ST9801-CS000925SEP-25-2000 10:55
F.I~EESE ,, NICHOLS
FAX TRANSMITTAL SKEET
A~aaon
CoEs=uction Mana~ment
Drainage
Electrie, al Ert~neering
Eavironmencal Scienc:
Roo4 M:magement
Fa.x No.:
From: ,,~,fv I~_:.,?~d~J
Total number of pages, including u'a.nsrmt~l sheet:
L.."~e--s & Canals
Mechanical E.-i~neL"ing
Pipeline Desi~
Plumbin=, Desi~ '
Chax~e: e~ ¶lqq'l ~. I
Pump 5tation DesiFz
Streets & F,j~ways
Taecummunic=ions
UtLl2des
Solid W~te F~ilities
Wa~er Rt,~'ou,--ce plu.uumg'
W=et Transmission Systcms
War~r/Wu~war.~r EaEmeering
lZ th~r= is a problem rcc,.-iving any
pte::u,~ cab 2 14.920.2500.
SE~-~5-~000
FN I DALLAS
P.02/05
FREESE - NICHOLS
Simon W. Freese, P,E.
~,L-tin C. Nlct~ob,
1900-19~0
119~-19~9
Memorandum
TO:
PROM:
SUBJECT:
Larry Davis
jcott Maughn, B.I.T.
Ed Bell Monthly Estimate
DATE:
September 25, 2000
Copy to:
I have reviewed the estimate by Ed Bell for the month of August, and have looked at all quantity
changes. The questions or concerns I have are as follows: ~ J~~./
Item #12 - They show sy of new 8" re~ ~' nc. pa wing. According to the sketch you sent
me, approximately 130 lrofro cracking. If this is the entire width of roadway, this comes
to approximately 5 eld out for payment. If only half of the road was poured,
then the, q . 'f this a~'ees with your
,,f'calculations.
V~tem~ & ~21 - I calculated the asphalt transition at Sandy Lake gd., and 15B is about 50 sy over
that quarttit),. If they d/d an asphalt detour near the box culvert during the time of this est/mate, then
that would account for the ~5~0_! sy of additional asphalt paving. Please verify the extra 50 sy I
5alculated.
~,m~48 - EB charged for 2.5 inlets for the month. They are still lacking 1.5 inlets from their bid
quantity. All the inlets should be pout~, with the exception of the east side of the madway that has
Chart e rder#1 ~P ti ~
#3. WheLe was this add: -rap used? Please verify.
g - I just anted to mention, ifpa nt quantity is held out for cracked sections,
shot~dn t cement stnbthzatmn should also be held o st wanted to clarify this and I wasn't clear
~en Griffin p y~~e~.
on how iliann~ to quantify his pa
FREESE AND NICHOLS · 1701 N. MARKET $TREBT, SUITE ~ B 51 · DA~S. ~S 752~-2~1
~HONE: 21~ · F~: 21~2565
FN I DALLAS
Momorandum to
~eptember 25, 2000
I have incluck~d my notes from the monthly billing s|atement for your review.
billing quantifies for the month. Please let me know if you have any questions.
Thanks
P.03/05
It shows all new
PRBP.~iE .4/41) NICHOLS $1701 N. I~tARKBT STRFt'T.
~O~: 21~9~ s F~: 214-92~2565
SEP-25-2000 10:56 FNI DALLAS
04/05
LOCATION:
P.~SCT.O: ('PC ~¢q'"/~/. I s. EET oF
, , , : '-
............. I..
, ~ ,
I
1
KEYSTONE RETAINING WALL SYSTEMS, INC. · 4444 WEST 78TH STREET - MINNEAPOLIS. MN 55435 · 612-897-1040
SEP-25-2000 10: 56
i .
FNI DALLAS
P.05/05
PROJECT;
PROJECT
SHEL~I·
OF
LOCATION:
BY;
DATE:
-I
KEYSTONE RETAINING WALL SYSTEMS, INC. · 4444 WEST 78TH STREET. MINNEAPOLIS. MN 55435 · 612-897~1040
TOTAL P. 05