h response to your letter on September 5, 2000, I havc arcached a spreadsheet to show how the 3.2
Wns of ducffie iron fittings wcrc calculated for the original base bid. I also included a copy of the
most recent calculations for the fittings tha/were sent to you and/or Mike Martin, a few weeks ago,
for comparison. It is our opinion that this revised fittings list reflects the correct tonage that should
be paid to the contractor.
As for Pay Items Ia-13, 16, 17, 18 and 19, we determined these should not be included in the Pay
Item Ia-7. In the specifications and supplemental conditions, terms such as, "hydrant assembly",
"complete in place", "and provide other fittings, blocking, labor, and incidentals required" supports
our understanding of these items. Also, both Pay Items state that the bid price is considered full
compensation including, "materials, equipment...and incidentals ncccssary to complete the work".
R is standard engineering practice with other municipalities that utilize NCTCOG specifications that
Pay Items Ia-13, 16, 17, 18 and 19 include all ~tth:gs and incidentals necessary to complete these
bid items. In our opinion, fittings and incidentals associated with Pay Items Ia-13, 16, 17, 18 and
19 should not be included in the ductile iron fittings of Pay Item Ia-7. The revised bid quantity for
Pay Item Ia-7 should be 5.3 1 tons.
FRF,,~B Ah'D NICHOLS · 1701 N. MARKIT STREET, SUITE 500 LB 51 · DAIJ_AS, IBXA$ 75202-2(}01
TF]-P-FHONE: 21 4-~2D-2500 · FAX: 214-920-216:~
COPPELL ROAD- WATERLINE FITTINGS
ITEM
12"x6" TEE
12"x8" TEE
12"x 10" TEE
12"x12" TEE
12"x90° HORIZ. BEND
12"x45° HORIZ. BEND
12"x45°VERT. BEND*
12"x8" CROSS
16"x t2" CROSS
8" PLUG
16" PLUG
12"x 10" REDUCER*
12"
6"x90° I'[ORIZ. BEND*
SHORT-
BODY WT BID
QTY. (EA)- LB TOTAL
] 19 ~ tO 2090
] 4 125 500 '
I I 140 140 ~
] I 160 160
] 1 125 125 '
I 5 105 525
I 0 I05 0 '
I 4 385 .... I540 '
I I 685 685 ' ~ '
I 8 45 360 '
I t50 150
0 190 .... 0 ~
0 74 0
0 85 0
I 0 44 0 '
6275 LB.
3.14 TON
BID QUANTITY = 3.2 TON
*NOTE: THESE ITEMS ARE PRIMARILY FOR VERTICAL BENDS AND WERE
MISTAKENLY OMITTED IN THE ORIGINAL BID ITEM QUANTITY
o'1
ffl
I
I
.-,,1
I
rg
I'
'U
COPPELL ROAD - WATERLINE FITTINGS (Revised August, 2000)
sHOa'r-
STD. WT BODY WT
ITEM QTY. (EA) - LB. TOTAL (EA) - LB
12"x6" TBE 21 325 6825 110
12"xS"TEE 4 340 1360 125
12"x10" TEE 1 390 390 140
12"xl2" TEE I 410 410 160
12"x90~ HORIZ. BEND I 255 255 125
] 2"x45e !tORIZ. BEND :5 215 1075 105
12"x45°VERT. BEND 36 215 7740 105
12"x8" CROSS* 4 385 1540 385
16"~12" CROSS* 1 685 685 685
8" PLUG* 7 45 315 45
16' PLUG* , I 150 I50 t50
:I 2"x10" REDUCER* I 190 190 190
12"xI 1.25° HORIZ. BEND I 220 220 74
12" PLUG* I 85 85 85
6"XgQ°HOR1Z. BEND I 85 85 44
TOTALS 21325 LB.
· 10.66 TON
*NO SHORT-BODY FrlTINOS AVAILABLE
23 10
500
140
160
125
525
3780
I540
685
315
150
190
74
44
10623 LB.
5.31 TON
(,n
rn
i
i
I'
:I:)
o3
\
SEP-07-2000 15:48
FN I DALLAS P. 01/04
FAX TRANSM/TTAL SKEET
Fax No.:
Total number of pages, including ~smicml sheet: q
CO[I'LI~erlL~:
problem t~cciv~g any
ple.~c call 2 14.920.2,500.