Loading...
Villages of CC 4-CS 930409LINDA SEWELL April 9, 1993 THE NELSON CORPORATION PLANNING · ENGINEERING · SURVEYING LANDSCAPE ARCHITECTURE · CONSTRUCTION MANAGEMENT 5999 SUMMERSIDE DRIVE * SUITE 202 DALLAS, TEXAS 75252 (214) 580-2605 FAX (214) 380-2609 BRIAN MARCUS, P.E., R.P.LS. CRAIG T. CURRY Mr. Kenneth M. Griffin, P.E. City Engineer CITY OF CoPP~l~ 255 Parkway Boulevard P.O. Box 478 Coppell, Texas 75019 FILL~ VILLAGE AT Co'IrONWOOD CI~iZEK S~-rnON IV COPPELL~ TEXAS NC~92005 Dear Mr. Griffin: Please find enclosed the items required for a fill permit for said project above. Application for permit signed by Owner. Check in the amount of $210.00 (2% of contract). Four drainage area drawings showing area to be borrowed (shaded area). This borrow dirt will be used in parkways, alleys and pads, where necessary, so pads will drain. Contractor: Rodman Excavation, Inc., 214-3354510, beeper 249-4510. Please let me know if I can be of further assistance in expediting this matter. Sincerely, THE NELSON CORPORATION Construction Administrator NRO/ko