Northlake 635(4)-LR010125 (2) GEOTECHNICAL AND ~ F:=I r-1 U F~
ENVIRONMENTAL CONSULTANTS
CONCRETE CYLINDER TEST REPORT
Coppell Tach Center II
1322 Crestside
Coppell, Texas
REPORTED TO: Bob Moore Construction Co. REPORT NO. 79
1110 N. Watson Road REG PROJECT NO. 7044
Arlington, Texas 76011 SAMPLE DATE: 01-25-01
ATTN: Mr. Ed T. McGuire TECHNICIAN: R. Estep
CONTRACTOR: Bob Moore Construction Co.
Location of Sample
Set Number I Location I Quantity Represented
1 Screenwall Piers: 134, 138 and 139. 10/14
Design Information
Is°urce °f c°ncrete ITXI Mix Identification 8273 I Specified Strength p.s.i. 3000
Test Results
Set Cylinder J I Age@ Total Load J CompressiveI Average
No. ID Date Tested Test lbs. Strength p,s.i, Strength p.s.i,
1 3088 02-01-01 7 105190 3720
3088 02-01-01 7 103140 3650 3690
3088 02-22-01 28 144970 5130
3088 02-22-01 28 142460 5040 5090
Cylinder Data
Set Cylinder Time of I I Concrete Air I Ticket
No. ID Slump Sample Air Temp. Temp. Entrainment Number
3088 4.75 2:00PM 54 57 N/A 2814539
Mail Submitted by:
Distribution: (1) Bob Moore Construction Co./
Mr. Ed T. McGuire REED ENGINEERING GROUP, INC.
(1) City of Coppell/Mr. LarryDavis
(1) City of Coppell/Mr. Lee Stone Original Signed By
(1) McHale Consulting Engineering/
Mr. Gary McHale Keith Atkins
(1) CMC-Commercial Realty/ KEA/je
Mr. Steve Huff
(1) AECC, Inc./Mr. Chad Stevens
2424 STUTZ DR. · SUITE 400 · DALLAS, TX 75235 · TEL [214] 350 5600 · FAX [214] 350 0019