Loading...
Verizon-CS 981006BROCKE'I TE· DAVIS' DRAKE, inc. consulting engineers October 6, 1998 Mr. Mike Martin City of Coppell Engineering Department 255 Parkway Boulevard Coppell, Texas 75019 RE: GTE Shared Services BDD Project No. C98260 Dear Mr. Martin: The following pavement section will be used for the above referenced project: APPROACHES 7" 3500 psi concrete reinforced with #3 at 18" o.c.e.w, placed on 6" of compacted flexbase. FIRE LANES 7" 3500 psi concrete reinforced with #3 at 18" o.c.e.w, placed on 6" of scarified and recompacted subgrade. PARKING AREA 5" 4000 psi concrete reinforced with #3 at 18" o.c.e.w, placed on 6" of scarified and recompacted subgrade. If you have any questions please feel free to call. Sincerely, ~iley, P.~BROCKETTE~'~VIS/DRAKE' I1~. Project Manager ~ JAR/ds cc: Gillett Berger, Beck Lonnie Mahoney, Beck Civil & Structural Engineering · Surveying 4144 North Central Expressway, Suite II00 · Dallas, Texas 75204 (214) 824-3647 · Civil/Survey Fax (214) 824-7064 · Structural Fax (214) 824-2586