Loading...
Villages of CC 4-CS 920918 (2)MEMO TO: FROM: SUBJECT: DATE: G-reg Jones, Acting Building Official M. Shohre Daneshmand, P.E., Civil Engineer ~~__ Villages of Cottonwood Creek IV Sidewalk Along Minyard Drive September 18, 1992 The final construction development plans for the above referenced project have been approved. The project engineer has requested to delay sidewalk construction along the north side of Minyard Drive adjacent to the side of the following lots, until development of such lots. Lot 1 - Block 'A' Lots 1, 14, 15, 34, 44 - Block ~B' Lots 45, 53, and 68 - Block 'B' This memo is to inform you that we have no problem with this request as long as the sidewalk along subject lots (as noted above) is constructed by the builder(s). If you have any questions, please let me know. KMG/bd CC: Kenneth M. Griffin, P.E. Garreth Campbell, Construction Inspector Dennis Freeman, P.E., Nelson Corp. cotton