Villages of CC 4-CS 920929LINDA SEWELL
SEC..TREAS.
September 29, 1992
THE NELSON CORPORATION
PLANNING · ENGINEERING · SURVEYING
LANDSCAPE ARCHITECTURE · CONSTRUCTION MANAGEMENT
5999 SUMMER~IDE DRIVE · SUITE 202
DALI. AS, TEXAS 75252
(214) 380-2605
FAX (214) 380.2609
P.O. Box 478
Coppell, Texas 75019
RE: Village at Cottonwood Creek
NC#92005
Dear Shohre:
BRIAN MARCUS, P.E., R.P.L.S.
CRAIG T. CURRY
---.- G j.
---.-- G,,.-,} 5.
Per our telephone conversation this morning, I am re-submitting the corrected set of screening
wall and landscape plans for final approval.
Also enclosed are the mark-up sets that were returned to us. All concerns and items identified
in these mark-ups have been addressed.
I am contacting Howard Pafford in the Public Works Department to take care of the impact fees
for the two 1%" water meters, so hopefully this will not delay the schedule.
Shohre, o_ur client would like to begin construction of the wall very soon, therefore your prompt
attention to this matter will be greatly appreciated. As we discussed, hopefully approval can be
granted by no later than next Friday (October 9.).
Thank you for your time and effort in this matter.
Sincerely,
9200~00~A\C\MSSHOHRE.RR