD . STRENGTH FRACTURE SET NO. (inches) TESTED (days) (ihs. force) (psi) TYPE 1 1 6.00 01/19/1999 1 32390 1150 I 2 6.00 01/2511999 7 98460 3480 1 3 6.00 01/25/1999 7 105700 3740 Average 3610 I 4 6.00 02/1511999 28 155320 5490 1 5 6.00 02/1511999 28 145590 5150 Average 5320 I 6 6.00 03/15/1999 56 166020 5870 Technician: Mike Odom Started: 3:00pm Finished: 6:00pm ~ IE~.~c. Report Distribution: (I) Th~ Beck Group (I) Th~ Beck Group (I) (;romaugy ~upree & Assoc. (t) Dalcan. tac. Eu~ne Harbour (I) Broclame Davis Drake, Inc. (1) HBC Engineering/Eugene Harbour Vice President (1) Tl~ Beck Oroup This report is exclusively fro' the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Enginecrin~ Inc. OILL Page I of I CONCRETE COMPRESSIVE STRENGTH TEST 8901 Carpenter grwy., Suite #100 DnIL~ T,~o~ 7S247 Date of Service: 02/12/1999 Report No.: 9904867 Report Date 03/16/1999 Client No.: 08644025 Project No.: 43-2333-98 Client: The Beck Group Project: GTE Shared Services Attn: Gillett Berger Cgppell Road & Corporate Drive 1700 Pacific Ave., Suite 3800 Dallas TX 75201-4619 Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. PROJECT DATA con'r~c'roR: BECK CONC~'TE Ct~SS: 8208 CONCRETE SUPPLIER: TXI ~'L~CEMEn'r DATE: 0~1 ~1999 BATCH T~: 1:34pm e~: 41 T~S~L~: 2:15pm ~Y: .Mike Odom SPEC~I~ON ~UI~ ~A~R co~moss: Fair ~G~: 5~ psi ~ 28 Days ~E~ (~- AIR 61 SL~: 6.0" Max TRUCK~O: 8~ mC~ NO: 1239~2 n~ N/A A~R CO~ (~}: N/A uN~ WE~G~ (~ N/A ~ ~OD: AS~ C-143 P~C~ LOCATION: R~f- ~n~s~ stem wall & (4} ~f ~nthosue colu~ ~-9.~ RA-RS, R4.7-9.4m, ASTM C- 172 a~.3.o.~. ASTM C-39 SABLE ~ATION: Stemw~l ~ong Li~ RB REPORT OF TESTS ~cc~v~ c~ga M~sv~n ~m~ co~s~ ~ SL~P DA~ AGE LOAD S~G~ S~ NO. (~m) T~D (da~) (l~ f~{e) (p~) ~PE I 1 5.25 0~ 19/1999 7 102340 3620 I 2 5.25 0~19/1999 7 106840 3780 Average 37~ I 3 5.25 0311~1999 28 153~0 5430 I 4 5.25 03/1~19~ 28 159080 5630 Avenge 5530 1 5 5.25 ~/~/1999 56 F~ve {5) 9aiions o~ water added. T~h~cian: Mike Odom Sun~: 2:~pm ~h~: 4:~pm ~ Engi.~~ Re~ D~tribufion: (I) ~ B~k G~p (1) ~ Beck Gmp (I} G~y Du~e & A~. (1) Dal~n, lac. Eugen~ Harbour (I) B~ket~ ~a DmZ, Inc. (1) H BC Engin~fin~ugea~ H~ur Vice ~esident (!) ~ Beck Gmp This report is exclusively for the use of thc client indicated above and shall not be reproduced except in full without thc written approval of HBC Engineering, lac. 0ILL Page 1 of 1