Loading...
Villages C P1-CS 910417 CITY OF COPPELL PRE-CONSTRUCTION CONFERENCE PRO . T Village of Coppell DATE-. 4-17-91 TIME: /,' -~ ~ I. A~~E: ( See Attached List ) II. PLUS ~IS~D ~: A) CI~ ~S B) CONCUR Y~ C ) ~R ES III. ~ILI~ C~IES N~IFIED: A) ELEPHOE B) ~ C ) ~E~IC D~ C~m~ T.V. E) ~R IV. STA~S OF RIP.F-WAY ~D/OR L~ ~~S: HI~Y P~T ~S S~ C~ PE~IT ~S ~RING PE~IT ~S V. INSPECTI~: ~D~LY INSPECTION BY ~SIG~D I~SPEC~R B. ~R HO~ ~D ~~ (O~RTI~) ~ BE P~D BY ~ CO~~R "~T O~I~ ~". BE~ ~R/S~IT~Y S~R/S~ S~R/ P~VI~ CONSTR~TIO~ BEGINS. (2) VI. TESTING OF MATERIALS: 1. DENSITIES t~.. APPROVED CONCRETE BATCH DESIGN 3. CONCRETE PAVING INCLUDING CORES 4. APPROVED ASPHALT BATCH DESIGN SEND ONE COPY OF THE TEST REPORTS TO THE INSPECTOR VII. STREET CLOSING REQUIRED: YES NO IF YES, CONTRACTOR TO NOTIFY THE CITY, POLICE AND FIRE DEPARTMENT SEVENTY-TWO (72) HOURS IN ADVANCE. VIII. CONSTRUCTION BARRICADES AND TRAFFIC CONTROL: A. REQUIRED YES NO B. TRAFFIC DETOUR YES NO C. WARNING LIGHTS YES NO IF STREET DEPARTMENT HAS TO COME OUT TO MOVE THE BARRICADES AND/OR REPLACE ANY BARRICADES, THE CONTRACTOR WILL BE CHARGED FOR THEIR TIME. IX. AS-BUILT PLANS: CONTRACTOR AND/OR ENGINEER WILL BE RESPONSIBLE FOR SUBMITTING THE CORRECT "AS-BUILT" PLANS TO THE CITY. X. INFORMATION: DEVELOPER: NAME: ADDRESS: PHONE: PROJECT MANAGER: CONSULTING ENGINEER: NAME: ADDRESS: PHONE: PROJECT ENGINEER: (3)