Loading...
Valley R Plaza A-CS 961121 " ..... --~-~ Box 478 .~:--...,'-? _ _==~,,- .~5 :.~ _-:-~-u, =-'"= -' Cop;:)ell. Texas 75019 ....... The City With A Beautiful Future 21a-462-0022 November 21, 1996 Verlin Woods McDonalds Corporation 511 E. Carpenter Frwy., Suite 375 Irving, TX 75062 RE: Valley Ranch Plaza, Tract A (McDonalds) Development Fee Assessment Dear Mr Woods Enclosed is a copy of the City of Coppell Development Fee Assessment table, along with a copy' of the Development Fee calculations for the referenced development. Please make payment to the City of Coppell in the amount of $8.728.76 and forward to the Finance Department along with a copy of the Fee Assessment table. This amount is a portion of the assessed fees which need to be paid prior to Council approval. Please refer to attached table for additional fees. Also provide a copy of the Engineer's estimate or contract to our office so the construction inspection fee can be verified. Providing a cop3' of 3'our paid receipt to the Engineering Department ,,*,'ill help us to verify the payment of required fees and insure a successful beginning of this project. We look forward to working with you on this project. If y.,ou have any questions, please contact me. Sincerely. - Kenneth MTGriffih. P.E. Assistant City Manager..City Engineer cc: Jennifer Armstrong. Finance Director Doug Stevens. Engineering Technician Matt Cast. Supt. of Public Services Greg Jones. Chief Building Official Gary Sims. Dir. Leisure Services DEVELOPMENT FEE TABLE Project: Valley Ranch Plaza, Tract A (McDonalds) Date: 11/21/96 TOTAL AMOUNT DUE FEES DUE PRIOR TO COUNCIL APPROVAL Water Impact Fee $5,625.00 $5,625.00 (100% due prior to Council Approval) Water Tap Inspection Fee S150.00 (100% due at Issuance of Water Meter) Water Meter Fee (Domestic) $134.93 (100% due at Issuance of Water Meter) Water Meter Fee (Irrigation/Fireline) $2,715.83 (100% due at Issuance of Water Meter) Water Meter Deposit (Domestic) $30.00 (100% due at Issuance of Water Meter) Irrigation/Fireline Meter Deposit S70.00 (100% due at Issuance of Water Meter) Wastewater Impact Fee $2,250.00 $2.250.00 (100% due prior to Council Approval) Wastewater Tap Inspection Fee $50.00 (100% due at Issuance of Building Permit) Utility Final Inspection Fee $50.00 (100% due at Issuance of Building Permit) Park Fee $0.00 S0.00 (100% due prior to Council Approval) Roadway Impact Fee S853.76 $853.76 (100% due prior to Council Approval) Street Light Fee Information not (100% due prior to Acceptance of Project available at this time Street Sign Fee Information not (100% due prior to Acceptance of Project available at this time Construction Inspection Fee Need submittal of development contracts TOTAL S11,929.52 TOTAL AMOL.~T DUE PRIOR TO COL~'CIL APPROVAL $8,728.76 DEVELOPMENT FEE WORKSHEET PROJECT: Valley Ranch Plaza, Tract A (McDonalds) DATE: 11/21/96 Water Impact Fee: Domestic Meter(s): 1 - 1 1/2 inch = 5 ESU's Irrigation Meter(s): 1 - 1 1/2 inch = 5 ESU's = ESU's Fireline Meter(s): 1 - 8 inch = 2.5 ESU's Total#: 12.5 ESU's @ $450.00 ea. $5,625.00 (100% due prior to Council approval of the final plat) Water Tap Inspection Fee: Total #: 3 Connections @ $50.O0 ea. $150.00 (Single family due prior to issuance of building permit) (All other developments due prior to issuance of meter) Water Meter Fee (Domestic): Total #: 1 Domestic Meter(s) @ $134.93 $134.93 (Single family due prior to issuance of building permit) (All other developments due prior to issuance of meter) Water Meter Fee (Irrigation/Fireline): Total #: 1 Irrigation Meter(s) @ $134.93 $134.93 Total #: 0 Additional Irrigation Meter(s) @ $0.00 Total #: I Fireline Meter(s) @ $2,580.90 $2,580.90 (100% due prior to issuance of water meters) Water Meter Deposit Fee (Domestic): Total #: 1 Meter(s) @ $30.00 ea. 030.00 (100% due prior to issuance of water meters) Irrigation/Fire Meter Deposit Fee: lotal #: 2 Meter(s) @ $35.00 ea. $70.00 (100% due prior to issuance of water meters) Wastewater Impact Fee: Total Domestic Meters ESU' 5 @ $450.00 ea. $2.250.OO Wastewater Tap Inspection Fee: Total #: 1 Connections @ $50.00 ea. $50.00 (100% due prior to issuance of building permit) Utility Final Inspection Fee (All developments): Total #: 1 Lots @ $50.00 ea. $50.00 (100% due prior to issuance of building permit) Page 1 bEVELOPMENT FEE WORKSHEET Park Fee (For Resdential Developments Only): * Preliminary plat approved prior to June 23, 1992: N/A Single-family @ $150.00 / Lot N/A N/A Multi-family @ $75.00 / Unit N/A (50% paid prior to Council approval of final plat) (50% paid at issuance of building permit) * Preliminary plat approved after June 23, 1992: N/A Single-family @ $350.00 / Lot N/A N/A Multi-family @ $350.00 / Unit N;A (50% paid prior to Council approval of final plat) (50% paid at issuance of building permit) * Preliminary plat approved after October 26, 1993: N/A Single-family @ $1285.00 / Lot N/A N/A Multi-family @ $1285.00 / Unit N.,'A (100% paid prior to Council approval of final plat) Roadway Impact Fee: (See attached fee calculations) $853.76 Street Lighting Fees: Intbrlnation not Assessed for lighting in the City's right-of-way, available at this time This fee cannot be assessed until after T.U. Electric submits the lighting plan for the proposed development. Once the plans are submitted, $292.60 per light will be assessed. (100% due prior to final acceptance of development) Street Sign Fees: Information ,tot Assessed for signage in the City's right-of-way, available at this time (See attached fee calculations if applicable) Construction Inspection Fees: Need submittal of A copy of the development contract must be submitte0 for assessment, development contracts The contracts should indicate the cost to construct the improvements that are inspected by the Engineering Department. (2% of development cost required for private improvements) (4% of development cost required for public improvements) Page 2 ROADWAY IMPACT FEE CALCULA'£IONS PROJECT: Valley Ranch Plaza, Tract A (McDonalds) DATE: 11/21/96 ROADWAY IMPACT FEE: Service Area * 8 iCategory ** Commercial Land Use ** Fast Food Restaurant Building Size (Sq. Ft.') 3,213 Development Units ** 3.213 Vehicle Miles per Development Unit ** [ 3.64 Fee per Vehicle Mile *** [ S73 Roadway Impact Fee due = (Development Units) x (Vehicle Miles per Development Unit) x (Fee per Vehicle Mile) = $853.76 * (Figure 2 - Roadway Impact Fee Stud>') ** (Table 3 - Roadway Impact Fee Study) *** (Schedule 2, Page 3 - Roadway Impact Fee Study'l