Villages of CC 6-LR 950918"Excellence by Experience"
PO Box 92548 · South[eke, Texas 76092
CONSULTING ENGINEERS IN:
nvtron~ent8[ Assessments
Soils & Foundations
Construction #eteria[s Testing
Con~erciat & lndustrie[ Inspection
(817) 329-0281
CONCRETE CYLINDER TEST RESULT8
PROJECT: Villages at Cottonwood Creek LOCATION: Coppell
JOB #: 94-1200 DATE OF BREAK: 09-18-95 DAY: Monday
CLIENT: Jim Sowell Construction Comp CONTRACTOR: Beman Constr.
CYL. SLUMP DATE OF DAYS
I,D, LOCATION (I~.) ~HPLE AG;D POUND~ ~I
Spillway: 69 A S'section, E end
69 B S section, E end
2.75" 09'11-95 7 91,000 3219
2.75" 09-11-95 7 89,500 3166
SPECIFICATIONS: 3000 psi @ 28 days
SUPPLIER: Lattimore
Jamie Holden
Technician