Verizon-CS 980806DEVELOPMENT REVIEW COMMITFEE
ENGINEERING COMMENTS
ITEM: GTE Shared Services Center ~4ddition. Reolat and Minor Plat and Site Plan
Review. to allow the redefinition of a block and the creation of two new lots,
as well as to permit the development of two 5-story office buildings on Lot 1,
located at the northeast corner of Corporate Park Blvd. and State Highway
121, at the request of the Beck Group.
DRC DATE: July 30, 1998 and August 6, 1998
CONT~4CT: Mike Martin, P.E.,/lssistant City Engineer (304-3679)
COMMENT STATUS: PP~L ~2~'L~..r.'?.Y ,/FINAL ~
1. Any driveway access to S.H. 121 frontage road must be approved by the Texas Department of
Transportation.
2. Show the fight-of-way widths for both legs of Coppell Road so the City can verify that there is
enough right-of-way to reconstruct Coppell Road.
3. Need to show R.O.W. dedication for horizontal curve on Coppell Road at the northeast comer
of property for future alignment of Coppell Road.