Loading...
Villages of CC 6-LR 950713,'Excel Lance by r_%,~__,-ience" PO Box 9~)5~8 · South[ake, Texas 76092 · CON~I~LTING ENGINEERS TN: ~vi rommntat Assessments Soils & Foundations Construction Hateriats Testing Coemercia[ & industrial Inspection (817) 32~-0281 FIELD COMPACTION REPORT PROJECT: Villages at Cottonwood Creek JOB #: 94-1200 DATE: 07-13-95 DAY: Thursday CLIENT: Jim Sowell Construction Comp TEST NO, LO~ATION AND LIFT LOCATION: Coppell TIME: 3:00pm CONTRACTOR: Legend W~TER DRY PER- PROCTOR CONT. DEN CENT ~m~ (%) (PCF) COMP Line M, 18" Storm Sewer: 1. @ Station 4+40 2. @ Station 4+40 3. @ Station 4+40 4. @ Station 4+40 5. @ Station 4+40 4th Lift 1 6th Lift 1 9th Lift 1 12th Lift 2 15th Lift I 18.5 100.7 96.2 20.1 99.6 95.2 19.7 103.2 98.6 12.3 105.0 98.0 18.9 101.6 97.1 RBMAR~S: All tests passed. Minimum Compaction Required: 95% PROCTORS: 1. Brn & Tn Sandy Clay 2. Tn & Brn Fine Silty Sand 104.6 PCF @ 17.6% MOISTURE 107.1 PCF @ 10.0% MOISTURE Jeff Holden Technician "Excel Lance by Experience" PO Box 9~548 · Southteke, Texas 76092 CONCRETE CYLINDER TEST REBULTB PROJECT: Villages at Cottonwood Creek LOCATION: Coppell JOB ~: 94-1200 DATE OF BREAK: 07-13-95 DAY: Thursday CLIENT: Jim Sowell Construction Comp CONTR&CTOR: Glenn Thurman In¢ CYL. BLUMP DATB OF DAYB I.D. LOCATION (IN.) BAMPLE AGED' POUNDB Clifton Ct: 53 C @ cul-de-sac 53 D @ cul-de-sac Elbow: 54 C @ Alley C-1 54 D @ Alley C-1 55 C @ Alley C-2 55 D @ Alley C-2 3.75" 06-15-95 28 113,500 4015 3.75" 06-15-95 28 111,500 3944 3.0" 06-15-95 28 114,000 4033 3.0" 06-15-95 28 112,000 3962 3.25" 06-15-95 28 117,000 4139 3.25" 06-15-95 28 115,000 4068 SPECIFICATIONS: 3000 psi @ 28 days SUPPLIER: Glenn Thurman, Inc Brandon McKenzie Technician