Loading...
Villages of CC 6-LR 950831"Excet Lance by Experience" PO Box 92548 * S~uthtake, Texas 76092 · CO~I4~LTING ENG'rNEERH IN: ;nvfronmeflteL Assessmeflts SoiLs & Fourxbttons Construction HateriaLa Testtr~ Commercial & lndustrtat Inspection (817) DA'fLY CONGTRUCTION REPORT PROJECT: Villages at Cottonwood Creek LOCATION: Coppell JOB ~: 94-1200 DATE: 08-31-95 DAY: Thursday TIME: 3pm-Spm CLIENT: Jim Sowe11 Construction Comp CONTRACTOR: Beman Constr. ACTIVITIES: WEATHER: Clear & Hot LON TEMP: 74F HIGH TEMp: 96F Travelled to job site, as requested, to make four (4) concrete test cylinders. Returned to office. SET #65 LOCATION: Pipe Encasement of Spillway HLUMP: 3.5" AIR: 5.0% TEMP: AT 98/CT 92 TIME: 3:45pm Note: No concrete was poured on 08-30-95; therefore, no test cylinders were made or available for pick-up today. Jeff Holden Technician