Villages C P2-CS 880129 P IERCE-LUNSFORD ASSOCIATES, INC.
CONSULTING ENGINEERS
Ref. No. 515348.10
CF SB1298
Mr. Steve Brooks
The Brooks Companies
8800 North Central Expressway
Suite 300
Dallas, Texas 75231
Subject: Water, Sanitary Sewer & Storm Drainage Improvements
Villages of Coppell, Phase II
Coppell M.U.D. No. 1
Coppel 1, Texas
Dear Mr. Brooks:
In your letter to me dated January 25, 1988, you requested that
Lloyd's U.S. furnish a bond in the amount of $13,125.00 to clear
up a Mechanic's Lien filed against the above subject project by
Armadillo Construction Services. The copy of the lien you
enclosed with the letter was very faint and difficult to read,
but it appears that the lien was filed for only $8,570.00. It is
my understanding that the surety can bond only the amount filed
by Armadillo. Please send me a legible copy of the lien and f.
will request that the surety furnish a bond for the amount stated
on the lien.
You also inquired about the District's schedule for completing
the utility contract for the Villages II project. Lloyd's U.S.
has assigned American Developers and Contractors Inc. to complete
the project, and the contractor has moved on site. A copy of the
District's punchlist for American as well as our notice informing
them to complete the work is enclosed. I understand American is
also under contract with you to complete the other items on the
City of Coppell's punchlist.
We have not directed American to complete Item No. 5 on the
City's pun--~list, repair of the millsap stone lake wall. The
removal of the wall was necessary in two locations for
installation of Storm Sewer Lines "B" and "C". Replacement of
the wall is to be performed "By Others" , as shown in three
places on Plan Sheet 10 of 14. A copy of this plan sheet, as
designed by Nathan D. Maier Consulting Engineers, is enclosed
for your review. The intent of the plans is very obvious, and I
have previously explained this to Jean Maier and Ed Toole. This
item would not have been eligible for reimbursement to the
Developer even if included in this contract, because it is
beyond the scope of a normal storm sewer headwall.
3109 CARLISLE, SUITE 206 3901 W. PIONEER PARKWAY, SUITE 100
DALLAS, TEXAS 75204 ARLINGTON, TEXAS 76013
(214) 871-2126 (817) 461-5868 Metro
January 29, 1988
Mr. Steve Brooks
PaGe 2
The District is anxious to complete this project as quickly as
possible to the satisfaction of all concerned parties. Please
call myself or Paul Phy if you have questions concerning this
matter.
Sincerely,
PIERCE-LUNSFORD ASSOCIATES, INC.
~.. ,,? :. '~.~, . -~ ,, .1,~ ·
Jeffrey M. Hawkins, P.E.
JMH/sh
cc: Mr. Paul Phy Ms. Jean Maier ~
Mr. Ed Toole
Mr. Lanny Land
Mr. Steve Morton