Loading...
Valley Ranch SS-CS 940211 ~-/ /~¥-~,"'~-r--'"/~---.--~'~-----~----~ ~---~ L--','. P.O. Box 478 '~'1 I~-" ~ ~ I~--I~-----I~! ( Coppell. Texas 75019 The City With A Beautiful Future 214-462-0022 February 11, 1994 ' Mr. Mark Roberts Brockett, Davis and Drake Inc. 3535 Travis Suite 100 Dallas, Texas 75204 RE: Valley Ranch Self Storage Development Fee Assessment Dear Mr. Roberts: Enclosed is a copy of the City of Coppell Development Fee Assessment list, along with a copy of the Development Fee Calculations for Valley Ranch Self Storage. Please provide a check made payable to the City of Coppell in the amount of $5,975.00 and forward it to Mr. Alan Johnson, Acting Finance Director, along with a copy of the Fee Assessment List. Please provide our office a copy of the Engineer's Estimate or contract for this project so the construction inspection fee can be verified. By providing a copy of your paid receipt to our office, it will help us to verify payment of the required fees and insure a successful beginning of this project. We look forward to working with you on this project. If you have any questions, please do not hesitate to contact me. Sincerely, Kenneth M. Griffin, P.E. City Engineer cc: Steve Goram, Director of Public Works Alan Johnson, Acting Finance Director Greg Jones, Building Official Doug Stevens, Engineering Technician CITY OF COPPELL DEVELOPMENT FEES Date: February 11, 1994 Project: Valley Ranch Self Storage TOTAL AMOUNT DUE ASSESSMEN'F PRIOR TO COUNCIL APPROVAL Water Impact Fee $5,525.00 $5,525.00 (100% due prior to Council Approval) Water Tap Inspection Fee $300.00 -0- (100%due at Issuance of Building Permit) Wastewater Impact Fee $450.00 $450.00 (100% due prior to Council Approval) Sewer Tap Inspection Fee 4}- 4}- (100%due at Issuance of Building Permit) Utility Final Inspection Fee $50.00 4}- (100%due at Issuance of Building Permit) Water Meter Fee (Lots) $22.25 -0- (100% due at Issuance of Building Permit) Water Meter Fee (Irrigation & Fire) $1,689.17 -0- (100% due at Issuance of Water Meters) Water Meter Deposit $105.00 4}- (100%due at Issuance of Building Permit) Irrigation Meter Deposit 4}- 4}- (100%due at Issuance of Water Meters) Street Sign Fee 4}- -0- (100%due prior to Acceptance of Project) Street Light Fee * -0- (100%due prior to Acceptance of Project) Park Fee -0- -0- (50% due prior to Council Approval) (50%due prior to Issuance of Building Permit) TOTAL $8,141.42 TOTAL AMOUNT DUE PRIOR TO $5,975.00 COUNCIL APPROVAL + Construction Inspection Fee (2 % of Project Cost due prior to preconstruction meeting) * This fee cannot be assessed until after TU Electric submits the lighting plan for the proposed project. Once the plan is submitted, $292.60 per light will be assessed. ~ - 9 ~ co~ ~.~xc MEMORANDUH DATE: December 29, 1993 TO: Ken Gr~ffin, P.E., C£ty Engineer-' FROH: Howard L. Pafford, Utilities Superintendent ~.~ ~: Development Fe~s for Valley Rancy Self Storago The following fees should be assesm~d on the ~bove referenced p~o3 ect . Water Impaot Fee; ..I - .. 5~8" x 3/4" Domestic Meter/$ = 1 E$U's 1... - I i/S"._ Irrigation Meter/s -- 5 ESU's 1 - ..q~' .. Firolin~ Meter/s ~ _ ... 2.5 ESU's Total _~$ ESU's ~ $650.00 100% due prior to Counoil approval of final plat. wast~water Impa~t i - ....5~.". x 3/4" Domestic Meter/s = 1 ESU's Total 1 ESU's @ $450.00 ea = ~450.00 100% due prior ~0 Council approval of the final plat, Water Tap Inspection F~ _t_ Connections @ $100.00 each = $ 300.00 100% due prior to issuance of building permit. (0±' in the case of the irrigation meter-prior to issuance of meter). Utility Final Inspection .. ~ ~ot/s ~ Sao.oo ~ $5o.oo 100% due prior issuance of buildlng permit. 0~709/94 10~17 00~ D~velopme~t Page 2 Water Neter Fee (Domestic) 1 - 5/8" X 3/4" Domestic Meter ~ $22.25 ~.. ~ $22.25 Total = $ 22..25 100% due prior to issuance of'b~ilding permit. Water Meter Fee (Irrigation & Fire/ & - i 1/2" Irrigation Meter/s ~ $~..OO sa = $I57.00 _~ - 6" Fireline meter/s ~ ~532.17 ea = Total ..$1~689.17 100% due prior to issuunce of water meters. Water ~eter Deposi~ 3 m~ters ~ $3~,00 ~a = SLO5.OO 100% du~ prior to issuanc~ of building permit. If you ;]ave any questions regarding this assessment please advise. HLP/dm ~c: Steve;] G. Goram, Director of PubLic Works FSES/VALSTORE