Loading...
Villages C P2-CS 860430 PIERCE-LUNSFORD ASS IATES, INC. CONSULTING ENGINEEI~IS Ref. 515348.10 CF PC5186 Project: Villages of Coppell - Phase Two Contractor: Dalcon Services, Inc. Owner: Coppell M.U.D. No. 1 Developer: Dimension/Brooks Date: April 30, 1986 Time: 1:30 Discussion: A Preconstruction Conference was held with the following participants: Jeff Hawkins Pierce-Lunsford Associates (M.U.D.) Rodney Bowen Pierce-Lunsford Associates (M.U.D.) Mark Kurtz Dimension/Brooks Don Kennedy Dural & Associates (Lab Testing) Gall Nichols Nathen D. Maier Bob Lenz Dalcon Services Melvin Moore Dalcon Services The following items were discussed: 1. Earthwork and site grading contractor is scheduled to move on site and cut streets and R.O.W. to grade this week. Notice to Proceed should be issued to Dalcon Wednesday, May 7 to begin utilities contingent on weather and earthwork contractor's progress. 2. Dalcon expects to move two crews on site and begin to place storm sewer Line "A" and sanitary sewer lines. Work schedule will be 10 hour days, 5 or 6 days per week depending on weather conditions. 3. Contractor requested 10' off-sets on all mainline construction staking. 4" sanitary sewer services will be staked at center of lot and water services placed 10' upstream from sanitary services in relation to sewer main flow. Nathen Maier requires 24 hours notice of any staking needed. 4. Contractor was warned to keep 3/4" water services minimum 3' below top/curb elevation and also keep plenty of cover behind curb to avoid conflict with soil stabilization and paving operations. 5. 95% soil compaction required under existing and proposed streets and 90% outside paving at maximum + 3%, - 2% deviation from optimum moisture content. Contractor will use HYster roller compaction equipment. Duval will take frequent soil compaction tests on various lifts for trench backfill to start off and adjust frequency according to results. Contractor will keep backfill and compaction of trenches up close behind placement of utilities. Contractor will coordinate with Rodney Bowen and Duval as to when backfill will be ready for compaction tests. 3109 CARLISLE. SUITE 206 3901 W. PIONEER PARKWAY, SUITE 100 DALLAS, TEXAS 75204 ARLINGTON, TEXAS 76013 (214) 871-2126 (817) 461-5868 Metro 6. Nathen D. Maier will provide cut sheets for sanitary and storm sewer line staking including elevation of street subgrades prior to utility placement. Contractor is required to return subgrade to within 0.1 of original grade. Excess spoil can be leveled off on adjacent lots as long as adequate drainage is maintained. 7. Minimum 6" of adjustment rings will be placed on all manholes. 8. Water needed for hydrostatic testing of water system is to be obtained through service line from existing fire hydrants, 2" copper line from existing to new water line, or by water truck. Feeder line must have in-line double check valve to prevent contamination. 9. A conference will be held on the site during the first week of construction with City of Coppell officials. A weekly meeting will be held each Wednesday on site at 10:00 a.m. to coordinate scheduling, discuss any problems and check status of project. 10. A final walk through of utilities will be made by City of Coppell, GINN, Inc. (consulting engineer for City), developer and Coppell M.U.D. representatives to insure mutual acceptance by all parties. All comments or inquiries concerning construction practice or workmanship during progress from these parties should be directed through M.U.D. inspector. 11. Plans stamped by the City of Coppell as "Approved for Construction" must be received before contractor moves on the job site. One set will be Given to the contractor and two to Pierce-Lunsford. 12. Contractor was Given two sets of utility plans and requested one additional set plus City approved set. Nathen D. Maier will also furnish two sets of paving plans to contractor. 13. Pay estimates will be submitted on forms provided by Coppell M.U.D. The cut off date for work completed will be the 15th of the month. Quantities completed will be agreed upon by the M.U.D. inspector and construction foreman who are to sign the form and have it to Pierce-Lunsford no later than the 18th. Payment to the contractor will be recommended to Coppell M.U.D. Board of Directors at the followinG month's meeting, usually the second Tuesday of the month. 14. Manholes and curb inlets will be cast-in-place. 50% of inlets will be placed prior to street paving with plywood placed in inlets to keep dirt out of storm sewers. 2 of 3 15. It was agreed contractor can proceed with extra work on a verbal approval if contractor was explicitly told the scope of work to be done and agreement was reached on the cost and time to complete work. Verbal authorizations will be followed up by written change order. 16. Dalcon is responsible to place concrete footings around special headwalls; existing millsap stone wall is to be saved and replaced by others. 17. 8" water line is to be PVC SDR 14 with 42" minimum burial and sand embedment. 10" water line can be SDR 14 or SDR 18 but must have 60" burial and sand bedding. 18. City of Coppell currently has right to require T.V. inspection of sanitary sewer lines after placement if there is any reason to question the quality or workmanship of any line with cost borne by the contractor. It was noted that the city is in the process of enacting criteria for mandatory T.V. inspection of all sanitary sewer lines and it may be made retroactive during the execution of this contract. 19. Contractor must furnish as-built plans following construction with all changes indicated and showing distance ties from fixed objects (manholes, valves, fire hydrants) to all water and sanitary sewer services. Service lines will be flagged with marking tape and 2x4's before paving contractor moves on site. 20. A walk-through of project will be made with Coppell M.U.D. and paving and utility contractors to note condition of utilities before paver moves on site. Telephone numbers of all parties receiving a copy of the minutes are as follOws: cc: Pierce-Lunsford (2) 214/871-2126 Dimension/Brooks 214/922-0155 Dalcon Services (2) 214/358-7600 DuVal & Associates 214/248-0501 Nathen D. Maier (2) 214/739-4741 (Janet Vick or Gai~l Nichols) GINN, Inc. 214/386-6611 (Randy Fleming) City of Coppell 214/462-9010 (Steve Goram or Carl Bass) 3 of 3