Loading...
Verizon-CS 980730DEVELOPMENT REVIEW COMMITTEE ENGINEERING COMMENTS ITEM: GTE Shared Services Center Addition. Revlat and Minor Plat and Site Plan Review. to allow the redefinition ora block and the creation of two new lots, as well as to permff the development of two 5-story office buildings on Lot 1, located at the northeast corner of Corporate Park Blvd. and State Highway 121, at the request of the Beck Group. DRC DATE: July 30, 1998 and August 6, 1998 CONTACT: Mike Martin, P.E., Assistant City Engineer (304-3679) COMMENT STATUS: ~'PRELIMINARY ~ ~ 1. Show easements on utility plans for all vaults and meter boxes not located in City right-of-way. 2. Any driveway access to S.H. 121 frontage road must be approved by the Texas Department of Transportation. 3. A drainage area map for the entire site needs to be included. 4. Show 10' x 10' comer clip at the southeast comer of the property. 5. Show the right-of-way widths for both legs of Coppell Road. 6. Need to show R.O.W. dedication for horizontal curve on Coppell Road at the northeast comer of property.