Villages C P1-CS 910417 CITY OF COPPELL
PRE-CONSTRUCTION CONFERENCE
PRO . T Village of Coppell
DATE-. 4-17-91
TIME: /,' -~ ~
I. A~~E: ( See Attached List )
II. PLUS ~IS~D ~: A) CI~ ~S
B) CONCUR Y~
C ) ~R ES
III. ~ILI~ C~IES N~IFIED:
A) ELEPHOE
B) ~
C ) ~E~IC
D~ C~m~ T.V.
E) ~R
IV. STA~S OF RIP.F-WAY ~D/OR L~ ~~S:
HI~Y P~T ~S
S~ C~ PE~IT ~S
~RING PE~IT ~S
V. INSPECTI~:
~D~LY INSPECTION BY ~SIG~D I~SPEC~R
B. ~R HO~ ~D ~~ (O~RTI~) ~
BE P~D BY ~ CO~~R "~T O~I~
~".
BE~ ~R/S~IT~Y S~R/S~ S~R/
P~VI~ CONSTR~TIO~ BEGINS.
(2)
VI. TESTING OF MATERIALS:
1. DENSITIES
t~.. APPROVED CONCRETE BATCH DESIGN
3. CONCRETE PAVING INCLUDING CORES
4. APPROVED ASPHALT BATCH DESIGN
SEND ONE COPY OF THE TEST REPORTS TO THE INSPECTOR
VII. STREET CLOSING REQUIRED: YES NO
IF YES, CONTRACTOR TO NOTIFY THE CITY, POLICE
AND FIRE DEPARTMENT SEVENTY-TWO (72) HOURS IN
ADVANCE.
VIII. CONSTRUCTION BARRICADES AND TRAFFIC CONTROL:
A. REQUIRED YES NO
B. TRAFFIC DETOUR YES NO
C. WARNING LIGHTS YES NO
IF STREET DEPARTMENT HAS TO COME OUT TO MOVE
THE BARRICADES AND/OR REPLACE ANY BARRICADES,
THE CONTRACTOR WILL BE CHARGED FOR THEIR TIME.
IX. AS-BUILT PLANS:
CONTRACTOR AND/OR ENGINEER WILL BE RESPONSIBLE FOR
SUBMITTING THE CORRECT "AS-BUILT" PLANS TO THE CITY.
X. INFORMATION:
DEVELOPER:
NAME:
ADDRESS:
PHONE:
PROJECT MANAGER:
CONSULTING ENGINEER:
NAME:
ADDRESS:
PHONE:
PROJECT ENGINEER:
(3)