Villages of CC 4-CS 930409LINDA SEWELL
April 9, 1993
THE NELSON CORPORATION
PLANNING · ENGINEERING · SURVEYING
LANDSCAPE ARCHITECTURE · CONSTRUCTION MANAGEMENT
5999 SUMMERSIDE DRIVE * SUITE 202
DALLAS, TEXAS 75252
(214) 580-2605
FAX (214) 380-2609
BRIAN MARCUS, P.E., R.P.LS.
CRAIG T. CURRY
Mr. Kenneth M. Griffin, P.E.
City Engineer
CITY OF CoPP~l~
255 Parkway Boulevard
P.O. Box 478
Coppell, Texas 75019
FILL~
VILLAGE AT Co'IrONWOOD CI~iZEK
S~-rnON IV
COPPELL~ TEXAS
NC~92005
Dear Mr. Griffin:
Please find enclosed the items required for a fill permit for said project above.
Application for permit signed by Owner.
Check in the amount of $210.00 (2% of contract).
Four drainage area drawings showing area to be borrowed (shaded area). This
borrow dirt will be used in parkways, alleys and pads, where necessary, so pads
will drain.
Contractor: Rodman Excavation, Inc., 214-3354510, beeper 249-4510.
Please let me know if I can be of further assistance in expediting this matter.
Sincerely,
THE NELSON CORPORATION
Construction Administrator
NRO/ko