Loading...
ST9801-CS010104 (3)15:59 CITY~ 972 304 354? COPPELL ~ CITY OF COPPELL ~ NO.151 L%t e'1 MEMORANDUM FROM THE DEPARTMENT OF PUBLIC WORKS To: From: Date: RE: 7. 9. 10. 11. 12. 13. 14. 15. 16. 17. 18. 19. Larry Davis, Construction Inspector Engineering Larry Morton. Sign/Signal/Streets Division Public Works January 4, 2001 Walk-thru Coppell Rd. Project 1/3/01 Seal joints where asphalt meets concrete paving on both ends of Coppell Rd. Cut out and repair bad spots in asphalt marked with white paint. Cut out and repair broken concrete in expansion joints marked white. Rout and seal all random cracks painted white. Level up valve stacks and the boxed out area at them. Repair broken curbs painted white. Replace missing 30mph signs haftway between Eastwick and Minyard on both sides of Coppell Rd. Clean and ~l joints all the way to the top. Seal curb joints. Replace reflector buttons missing from centerline of road. Move Adopt-A-Location signs acre Make sure all signs are in concrete Cut out and replace low area south Fix broken areas where new pavint Storm sewer matthole at Westminsl Clean up concrete spill at The Mare Clean and repair mud ball holes bet Pour concrete pads at traffic signal Install Right Turn Only (30" X 36' post-it'Fax Note 7671 Date 1-4-C)1 IfZg~s>:~/ ~ P CITY OF COPP!fLL ~UBLIC' IVO~K$ DEPiIRTM~NT i' i i' " 01/04/01 15:59 9?2 304 354? CITY.~COPPELL ~ CITY OF COPPELL NO.151 To: From: Date: RE: 4. . 6. 7. 9. 10. 11. 12. 13. 14. 15. 16. 17. 18. 19. MEMORANDUM FROM THE DEPARTMENT OF PUBLIC WORKS Larry Davis, Construction Inspector Engineering Larry Morton, Sign/Signal/Streets Division Public Works January 4, 2001 Walk-thru Coppell Rd. Project 1/3/01 Seal joints where asphalt meets concrete paving on both ends of Coppell Rd. Cut out and repair bad spots in asphalt m___n_rked with white paint. Cut out and repair broken concrete in expamion joints marked white. Rout and seal all random cracks painted white. Level up valve stacks and the boxed out area at them. Repair broken curbs painted white. Replace mi.r, sing 30 mph signs halfway between Eastwick and Minyard on both sides of Coppell Rd. Clean and fill joints all the way to the top. Seal curb joints. Replace reflector buttons mi.~si.E from centerllne of road. Move Adopt-A-Location signs across Coppert ltd. facing south bound. Make sure all signs are in concrete base 2' deep with break-aways. Cut out and replace low area south bound at Parkway painted white. Fix broken areas where new paving meets old paving in all intersection. Storm sewer matthole at Westminster Dr. needs to be boxed in like the other one is. Clean up concrete sp~l at The Mansions. Clean and repair mud bath holes between 90 deg. Turn and Hwy. 121. Pour concrete pads at traffic signal boxes at Parkway Bird. Install Right Turn Only (30" X 36") sign for Parkway. 01/0~/01 12:26 9?2 304 354? CITY~,COPPELL ~ CITY OF COPPELL N0.150 From: MEMORANDUM FROM TIIE DEPARTMENT OF PUBLIC WORKS Laarry Davis, Construction Inspector Engineering Larry Morton, Sign/Signal/Streets Division Public Works January 4, 2001 Walk-thru Coppert Rd. Project 1/3/01 3. 4. 5. 6. 7. 9. 10. 11. 12. 13. 14. 15. 16. 17. 18. Seal joints where asphalt meets concrete paving on both ends of Coppell Rd. Cut out and repair bad spots in asphalt nmrked with white paint, Cut out and repair broken concrete in expansion joints marked white, Rout and seal nil random cracks painted white, Level up valve stacks and the boxed out area at them. Repair broken curbs painted white, Replace mi.~iBg 30mph signs halfway between Eastwick and Mittyard on both sides of Coppell Rd, Clean and fill joints all the way to the top, Seal curb joints, Replace reflector buttons missing from centerline of road, Move Adopt-A-Location signs across Coppell Rd, facing south bound, Make sure nil signs are in concrete base 2' deep with break-aways, Cut out and replace low area south bound nt Parkway painted white, Fix broken areas where new paving meets old paving in all intersection. Storm sewer manhole at Westminster Dr. needs to be boxed in like the other one is. Clean up concrete spill at The Mansions. Clean and repair mud ball holes between 90 deg. Turn and Hwy. 121. Pour concrete pads at traffic signal boxes at Parkway BIrd. ' ' 'T ' Y