Loading...
Villages C P2-CS 860822NATHAN D. MAIER August 22, 1986 Mr. Jeff Hawkins Plerce-Lunsford 3109 Carlisle Suite 206 Dallas, TX 75204 Re: Villages of Coppell, Phase II NDM No.: 84-10-054 Dear Jeff: Random inspections of the above referenced project have found: (1) no foreman on the job; (2) backfilling trench with on-site material instead of sand; (3) backfilling In three-foot lifts with no soil technician being present or contacting the testing lab for test; (4) laborers installing water services improperly. For the reasons stated above, we feel that closer inspection of the above refernced project is required. The completion of the project will be delayed due to the lack of supervision. If you have any questions, please do not hesitate to call. Sincerely, NATHAN D. MAIER CONSULTING ENGINEERS, INC. JPV/rdp cc: Bob Hawksley, Dimension-Brooks. Mark Kurtz, Dimension-Brooks Bob Lenz -Dalcon Services Randy Fleming -Olnn, Ine. Gale Nichols, NDMCE Three NoZth'Park/8800 N. Central Expw¥~/$ulte 300/Dallas, Texas ~5231/(2'14),739-4741,