Loading...
Prestwick-LR011108i G '~ GEOT'ECHNICAL ENGINEERING Et-ENVIRONMENTAL CONSULTING GEE Consultants, Inc. E· CONSTRUCTION MATERIALS TESTtNG 10046 Monroe Drive · Dallas, Texas 75229 · (214) 352-5433 · Fax (214) 352-6972 MOISTURE DENSITY RELATIONSHIP REPORT November 8, 2001 Project No: 200-0361 Test Report Date: Client: B.A.V. Development, Inc. Moisture Report No. 12 Sample Date: Octo Project: ~ Identification: I ' msture ensity e ationsnip Test Procedure: ASTM D698 Test Results: Method ......................................... A Optimum Moisture Content ........................... 11.2 percent Maximum Density ................................. 117.5 pounds per cubic tbot Rammer Type ..................................... Manual Material Description ................................ Brown and Reddish Brown Clayey Sand, imported Mae. rial OrUgin .................................... SE corner of project Moisture Preparation Procedure ......................... Air Dry Liquid Limit ..................................... 21 Plastic Limit ..................................... 15 Plasticity Index ................................... 6 Percent Passing No. 200 U.S. Sieve ...................... 20 Technician: AT cc: Mr. Bob Delsanter - B.A.V. Development. Inc. Mr. Rodney Louviere - Dowdey Anderson & Associates, Inc. ., Mr. Larry Davis - City of Coppell ~ , , Mr. Robert Hodges - Angelo Iafrate Construction, L.L.C. Mr. Royce Carter - H&W Utility Contractor ,, ~ ~~ ' Our letters and reports are for the exclusive use of the client to whom they are addressed. The use of our name must receive our prior written approval. Our letters and reports apply only to the sample tested and/or observed, and are not necessarily indicative of the quantities of apparently idemical or similar products. 1 o GEOTECHNICAL ENGINEERING , E GEE Consultants, Inc. [ EI 'C°NSTRUCTI°NMATERIALSTESTINGj 10046 Monroe Drive · Dallas, Texas 75229 ° (214) 352-5433 · Fax (214) 352-6972 MOISTURE DENSITY RELATIONSHIP REPORT November 8, 2001 Project No: 200-0361 Test Report Date: Client: B.A.V. Development, Inc. Moisture Report No. 13 Sample Date: October 22, 2001 Project: Prestwick Court identification: Moisture Density Relationship Test Procedure: ASTM D698 Test Results: Method ......................................... A Optimum Moisture Content ........................... 13.7 percent Maximum Density ................................. 112.2 pounds per cubic foot Rammer Type ..................................... Manual Material Description ................................ Light Brown Sandy Clay, imported Mat~al Origin ............... : .................... SE corner of project Moisture Preparation Procedure ......................... Air Dry Liquid Limit ..................................... 23 Plastic Limit ..................................... 12 Plasticity Index ................................... 11 Percent Passing No. 200 U.S. Sieve ...................... 38 Technician: AT cc: Mr. Bob Delsanter - B.A.V. Development. Inc. r'~ '~ / . Mr. Rodney Louviere - Dowdey Anderson & Associates, Inc. / Mr. Larry Davis - City of Coppell ~'~ Mr. Robert Hodges - Angelo Iafrate Construction. L.L.C. Mr. Royce Carter - H&W Utility Contractor t'/ ~t \\'ii' \ Our letters and repons are for the exclusive use of the client to whom they are addressed. The use of our name must receive our prior written approval. Our letters and reports apply only to the sample tested and/or observed, and are not necessarily indicative of the quantities of apparently identical or similar products.