Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Villages C P2-CS 871230
VILLAGES OF COPPELL CONSTRUCTION SCHEDULE I~ATER FIRE HYDRANT SET AND POUR BLOCKING BACKFILL LINE & HYDRANT INSTALL SERVICES CHARGE LINES REPAIR LEAKS RETEST SET VALVE BOXES SANITARY SE~ERS CLEAN SYSTEM LOCATE LEAKS EXCAVATE RELAY & COHPACT ltL~I'EST & RECLEAN Alit .TEST T.¥. ~ ~E~.~L DAHAGED PIPE & RETEST STOgN BACKFILL ~CXCAVATE & FO~ POUR (3DAY) STRIP & BACKFILL(3 DAY) SET ~,,NHO~ F~.~S & COVERS EXCAVATE & RECOHPACT SAND (~ ~p~_.~ ~CRADEING OF SITE SURVEY CRADING VILLAGES OF COPPELI_ CONSTRUCTION SCHEDULE WATER FIRE HYDRANT SET AND POUR BLOCKING BACKFILL LINE & HYDRANT INSTALL SERVICES CHARGE LINES REPAIR LEAKS RETEST SET VALVE BOXES SANITARY SEWERS CLEAN SYSTEM LOCATE LEAKS EXCAVATE RELAY & COMPACT RETEST & RECLEAN AIR TEST HANDRILL ~,B ~EI0~L DAHAGED PIPE & RETEST STORM SEWER ' BP~EAK WALL INSTALL PIPE POUR COLLAR BACKFILL INLETS ECXCAVATE & FORH (3 DAY) POUR (3DAY) STRIP & BACKFILL(3 DAY) SET ~-HOLE FP~U~ES & COVERS EXCAVATE & RECOMPACT SAND REGRADEING OF SITE .... SURVEY C]~DING