Loading...
Verizon-PT 981030APPROVAL TO: City of Coppell 255 Parkway Blvd Coppell TX 75019- Attn.- Ken Griffin HwyNo: SH 121 Control: 0364 Section: Maintenance Section: 04 Dallas County Date: 10/30/98 02 The Texas Department of Transportation (TxDOT) offers no objection to the location on the right-of- way of your proposed 12" WATER line as shown by accompanying drawings and notice dated 10/22/98 except as noted below. Your attention is directed to governing laws, especially to Article 6674w-1, Vernon's Annotated Civil Statutes of Texas, pertaining to Control of Access. Access for servicing this installation shall be limited to access via (a) frontage roads where provided, (b) nearby or adjacent public roads or streets, or (c) trails along or near the highway right-of-way lines, connecting only to an intersecting road; from any one or all of which entry may be made to the outer portion of the highway right-of-way for normal service and maintenance operations. The Owner's rights of access to the through-traffic roadways and ramps shall be subject to the same rules and regulations as apply to the general public except, however, if an emergency situation occurs and usual means of access for normal service operations will not permit the immediate action required by the Utility Owner in making emergency repairs as required for the safety and welfare of the public, the Utility Owner shall have a temporary right of access to and from the through-traffic roadways and ramps as necessary to accomplish the required emergency repairs, provided the TxDOT is immediately notified by the Utility Owner when such repairs are initiated and adequate provision is made by the Utility Owner for convenience and safety of highway traffic. It is expressly understood that the TxDOT does not purport, hereby, to grant any right, claim, title, or easement in or upon this highway; and it is further understood that the TxDOT may require the owner to relocate this line, subject to provisions of governing laws, by giving thirty (30) days written notice. You are requested to notify this office prior to commencement of any routine of periodic maintenance which requires pruning of trees within the highway right-of- way, so that we may provide specifications for the extent and methods to govern in trimming, topping, tree balance, type of cuts, painting cuts and clean up. These specifications are intended to preserve our considerable investment in highway planting and beautification, by reducing damage due to trimming. The installation shall not damage any part of the highway and adequate provisions must be made to cause minimum inconvenience to traffic and adjacent property owners. In the event the Owner fails to comply with the requirements as set forth herein, the State may take such action as it deems appropriate to compel compliance. SPECIAL PROVISIONS: * Water & Pressure Sewer Pipelines * Specifications For Backfill * General Utility Specifications * Trench Excav. & Pit Locations * Revegetation Special Provisions: In order to minimize erosion and sedimentation resulting from the proposed installation, the project area will be revegetated * in accordance with TxDOT's Standard Specification Item 164 which specifies the appropriate grass seed mix to be used. All applicants must contact and/or permit with local governments prior to start of construction. Please notify PHIL SIMONS TELEPHONE (940) 387-1324 forty-eight (48) hours prior to starting construction of the line in order that we may have a representative present. PERMIT NO. 19981O30158 By: .~ti/lit~~l~~TeXJ~s'l~epartment of ~ransportation " y P~t Supervisor - Dallas District .GENERAL UTILITY INSTALLATIONS 1. GENERAL - A copy of this permit must.be kept on the jobsite at all times during the utility construction. ×Unless other arrangements are made with the designated Texas Department of Transportation (herein after called TxDOT) Inspector, no work willbeperformed on Saturday, Sunday, Holidays, or hours other than standard working hours. Utility lines shall be located to avoid or minimize the need for adjustments to accommodate future highway improvements. All work (location of utilities, installation and/or future maintenance) will be performed without any cutting of the pavement unless it is specifically stated on'the permit ~hat approval is given to open cut the pavement. No explosives shall be used within the limits of the TxDOT highway right of way for utility installations. 2. COORDINATION OF WORK - Failure to contact the person listed on the approval notice as instructed may cause a delay in the utility work. If the installation is within the limits of an active highway construction project, the utility work must be coordinated with the TxDOT Contractor'and Inspectors. The work by the utility shall not cause any delays to the TxDOT contractor or construction. 3. TRAFFIC SAFETY, BARRICADES, WARNING DEVICES, ETC. - Traffic control and protective devices shall be used and must conform to the TEXAS MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES for streets and highways. Ail Barricades, warning devices, signs, flashers, and flagpersons shall.be provided by the utility agency or contractor. No traffic shall be blocked or. stOpped at any time without the presence of a flagperson. .ClosUre of a lane of traffic for any utility work will not be permitted without the submission of a Traffic Control Plan as part of the approved permit, and is subject to the approval, of Area Engineer or. his designated representative. Vehicles, equipment, dOnstrUcti~n material and personnel not necessary to the timely installation of. t~e facility shall be kept as far as possible from the traveling.public.- ~ny. above ground obstruction or bore pit 10catedc!o~er~than~the Clear zone distances outlined in the "Trench'EXcavation.and Pit LoCatiOns,, specification shall b~ protected by barricades, signs, warning devices metal beam guard 'fence and/or concrete traffic barriers asdeemed necessary by the TxDOT Inspector. At the end' of every construction day, all equipment and materials shall be removed as far from the roadway edge as possible. 4. STAKINO OF UTILITIES - All utility installations shall be staked by the utility agency so that TxDOT may inspect the proposed work prior to actual start of construction. The utility agency is ultimately responsibe for accuracy of the staking and installation. 5. TIME PERIOD ALLOWED FOR INSTALLATION - If the installation of the work covered by this utility permit has not started within six (6) months from the approval date, a written request for an extension must be submitted to the District Office. It is expected that the installation will progress to completion in an efficient manner. However, if the work is delayed or abandoned for a period of one (1) month or more, a written request must be submitted to continue under the authority of the original permit. 6. FULL TIME SUPERVISION AND INSPECTION - The utility agency shall provide competent, full time inspectors or supervisors to be present on-site during the installation. Also, the utility may be required to provide a telephone number which someone may be contacted 24 hours in case of an emergency. The utility construction may be delayed or stopped when it is observed by the TxDOT Inspector that their is not a agency inspector or supervisor present on the job site. 7. DEPARTMENT INTERVENTION - TxDOT has the right to take charge of and to remedy any immediate hazard to the traveling public when it is obvious the utility agency will not do so. Any costs associated with TxDOT's action will be charged to the utility agency. S. UTILITY ACCOMMODATION POLICY - Utility installations within the TxDOT right of way shall conform with the requirements contained in the TxDOT Utility Accommodation Policy, dated May 29, 1989, the Dallas District Utility Policy and the following industry policies. A. Safety Rules for the installation and maintenance of electric supply and communication lines - National Electrical Safety Code. B. Latest edition of the Rules and Requlations for Public Water S s_~, published by the Texas Department of Health, Water Hygiene Division. C. Gas Pipelines - Title 49, C.F.R., Part 192, Transportation of Natural and Other Gas by Pipeline: Minimum Federal Safety Standards and amendments. D. Liquid Petroleum Pipelines - Title 49, C.F.R., Part 195, Transportation of Liquids by'Pipeline~ and amendments. E. Latest edition of the American Society for Testinq and Materials (ASTM) Specifications. F. Latest edition of the AASHTO policy entitled "A pOlicy on the Accommodations of Utilities within Freeway Right of Way." G. Latest edition of the Occupational Safety and Health Administration (OSHA) Standards and Interpretations. 2 TxDOT-D~Ha~ Di~u'i~ C,~c~ral Ufilhy $!u~ 7/IW94 WATER AND SANITARY SEWER INSTALLATIoNs 1. GENERAL - Longitudinal water and sanitary sewer pipelines shall be placed on uniform alignment three (3) to ten (10) feet from the right of way line. The minimum depth of cOver shall be twenty-four (24) inches for non-plastic lines and thirty (30) inches for plastic lines. If a nonmetallic line is installed, a durable metal wire or other device shall be concurrently installed for detection purposes. Each line may be installed with enough vertical flexibility to prevent excessive stresses, however horizontal "snaking,, of the line is prohibited. ' The utility agency shall place identification markers at the right of way line in sufficient number for longitudinal installations and at each highway crossing. Ail paved side streets crossed by a longitudinal line within TxDOT right of way must be installed as outlined in item #2 below. 2. CROSSINGS - Highway crossings are to be installed at or near right angles to highway and must be installed with an encasement pipe. Encasement pipe is also to be installed under normal center medians and is to extend from the top of backslope for cut sections and five (5) feet beyond the toe of slope for fill sections, unless an additional length is required as outlined in the "TRENCH EXCAVATION AND PIT LOCATION,, specification. All crossings under existing pavement must be installed as outlined in the "CONSTRUCTION OF HIGHWAY CROSSINGS BY BORE" Specification. The depth of cover for crossings shall be twenty-four (24) inches for non-plastic pipe and thirty (30) inches for plastic pipe under ditches. The encasement pipe must be a minimum of eighteen (18) inches or 1/2 the diameter of the pipe, whichever is greater below the bottom of the pavement structure. ' The encasement shall consist of a steel pipe around and outside the carrier pipe and support the load of the ground above the pipe, the highway, and the superimposed loads thereon, including construction equipment. The strength of th~ encasement pipe shall equal or exceed the structural requirements for highway drainage culverts covered under ASTM specifications. 3. ABOVE GROUND APPURTENANCES - Fire hydrants, air release valves, and other similar appurtenances shall be located at or near the right of way line. All fire hydrants will be equipped with breakaway bases and should not be located in the sidewalk. TxDOT- Dalla~ DJ.st ric~ Utility Sp~c - Water/SS 3/7/94 1. O~ - No dirt from a trench or pit excavation shall be placed on the roadway or shoulders. All equipment and stockpiled dirt shall meet the safety clear zone distances listed below or have adequate barricades and warning devices to protect the traveling public. Topsoil shall be kept separate from other excavation material, and be replaced in accordance with =SPECIFICATIONS FOR BACKFILL.' All pits and trenches shall be kept free from standing water. If trenchs and/or pits are left open for extended periods of time without a continuous progression of work, the utility will be required to backfill the trench and/or pits. In all excavations where sloughing is likely to occur, shoring will be utilized to prevent damage to the highway structure(s). The utility agency or contractor shall be responsible for maintaining trench excavation protection as required by provisions of Part 1926, Subpart P - Excavations, Trenching and Shoring of OSHA Standards. 2. TRENCHINQ - Longitudinal installations must be placed as near a uniform alignment to the right of way line as possible. This operation may be done by trenching machine or backhoe. If a uniform alignment cannot be maintained by use of a trenching machine, a backhoe will be required to obtain a more uniform alignment. 3. SAFETY CLEAR ZONE DISTANCES - Minimum clear zone distances required for trench excavations and bore pit locations are as follows. For UNCURBED Highways. A. Thirty (30) high-speed vehicles per day) highways. B. Sixteen (16) ft* from the edge of pavement of high-speed, volume (Less than 750 vehicles per day) highways. C. Sixteen (16) ft* from r~mps. D. Ten (10) ft* for low-speed (40 mph or less) highways. E. Ten (10) ft* for any paved intersecting side streets. ft from the edge of pavement (Traveled Lane) of (More than 40 mph), high volume (More than 750 low Five (5) ft MINIMUM from the edge of any shoulder. For CURBED Highways. A. Thirty (30) ft from the back of curb of high-speed highways. B. Five (5) ft from the back of curb, plus any additional distance to clear sidewalks, of low speed highways. C. Five (5) ft from the back of curb for any intersecting side street. BACKFILLING 1. GENERAL - As soon as practical, all portions of the excavation shall be backfilled. Trenches and pits. shall be backfilled with the material obtained from the excavation or from other sources. Backfill material will be free from stones of such size as to interfere with compaction; free from large lumps which will not break down readily under compaction; and free from frozen lumps, wood or other extraneous material. The TxDOT Inspector may reject any material containing more than twenty (20) percent byweight of material retained on a three (3) inch sieve. The portion of top soil removed from the original excavation shall be replaced, as nearly as feasible, in its original, position. 2. DEPTH OF LIFTS - That portion of backfill below the top of pipe shall be placed in uniform layers not to exceed eight (8) inches in depth (loose measurement). Backfill above the top of pipe shall be placed layers not to exceed ten (10) inches in depth (loose measurement). If the backfill is to support a portion of roadway or embankment, then the material will be placed in uniform layers not to exceed eight (8) inches in depth (loose measurement). 3. PROCEDURE FOR COMPACTION - Each layer of backfill material, if dry, shall be wetted uniformly to the moisture content required to obtain a density comparable with the adjacent undisturbed soil and shall be compacted to that density by means of mechanical tampers or rammers. The use of rolling equipment of the type generally used in compacting embankments will be permitted on portions which are accessible to such equipment. Water jetting or ponding will not be permitted. Special care shall be taken to ensure thorough compaction of material placed under the haunches of the pipe. Cohesionless materials, such as sand, may be used for general backfilling purposes. Compaction of cohesionless materials shall be done with vibratory equipment. 4. RESTORATION OF RIGHT OF ~AY - Prompt replacement of sod, removal of debris, and any other restoration necessary to restore the right of way to a condition equal to that which existed prior to the utility installation will be required. In areas of erosion, the use of stabilized backfill may be required. Should settlement or erosion occur within six(6) months of the utility installation, the utility agency will be required to reshape, reseed, and/or resod the area. U'.~ty Spe~ - 8a¢lc6d! ,Form 1082 (Rev. 09-93) (Previous Versions Obsolete) APPROVAL To: Hwy. No. Beg. RM Offset End RM Offset Maintenance Section No. County Date The Texas Department of Transportation (TxDOT) offers no objection to the location on the right-of-way of your proposed line as shown by accompanying drawings and notice dated except as noted below. Your attention is directed to governing laws, especially to Article 6674w-1, Vernon's Annotated Civil Statutes of Texas, pertaining to Control of Access. Acc_~s for serving this installation shall be limited to access via (a) frontage roads where provided, (b) nearby or adjacent public roads or streets, (c) trails along or near the highway right-of-way lines, connecting only to an intersecting road; from any one or all of which entry may be made to the outer portion of the highway right-of-way for normal service and maintenance operations. The Owner's rights of access to the through-traffic roadways and ramps shall be subject to the same rules and regulations as apply to the general public except, however, if an emergency situation occurs and usual means of access for normal service operations will not permit the immediate action required by the Utility Owner in making emergency repairs as required for the safety and welfare of the public, the Utility Owners shall have a temporary right of access to and from the through- traffic roadways and ramps as necessary to accomplish the required emergency repairs, provided TxDOT is immediately notified by the Utility Owner when such repairs are initiated and adequate provision is made by the Utility Owner for convenience and safety of highway traffic It is expressly understood that the TxDOT does not purport, hereby, to grant any right, claim, title, or easement in or upon this highway: and it is further understood that the TxDOT may require the owner to relocate this line, subject to provisions of governing laws, by giving thirty (30) days written notice. You are requested to notify this office prior to commencement of any routine of periodic maintenance which requires pruning of trees within the highway right-of-way, so that we may provide specifications for the extent and methods to govern in trimming, topping, tree balance, type of cuts, painting cuts and clean up. These specifications are intended to preserve our considerable investment in highway planting and beautification, by reducing damage due to trimming. The installation shall not damage any part of the highw~,, sna udequate provisions must be made to cause minimum inconveniences to traffic and adjacent property owners. In the event me owner fails to comply with any or all of the requirements as set forth herein, the State may take such action as it deems appropriate to compel compliance. General Special Provisions: Revegetation Speelal Provisions: In order to minimize erosion and sedimentation resulting from the proposed installation, the project area will be revegetated [] in accordance with TxDOT's Standard Specification Item 164 which specifies the appropriate grass seed mix to be used, or [] as indicated on the attachment. Please notify starting construction of the line in order that we may have a representative present. forty-eight (48) hours prior to Texas Department of Transportation By: District Engineer--District No. Form 1082 (Rev. 9-93) (Previous version(s) are obsolete.) Notice of Proposed Installation Utility Line on Controlled Access Highway To the Texas Transportation Commission do District Engineer Texas Department of Transportation Hesquite , Texas Date October 22, 1998 Formal notice is hereby given that The City of Coppell (~rith Beck as the contractor) C~mim~proposes to place a 12 inch waterline line within the right-of-way of S.H. 121 Texas as follows: (give location, length, general design, etc.) in Dallas 120 L.F. of 12" waterline located 10' into the east right-of-~ay of S.H. 121. (see attached plans for additional information) The line will be con.~tructed and maintained on the highway right-of-way as shown on the attached drawing and in accordance with the rules, regulations and policies of the Texas Department of Transportation (TxDOT), and all governing laws, including but not limited to the "Federal Clean Water Act," the "Federal Endangered Species Act," and the 'Federal Historic Preservation Act." Upon request by TxDOT, proof of compliance with all governing laws, rules, and regulations will be submitted to TxDOT before commencement of construction. Our firm will use Best Management Practices to minimize erosion and sedimentation resulting from the proposed installation, and we will revegetate the project area as indicated under "Revegetation Special Provisions." Our firm will insure that traffic control measures complying with applicable portions of the Texas Manual of Uniform Traffic Control Devices will be installed and maintained for the duration of this installation. The location and description of the proposed line and appurtenances is more fully shown by set~ of drawings attached to this notice. three complete Construction of this line will begin on or after the 22nd day of October ,19 98 By signing below, I certify that I am authorized to represent the Firm listed below, and that the Firm agrees to the conditions/provisions included in this permit. Firm City of Coppell By(Print) Kenneth 1/./~riffin, P.E. Signature '~-gv~~1 [ l ' Title Director of Eng/neertng & Public I~orks Address P.O. Box 478 255 Parkvay Blvd. Coppe11, TX 75019 Phone No. (972) 304-3679 INSTALL: 1 - 12"X8' TEE 1-8" VALVE 1-12" VALVE 1-12" PLUG INSTALL: 1-2' METERS/SERVICE .,."' (IRRIGATION) 2-2" METERS/SERVICES (oo~[sTIc) ( 12" WATER /' (INSTALL 120.L.F. / 25~25' /' · / / TEE 5'-: :'-' INSTAL[_' I-8' DOUBLE CHI DETECTOR VALVE, VAULT .t-8'x8'