Loading...
Villages C P1-CS 860814GINN, INC. CONSULTING ENGINEERS August 14, 1986 Mr. Mark Kurtz Dimension/Brooks 1700 Pacific Ave., Suite 4500 Dallas, TX 75201 RE: Villages of Coppell - Phase I - Final Acceptance Dear Mr. Kurtz: A final inspection of the above referenced project has been confirmed by representatives of Ginn, Inc., M.U.D. #1, and the City of Coppell. Paving and utilities have been verified and are in compliance with the City of Coppell standard requirements. On behalf of the City of Coppell, acknowledgement of acceptance and release for permits to begin construction of home building is effective as of this date. Commitments to the Streetscape-Landscape Ordinances should be addressed within the phase of home building. The one year maintenance bonds and as-built drawings have been received from both contractors. Maturity on the bonds will be one-year from the date of the letter (8-14-87). Sincerely,/3 Randy Flemi~ RF/km cc: Ed Powell, P.E. Wayne Ginn, P.E. Janet Vick, P.E. - NDMCE Jeff Hawkins - Pierce Lunsford Steve Goram / Dale Jackson/ Per Birdsall Carl Bass Contractors Utility: Jaho, Inc. - Truman Moffit - Howard Cordell 10538 Beaumont Hwy. Houston, TX 77078 394-8641 Howard Cordell Mobil Telephone 306-1818 Direct line to Houston office Paving: R.S. Ross Concrete/Uvalde Paving Co. 4222 Rosehill Rd. #12 Garland, TX 75043 Randy Ross 214-240-8511