Loading...
Verizon-LR 990315CONCRETE COMPRESSIVE STRENGTH TEST 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Date of Service: 01/15/1999 Report No.: 9902254 Report Date 03/15/1999 Client No.: 08644025 Project No.: 43-2333-98 Client: The Beck Group Project: GTE Shared Services Attn: Gillett Berger Coppell Road & Corporate Drive 1700 Pacific Ave., Suite 3800 Dallas TX 75201-4619 Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. PROJECT DATA CONTRACTOm BECK CONCRET~ CLASS: 8205 CONCRETE SUPPLIER: TXI PLAC~NTDATE: 01/15/1999 BATCHTIbiE: 3:21am PLANT: 41 T1M~SAMPLED: 3:45am aY: Mike Odom SPECIFICATION REQUIREMENTS WEATHER CONDITIONS: lair STRENGTH: 4000 psi @ 28 Days '~MPERATURE (~). AIR 32 F CONCRETE: 57 F SLUMP: 6.0" Max 'rauc~ NO: 714 Tict~-'r NO: 1215486 AIa: 3-6% Am cowrENT (,~,): 5.8 ut~r WEIGHT (pc0: N/A TEST METHOD: ASTM C-143 PLACraV~NT LOCATION: East side paving quadrant along outside east side fire lane ASTM C-172 ASTM C-39 SAMPLE LOCATION: See below REPORT OF TESTS ACCUMULATIVE YARDS: 440 CYLINDER MEASURED MAXI3dUM COMPRESSIVE MARKED SLUMP DATE AGE LOAD STRENGTH FRACTURE SET NO. (inch~s) TESTED (days) (lbs. force) (psi) TYPE t I 5.25 01/22/1999 7 104890 37 I0 I 2 5.25 01/22/1999 7 96310 3410 Average 3560 I 3 5.25 02/12/1999 28 148940 5270 I 4 5.25 02/12/1999 28 155200 5490 Average 5380 I 5 5.25 03/12/1999 56 162140 5730 Sample location: Entrance lane, between 2nd and 3rd bullnose from south end. This aport is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, lac. 0ILL Page 1 of 4 CONCRETE COMPRESSIVE STRENGTH TEST 8901 Carpenter Frwy., Suite #100 ~ Texas 75247 Date of Service: 01/15/1999 Report No.: 9902254 Report Date 03/15/1999 Client No.: 08644025 Project No.: 43-2333-98 Client: The Beck Group Project: GTE Shared Services Attn: Gillctt Berger Coppell Road & Corporate Drive 1700 Pacific Ave., Suite 3800 Dallas TX 75201-4619 Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. PROJECT DATA coNTaAcrom BECK CONCI~-'rE Ct,ASS: 8205 CONCr. ETE surrLmm TXI PLACEM~rr OAT~: 01/15/1999 BATCH TIME: 4:47am PLANT: 41 TIME SAMPLED: 5:15am BY: Mike Odom SPECIFICATION REQUIREMENTS WEATI-I~R CONDITIONS: Fail' STRENO~t: 4000 psi @ 28 Days Tr-Mrr. aA'mRE ~-AIa 32 r CONCRETE: 55 sLurm,: 6.0" Max TRUCKNO: 714 TICKErNo: 1215571 AIR: 3-6% Am cot~r~NT (%): 4.9 uNrr WEIGHT (pcf): ~ MEHIOD: ASTM C- 143 PLACEMENT LOCATION: See page I ASTM C-172 ASTM C-39 SAMPLE LOCATION: See below REPORT OF TESTS accu n.nTrvz YAWS: 440 CYLINDER MEASURED MAXIDiLrM COMPRESSIVE MARKED SLUMP DATE AGE LOAD STRENGTH FRACrURE SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE 2 I 6.00 01/22/1999 7 100100 3540 2 2 6.00 01/22/1999 7 105440 3730 Average 3640 2 3 6.00 02/12/1999 28 159720 5650 2 4 6.00 02/12/1999 28 153780 5440 Average 5550 2 5 6.00 03/12/1999 56 166080 5870 Sample location: Exit lane and 5th north, ward bull nose from south end This repori is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. 0ILL Page 2 of 4 CONCRETE COMPRESSIVE STRENGTH TEST 8901 Cari~nter Frwyn Suite #100 Dallas, T~ 75247 Date of Service: 01/15/1999 Report No.: 9902254 Report Date 03/15/1999 Client No.: 08644025 Project No.: 43-2333-98 Client: The Beck Group Project: GTE Shared Services Attn: Gillett Berger 1700 Pacific Ave., Suite 3800 Coppell Road & Corporate Drive Dallas TX 75201-4619 Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. PROJECT DATA co~cno, c~o~: BECK CONCm~mm~ c~ss: 8205 CONCRETE SUPPLIER: TXI P~C~Dn~: 01/15/1999 BATCHT~: 5:40am P~: 41 T~ SAILED: 6:20~ BY: Mike ~om 5PEC~ICA~ON ~QUI~E~ ~RCO~mONS: Fair s~a~: 4~ psi ~ 28 Days ~E~ (~ - AIR 34 r CO~C~: 57 ~: 6.0" M~ ~UC~O: 8~ ~C~ nO: 1215633 Am: 3-6% Am CO~ (~): 4.8 U~ ~m~ (~: N/A ~ M~lOO: ASTM C- 143 r~c~ LOCATION: S~ page I ASTM C-172 ASTM C-39 SABLE ~CATION: See ~low REPORT OF TESTS Ac w. YARDS: 440 CYL .R S .ASV D COM a ssr MARKED SL~P DA~ AGE LOAD S~G~ F~ S~ NO. (~c~) ~ (da~) (i~ f~ce) (~i) ~E 3 1 5.~ 01~1999 7 123350 43~ 3 2 5.~ 01/2~ 1999 7 118730 42~ Avenge 4280 3 3 5.~ 0~ 1 ~ 1999 28 1 ~280 51 ~ 3 4 5.~ 0~I~1999 28 150670 5330 Avenge 5220 3 5 5.~ 03/1~1~9 56 158310 56~ S~p~e location: Between 7~h and 8~h bul~ noz~ northward from aou~h end This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, lac. 0ILL Page 3 of 4 CONCRETE COMPRESSIVE STRENGTH TEST 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Date of Service: 01/15/1999 Report No.: 9902254 Report Date 03/15/1999 Client No.: 08644025 Project No.: 43-2333-98 Client: The Beck Group Project: GTE Shared Services Attn: Gillett Berger Coppell Road & Corporate Drive 1700 Pacific Ave., Suite 3800 Dallas TX 75201-4619 Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. PROJECT DATA CONTRACTOR: BECK CONCR~rE CLASS: 8205 CONCRETE SUPPLIER: TXI PLACEMENT DATE: 01/15/1999 BATCHTIME: N/A PLANT: 41 TIME SAMPLED: 7:25am BY: Mike Odom SPECIFICATION REQUIREMENTS WF. ATtIER CONDmONS: Fair STRENaTa: 4000 psi @ 28 Days T~-M~'r-RATVRE (n-AIR 34 F CONCRETe.: 55 F SLVMP: 6.0" Max TRUCK NO: 450 T~CK~r NO: 1215718 AIR: 3-6% Am co~r~rr (~): N/A u~rr WEIGHT (pc0: N/A T~T M~'rHOO: ASTM C- 143 PLACEMENT LOCATION: ASTM C-172 see ~ege ~ ASTM C-39 SAMPLE LOCATION: See below REPORT OF TESTS ACC X E YA S: CYLINDER MEASURED MAX~gUM COMP~IVE MARKED SLUMP DATE AGE LOAD STRENGTH FRACTURE SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE 4 I 5.75 01/22/1999 7 91170 3220 4 2 5.75 01/22/1999 7 89680 3170 Average 3200 4 3 5.75 02/12/1999 28 167710 5930 4 4 5.75 02/12/1999 28 163110 5770 Average 5850 4 5 5.75 03/12/1999 56 175920 6220 Five (5) ga~.lons of water added. Technician: Mike Odom Started: 2:00am Finished: 8:30am I--~ Engin~~nc. Report Distribution: (!) The B~ck Group (I) Thc Beck Group (I) Gromatzky Dupree & Assoc. (I) Dalcan, Inc. Eugen (I) Brockette Davis Drake, Inc. (I) HBC Engineering/Eugene Harbo~r Vice President (1) The Beck Group This repo~ is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. 0ILL Page 4 of 4