Loading...
Villages of CC 4-CS 920929LINDA SEWELL SEC..TREAS. September 29, 1992 THE NELSON CORPORATION PLANNING · ENGINEERING · SURVEYING LANDSCAPE ARCHITECTURE · CONSTRUCTION MANAGEMENT 5999 SUMMER~IDE DRIVE · SUITE 202 DALI. AS, TEXAS 75252 (214) 380-2605 FAX (214) 380.2609 P.O. Box 478 Coppell, Texas 75019 RE: Village at Cottonwood Creek NC#92005 Dear Shohre: BRIAN MARCUS, P.E., R.P.L.S. CRAIG T. CURRY ---.- G j. ---.-- G,,.-,} 5. Per our telephone conversation this morning, I am re-submitting the corrected set of screening wall and landscape plans for final approval. Also enclosed are the mark-up sets that were returned to us. All concerns and items identified in these mark-ups have been addressed. I am contacting Howard Pafford in the Public Works Department to take care of the impact fees for the two 1%" water meters, so hopefully this will not delay the schedule. Shohre, o_ur client would like to begin construction of the wall very soon, therefore your prompt attention to this matter will be greatly appreciated. As we discussed, hopefully approval can be granted by no later than next Friday (October 9.). Thank you for your time and effort in this matter. Sincerely, 9200~00~A\C\MSSHOHRE.RR